Stone and marble rarely cause trouble because the material is wrong. They cause trouble because the drawing, the panel schedule and the wall that exists on site do not agree with each other. This guide sets out how we take Santerson Stone & Marble Surfaces and Santerson Stone & Marble Panels from a design intent on paper to an installed result that matches the opening, the level line and the wet services behind the wall.

Start With What the Drawing Actually Commits To

Before a single panel is cut, we read the design pack for three things: which surfaces are stone, which are a decorative finish standing in for stone, and which dimensions are fixed by other trades. A villa or hospitality drawing will usually show elevation views with finish keys, but it will not always resolve joint positions, edge details at reveals, or how the material returns around a window head. Those gaps are normal - they are what the coordination stage is for.

Our Interior Design Services team works from your drawings to produce space layout planning, furniture layouts and 3D visual renderings, and then moves into project design coordination covering drawings, production coordination and on-site guidance. For stone that means we convert elevations into a panel-by-panel schedule rather than treating an elevation as a cutting instruction.

The Site Survey Is Where Stone Projects Are Won or Lost

Made-to-measure sizing only helps if the measurement reflects the wall you will build on. We ask for, and where possible carry out, a site check covering the following before production is released:

  • Finished floor level and datum line. Stone thickness changes setting-out. Confirm the build-up - adhesive, backing, the panel itself - so the finished face lands on the designed line rather than proud of a reveal.
  • Out-of-plumb and out-of-square walls. Older villas and renovation work rarely give true planes. Record the deviation at corners and openings; we set joint positions to absorb it instead of leaving a visible taper at the most prominent corner.
  • Opening sizes and reveals. Window heads, door jambs and ceiling junctions need the exact depth of the return, not just the face dimension.
  • Wet services and set-out points. Basins, mixers, wall-hung pans, mirrors and lighting outlets must be located against the stone face. Where a vanity top is involved, tap holes, overflow positions and the fall to the waste are fixed at fabrication, so they need to be confirmed before cutting.
  • Access and handling routes. Panel size is limited by what will fit through the stairwell, lift or doorway - this decides whether a wall is one slab or three panels with joints.
Practical rule: any dimension that another trade can change late - a screed thickness, a tiling return, an electrical first-fix position - should be re-confirmed at the point of release for production, not only at the time of the initial survey.

Matching the Material to the Substrate and Environment

Not every surface in a design pack should be solid stone. Choosing the right product family at coordination stage avoids both over-specification and a finish that will not survive its location.

Location on the drawingsWhat we coordinate
Bathroom vanity tops, basins and counter areasSanterson Stone & Marble Surfaces are configured per project with made-to-measure sizing and material and finish options. At coordination stage we confirm the countertop fit, the basin type - integrated, undermount or above-counter vessel - the tap and overflow positions, and the installation requirements for the chosen configuration.
Residential wall systems, feature walls, partitionsSanterson Stone & Marble Panels sit within our Paneling Systems and Custom Partitions & Paneling collections. Finish, layout and dimensions are specified to suit each space, so the drawing must fix joint grid, panel direction and edge treatment before fabrication.
Curved walls, arches, special-shaped structuresRigid slabs cannot wrap a curve. For these we specify flexible stone instead - flexible rock stone panels and MCM flexible travertine stone veneer are thin, lightweight sheets that follow curved surfaces, can be cut and worked on site without heavy equipment, and roll up for packing.
External facades and exposed elevationsFlexible stone products are offered with weather-resistant properties, including anti-freezing and anti-crack characteristics for outdoor use. Fix the fixing method, the drainage detail at the base and the movement-joint positions on the drawing before ordering.

For curved and flexible work, the single most useful thing to add to a drawing is a developed (unrolled) layout of the surface. A radius on an elevation tells us the shape; a developed grid tells us where the joints should fall and how much material the curve consumes.

Reading Back Our Shop Drawings Against Yours

Once we have the survey and the specification, we issue a fabrication layout for sign-off. This is the step that prevents most site problems, and it is where your architect, builder and we need to agree in writing. A returned layout should show:

  • The panel grid with every dimension from a fixed datum, not from an assumed wall face.
  • Joint positions relative to openings, corners and the room's main sight line.
  • Edge profiles, mitres and how the material meets skirting, ceiling and door linings.
  • Cut-out locations for mixers, wastes, brackets, sockets and downlights, dimensioned from the same datum as the panel grid.
  • Panel weights and handling notes where a piece will not pass a stair or lift.

Sign-off at this stage is what we treat as the release point for production. Changes after it are possible, but they re-open fabrication time, so we advise clients to hold one coordinated review with all trades present rather than collecting comments separately.

Sequencing Delivery, Storage and Installation on Site

Stone is the finish that other trades damage. Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery - but the delivery date only works if the site is ready to receive it. We coordinate:

  • Delivery window against wet trades. Plastering, screed and painting should be complete and dry before stone arrives, so panels go straight to the wall rather than sitting in a corridor.
  • Storage on site. Panels stored flat, dry and off the ground, with the packing sequence matched to the installation sequence - the first panel needed must be the last one loaded.
  • Substrate readiness. Backing, blocking and structural fixings must be in place and inspected before fixing begins; a wall that looks finished may not carry the load.
  • Trade order around the stone. