A swim spa that arrives as a standard box is rarely the right answer for a villa terrace, a resort garden or a compact courtyard. Before an order is placed, the conversation with the factory matters more than the model code on the datasheet. This article walks through the customisation points buyers should raise when specifying Outdoor Swim Spa WS-S04B, and what a supplier needs from you in order to quote a configuration that actually fits the site.
Start With the Shell, Not the Jet List
WS-S04B is listed in our catalogue at 3900 x 2200 x 1450 mm. That footprint is a starting reference, not a fixed constraint. For recessed installations, raised decks and irregular terraces we also produce customizable shape outdoor spas with square, round, oval and curved outlines, so the shell geometry is one of the first items to settle on the drawing stage rather than after production has started.
Share the civil drawings early. Shell shape, water depth and the position of steps change how people enter the water, how the seating benches sit and whether the spa can be partly sunk into a platform without cutting access to the equipment compartment.
Confirm Which Equipment Is Actually Included
The catalogue entry for this model shows 31 jets in total including 6 water columns, 3 water pumps, 1 filter pump, a single control system and LED lighting made up of 2 lights plus 28 small LEDs, with a listed total power of 10.35 kW. Treat these figures as the reference configuration for WS-S04B. Two configurations carrying the same model code can differ once options are added, so ask the supplier to restate the equipment list in the quotation line by line.
Three details cause the most disputes later and deserve a written confirmation:
- Whether a swim training system is part of the build. The catalogue record for WS-S04B does not list one, so if you want continuous swimming against a current, that has to be specified separately.
- The split between water pumps and the filter pump, and how each is switched: manual, timer or controller programme.
- Total connected power and the supply it assumes. Equipment loading drives the electrical work on site, so confirm amperage, phase and circuit protection with your electrician before the slab is poured.
Water Treatment and Sanitation Options
Ozone is shown for this model. Luxury outdoor swim spas with massage jets, LED and water features in the same range can be built with additional sanitation stages, and UV sterilisation appears as an option across our configurable swim and hydrotherapy line. If the spa serves hotel guests or a shared resort facility, discuss the sanitation chain as one system: oxidiser dosing, UV, ozone and filtration decided together, instead of buying individual add-ons.
Filtration is the other branch of that decision. Sand filtration is offered as an option on some configurations; state your preference and let the supplier confirm compatibility with this shell before it appears on the order.
Heating, Insulation and How the Spa Will Be Used
A heat pump is listed among the catalogue options. Whether you need one, and at what capacity, depends on answers to practical questions rather than marketing categories: what water temperature do occupants expect, how many months a year is the spa in use, is the location exposed to wind, and will a cover be fitted and used every night. Buyers specifying year-round hydrotherapy should raise insulation as its own line item, since insulation around the shell and equipment bay changes both running behaviour and the space needed for plant.
Lighting and Water Features
The reference build carries 2 LED lights with 28 small LEDs. Colour choice, whether lighting is zoned between the swim area and the seating benches, and how fixtures are accessed for servicing are all worth specifying. Neighbouring models in the range add waterfalls, so if a waterfall feature is wanted on this shell, ask for it to be shown on the drawing with its plumbing route visible.
Access, Steps and Site Interface
Steps are a catalogue option and one of the easiest things to get wrong. Decide whether steps are internal, external or integrated into the decking, and confirm the finished deck level against the shell height of 1450 mm in the catalogue record. Also confirm where the equipment compartment opens and how much clearance a technician needs: a spa boxed in on all four sides becomes difficult to service.
What to Send Your Supplier
| Item to provide | Why the supplier needs it |
|---|---|
| Civil and landscape drawings with finished levels | Sets shell shape, recess depth, step design and deck interface |
| Electrical supply details at the spa location | Drives heater sizing, circuit protection and equipment loading |
| Intended use: private family, hydrotherapy, or shared hospitality facility | Affects jet layout, sanitation chain and control system choice |
| Target water temperature and seasonal usage pattern | Determines heat pump capacity and insulation scope |
| Access route to the installation position | Decides whether the shell ships as one piece or in sections |
Where This Product Sits in Our Range
WS-S04B is one model inside a wider configurable line. If a longer swim lane is the priority, compare it against the long outdoor swim spa with hydrotherapy and relaxation pool, or browse the full swimming pools and swim spas category to see dimension ranges side by side. As a furniture and building materials manufacturer working on villa and hospitality projects, we coordinate the spa with adjacent outdoor works: decking, pergolas, loungers and poolside furniture, so one supplier carries the whole terrace package rather than several.
Send us the model code you are considering together with your site drawings, supply details and intended usage. We will return a configuration sheet that names every pump, jet, lighting fixture and sanitation stage included in the price, so nothing is left to interpretation at handover.
Talk to us about specifying a swim spa for your project through our turnkey villa and hospitality project solutions, and we will reply with the configuration sheet described above.