A procurement brief that lists "flexible stone cladding, travertine look, curved soffit" comes back from three suppliers with three different answers, because the phrase covers a material family rather than one product. This note sets out what to write into the brief so that a quotation for MCM Flexible Travertine Stone Veneer - Bendable Soft Stone for Interior & Exterior Wall Cladding is comparable, installable and verifiable before it reaches site.
What The Material Is, And Where It Earns Its Place
Modified clay material, generally shortened to MCM, is an ultra-thin stone-veneer sheet that stays bendable enough to follow curved and special-shaped surfaces where rigid stone slab cannot. SANTERSON describes its flexible travertine stone as a soft stone material that replicates the natural hole texture of original travertine, wraps curved walls and irregular surfaces, and is cut on site without heavy equipment; multiple colours are listed as in stock, with samples available on request.
The stated advantages for project work are lightness, flexibility for curved wall construction, weather resistance with anti-freezing and anti-crack properties for outdoor use, cutting on site with simple tools, and a natural stone look at a competitive price. For buyers the case for specifying it usually rests on one of three things: a design intent that includes curvature, a weight or structural limit on the building fabric, or a programme pressure where wet trades and heavy lifting on site are expensive. Where none of those apply, flat sawn stone or a panel system may be the more straightforward call, and the brief should say so rather than force the category.
The stated application range covers interior wall decoration and exterior facade cladding across hotels, restaurants, villas, shopping malls, offices and curved surface projects. The question for the buyer is which of those uses a given quotation actually covers, because a rate built for an internal feature wall does not answer for a facade.
The Eight Items A Procurement Brief Must State
Write these into the brief before going to market. Each one changes price, lead time or install method, and each one is a question a supplier will otherwise answer differently.
| Brief item | What to state | Why it changes the quotation |
|---|---|---|
| Application location | Interior or exterior, and for exterior work the exposure: shaded wall, driving rain, coastal salt air, pool deck splash zone | Exterior use drives adhesive selection, movement-joint detailing and edge termination; interior-only pricing is not comparable with exterior pricing |
| Substrate | What the sheets bond to: plaster, cement board, plywood, existing tile, blockwork, metal frame | Determines priming, levelling and adhesive system, and whether a boarding sub-contract sits ahead of the cladding |
| Geometry | Flat runs plus every curved element, with minimum radius for each curve and whether the surface is convex or concave | Tight radii affect which batch behaves well, how much cutting waste appears and whether a sample mock-up is mandatory |
| Finish and colour | Travertine tone, vein direction, surface texture, and whether grout lines are required or a seamless look is intended | Tone selection and batch consistency decide whether the wall reads as natural stone once installed |
| Quantity split | Total area by element, with a stated allowance for cuts, wastage and spares held on site | Pricing per square metre only compares fairly when wastage assumptions match between bidders |
| Bedding system | Whether the supplier supplies adhesive, primer and trims, or whether these are bought locally | A locally sourced adhesive that is not matched to the sheet can void the supplier's position on the finished wall |
| Corners, edges and penetrations | How external corners, window reveals, service outlets and floor lines are terminated | These details decide whether the job needs mitred returns, supplied trims or a design change |
| Interface responsibilities | Who prepares the substrate, who applies, who seals, and who signs off the snags list | Flexible veneer fails in practice through substrate and detailing errors far more often than through the sheet itself |
Sample And Mock-Up Requirements To Write Into The Brief
Do not accept a brochure page as evidence. Require each bidder to supply material for one physical mock-up panel and state who builds it, where, and by when.
- Bend test on the design radius. Wrap a sample around a formwork tube at the tightest radius in the drawings. Note cracking at the corners of the sheet, whitening at the crease and any recovery spring-back.
- Tone comparison under site lighting. Tape two sheets side by side and view them under the actual luminaire type and colour temperature the project uses. Travertine-look surfaces shift noticeably with warm light.
- Substrate pull-off. Fix a sample to the same board the project will use, leave it for the adhesive's stated cure time, then try to lift a corner by hand. Record whether the sheet or the adhesive failed.
- Water and stain check on exterior samples. Wet one exterior sample repeatedly and let it dry in sun; note any colour change, surface chalking or tide marks at the edges.
- Cutting behaviour. Have the installer cut a sample with the tooling they intend to use on site. Record edge quality and how much material is lost on a curved cut.
