A swim spa quotation only works when the supplier and the buyer are looking at the same product. For Outdoor Swim Spa WS-PC07ST-L, the difference between a rough estimate and a firm project price usually comes down to six items: shell size, the equipment set included, the options added, the site conditions, the delivery terms and the electrical supply. Here is exactly what to send us so we can quote this model properly.

Start With the Model Code, Not Just a Length

The PC07ST family shares one shell shape across several variants, and the length changes between them. The catalog lists WS-PC07ST-L at 7490 x 2400 x 1470 mm, while the standard WS-PC07ST and the WS-PC07ST-S are listed at 7000 x 2400 x 1470 mm. The -S variant also carries an automatic cover option in the catalog. A quotation request that says only "about 7 meters, with jets" leaves us guessing which of these you want, and the guessed answer is often not the one you compare prices on later.

If you are still deciding between lengths rather than fixed on this model, tell us the usable length of your terrace, deck or plant room and we will match the closest shell in our Swimming Pools and Swim Spas range. Where a standard footprint does not suit the space, our Customizable Shape Outdoor Spa covers personalized hydrotherapy pools in square, round, oval and curved layouts.

The Equipment Set We Quote As Standard

These are the figures published for WS-PC07ST-L in our product catalog. Send them back with your enquiry and we can confirm them line by line, because availability varies with the configuration you choose.

ItemCatalog entry for WS-PC07ST-L
ModelWS-PC07ST-L
Catalog dimensions7490 x 2400 x 1470 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4
Total power6.55 kW
Water pumpNot listed in the catalog specification for this model; confirm it on your quotation
Features shownWater jets, LED lighting, Ozone, Swim training system

One point worth flagging early: the water pump is not stated in the specification we hold for this model. Please do not assume it is included or excluded until it appears in your written quotation. The same applies to total power, which changes as soon as heating is added.

Options That Change the Price

Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each one moves both the price and the power figure, so we need your selection before we can produce a comparable number:

  • Heating. A heat pump changes running load and cabinet layout. Tell us whether the spa will be used year-round or seasonally, and the coldest month at the site.
  • Insulation. Relevant for cold-climate sites and for spas installed in an unheated plant room or outdoors.
  • Filtration. Sand filtration is offered as an option alongside the standard filter pump; state which you prefer.
  • Sanitation. Ozone appears in the standard feature list; UV sterilization is a catalog option. Confirm what your local authority or project spec requires.
  • Access and cover. Steps are listed as an option, and the automatic cover appears against the -S variant. Ask us to confirm whether a cover can be added to your chosen configuration.

Site Conditions We Need Before We Can Quote Properly

These questions take two minutes to answer and save days of revision:

  • Installation type. Above ground on a deck, semi-recessed, or fully in-ground with a surround? This decides the cabinet finish, access panels and steps.
  • Foundation. Who is pouring the slab or building the plinth, and what load rating has the engineer specified? A 7.5 m shell filled with water is a structural decision for the builder, not for us.
  • Access route. Can the shell reach the site intact, or does it need to be lifted over a wall or through a gate? Note ceiling heights, gate widths and crane access.
  • Electrical supply. Voltage, phase and available breaker capacity at the plant room. Our total power figure is for the spa; your local electrician sizes the circuit, protection and any required isolation.
  • Drainage and overflow. Where the drain line runs, and whether a pump-out point is provided.
  • Surrounding works. If the swim spa sits inside a wider landscape or terrace package (decking, paving, villa poolside furniture, screening), say so. Coordinating these with one supplier is something we handle as a turnkey interior project rather than as separate orders.

Delivery, Terms and After-Sales Details

Tell us the delivery city and whether you want door-to-door delivery or a port-only quotation. Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. For an oversized item like this, the packing list, container type and unloading method all belong in the quotation, so we ask who will provide the crane or forklift on arrival.

We also need to know whether installation and after-sales support are required at site. Our installation and after-sales support covers on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Warranty terms, response times and exclusions differ by project, so we set them out in writing rather than assuming a standard package.

Project context. SANTERSON has been supplying furniture and building materials since 2008 as a one-stop project furnishing supplier for villa, hospitality and office projects, with published villa references in Willoughby, Perth, North Turramurra, Melbourne and Sydney. A swim spa ordered as part of an outdoor living package is quoted alongside the rest of that scope, which keeps the shell, the surrounding furniture and the freight on one document instead of three.

Frequently Asked Questions

Can you quote from a photo of the model?

Yes, but include the model code as well. Photos of the PC07ST shells look close to each other, and the 490 mm difference between -L and the standard shell is easy to miss in a picture.

Can the dimensions be changed?

Standard shells are quoted at catalog dimensions. Where the space needs something different, we also offer spa shells with customized shapes, so send us your drawing and we will tell you whether a bespoke shell or an existing footprint is the cheaper route.

Do you supply the swim training system?

One swim training system set is listed for WS-PC07ST-L in our catalog. Please still confirm it on your quotation, because the equipment list follows the configuration ordered.

Send Your Enquiry

For a firm quotation on Outdoor Swim Spa WS-PC07ST-L, send: the model code, your chosen options, installation type, foundation status, access route, electrical supply, delivery city and whether site installation is needed. Contact PHILLIP on WhatsApp +86 13928214007 or email santerson@qq.com, or use our contact page. Lead with the model code and we will confirm every specification line in writing before you compare prices.