A swim spa arrives on site as a finished shell, but it becomes a working installation only when the drawings behind it are complete. For the Outdoor Swim Spa WS-S08B, a 7800 × 2200 × 1500 mm unit in our outdoor swim and hydrotherapy range, the installation plan has to settle six questions before the container is loaded: where the shell sits, what carries its weight, how water and power reach it, who operates each system, and what happens when something needs attention later. Write those answers down and the site work stops being improvised.
1. Site selection and access route
Start with a measured plan of the terrace, garden or pool deck, marked in millimetres rather than estimated paces. The catalog dimensions above describe the shell; the installation footprint also needs working clearance for the filter pumps, control systems and anyone who later services them. Add the path the unit travels from the kerb to its final position: gate width, overhead cables, tree roots, turning space for a crane or forklift, and whether the surface it crosses is rated for that load.
- Confirm the finished position on the drawing and mark it on site with pegs, including the orientation of the waterfall and the jet side.
- Record the delivery route in writing, with photographs of the tightest points, so the lifting method is decided before the truck arrives.
- Check local approval requirements early. Pool barriers, fencing and permit rules differ by state and council, and we do not issue those certificates for you.
2. Foundation and load path
A fully filled spa of this size is heavy, so the slab or pedestal system under it must be specified by a local structural engineer who has seen our shell dimensions and point loads. The plan should state the finished level of that base, because the shell is set level and the surrounding deck finishes to it, not the other way round.
- Attach the engineer's note to the project file, together with the reinforcement or pedestal detail they specify.
- State drainage falls around the base, plus a route for overflow and for any water drained out during maintenance.
- Note insulation and steps where those options are ordered, since both change the finished height of the installation.
3. Power supply and electrical schedule
The catalog lists a total power figure of 14.6 kW for this configuration, along with two control systems, four water pumps and two filter pumps. Treat that figure as the starting point for the electrician's load calculation, not as a substitute for it. Supply voltage, protection devices, cable routing and the location of the isolator are set by your local electrical contractor to the rules that apply at the address.
| Item in the plan | What must be recorded |
|---|---|
| Supply and protection | Voltage, circuit rating, isolator position, earthing arrangement as specified locally. |
| Control points | Where the two control systems are mounted and who can reach them. |
| Cable routes | Trench depth, conduit size, separation from water pipework. |
| Options ordered | Heat pump and UV sterilization change the load; list them on the same schedule. |
4. Water, filtration and treatment
The unit is shown with water jets, LED lighting, ozone and a waterfall, and the catalog specification lists 98 jets in total. The plan needs to say how the spa is filled, where top-up water comes from, how often the sand filtration or standard filter is serviced, and who stores chemicals on site. Ozone reduces but does not replace routine water testing.
- Mark the fill point, drain point and any permanent plumbing runs on the drawing.
- Write a maintenance rhythm the owner will actually keep: filter cleaning, water testing, cover use.
- List optional equipment included in your order — heat pump, sand filtration, UV sterilization, insulation, steps — because each one adds a service task.
5. Commissioning and handover
Close the plan with a checklist that both sides sign. Fill the shell, run each pump and jet group, check the LED circuits and the ozone unit, confirm the waterfall behaves as designed, and record any snag with a photo and a fix date. Handover is not finished until the owner holds one document set: as-built drawings, the equipment list for their configuration, wiring notes from the electrician, and the contact route for spare parts.
Included equipment and electrical requirements vary by configuration, so confirm them against your order before the plan is signed off. Dimensions and component counts quoted here are the catalog values for this model; your quotation governs what ships.
How we support the rest of the package
We supply the shell and its systems, and we also coordinate the surrounding work through our installation and after-sales support service — on-site installation, inspection with a snag list, warranty coverage and spare parts. Poolside furniture from the same outdoor furniture programme is specified to the same deck level and finish palette, so loungers, dining sets and shade structures arrive with the spa rather than six months later. Our logistics and door-to-door delivery service handles freight by sea, air or rail, packaging, container loading and the paperwork that goes with an imported project order.
Send us your site plan, the configuration you want and the address, and we will return a specification sheet and a quotation built around that installation plan. Enquiries reach our team directly through the contact page.