- Cleaning trial. Scrub a marked area with the cleaning regime the client's facilities team actually runs, then compare against an untouched area.
Ask each bidder to attach the technical data sheet, the adhesive system they recommend for your stated substrate and exposure, and their written position on exterior use. Where a project has statutory or performance requirements, have your local consultant confirm which standards apply in the destination market; do not accept a datasheet line as proof of compliance there.
Commercial And Logistics Terms That Belong In The Same Brief
Batch consistency and phased delivery
State the total quantity up front even if installation is phased, and ask the supplier to confirm how batches will be matched across deliveries. Tone drift between shipments on a continuous wall is a frequent complaint with stone-look sheet materials.
Customisation
If the design calls for a bespoke tone, texture or format, put that request in the first round of enquiries rather than after award. SANTERSON's Custom & OEM service covers custom design and prototyping, bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities and brand customisation such as engraving, embossing, logos and packaging. Confirm which of these apply to your order, the minimum quantity and any set-up cost before you rely on them.
Freight, paperwork and delivery point
Ask what the quoted price covers: packaging standard, pallet configuration, freight mode options, customs documentation and tracking. The logistics and door-to-door delivery service describes global freight forwarding by sea, air and rail, customs paperwork including commercial invoices, packing lists, certificates of origin and import permits, packaging and container loading, shipment tracking and door-to-door delivery. Confirm Incoterms, duties, insurance cover, transit time and the exact delivery point for your site case by case.
Installation support and after-sales
Ask whether written installation guidance is supplied, whether on-site guidance or supervision is available for the first panel runs, and what happens if a batch has to be replaced after fixing. The installation and after-sales support service lists on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance; verify the actual warranty terms, exclusions and response commitments in the contract for your market.
Buying It As Part Of A Wider Package
Wall cladding rarely sits alone on a schedule. Where the same supplier also carries wall panels, ceilings, flooring, cabinetry, lighting and sanitary fixtures, one purchase order and one coordination team cover the finishes package. SANTERSON supplies building and construction materials alongside furniture and interior fixtures as a one-stop furniture and building materials supplier, which shortens the vendor list a project has to manage. Breadth is not qualification, though: still test each product family on its own sample and its own data sheet.
A Worked Example: Writing The Brief For A Hotel Feature Wall
Take a curved reception wall in a hotel, with a travertine-look finish returning behind the desk and continuing onto two columns. The brief line that produces comparable quotations reads: MCM flexible travertine stone veneer, interior application, substrate cement board over metal stud frame, one convex curve at the radius marked on elevation A-3, external corners mitred on site, no visible movement joints on the visible run, quantity stated as installed area plus an agreed cutting allowance, adhesive and primer named by the supplier for that substrate, samples supplied for a mock-up panel before order.
The same structure applies to exterior work, with two changes: exposure is stated in plain words rather than left to the drawing, and the supplier is asked to confirm their position on the fixing system, edge termination and movement joints for that exposure. If they will not commit in writing, the item stays provisional in the bill of quantities.
A Short Scoring Sheet For The Bid Returns
| Criterion | Evidence required from the bidder |
|---|---|
| Brief answered in full | All eight brief items addressed in writing, not left as "to be advised" |
| Mock-up result | Bend test at your radius, tone check under your lighting, pull-off on your substrate |
| Bedding system named | Specific adhesive and primer for the stated substrate and exposure, with data sheets |
| Detailing proposed | Corners, reveals, movement joints and penetrations drawn or described |
| Commercial clarity | MOQ, batch matching across phased deliveries, wastage basis of the rate |
| Logistics and after-sales | Named Incoterms, insurance position, paperwork scope, warranty terms and spares route |
Before The Procurement Brief Goes Out
Attach three documents to every enquiry: the elevations with every curved element dimensioned and its radius marked, the substrate schedule for each wall, and the table of eight brief items above for the supplier to complete. A bidder who returns it completed, with a mock-up that survives your bend test and a named bedding system, can be compared line by line against the next one in a project procurement brief. A bidder who cannot is selling a photograph.
Send SANTERSON your cladding drawings. As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, we quote flexible MCM stone veneer for interior and exterior wall cladding with the brief items above answered in writing, plus custom/OEM options, freight and installation support.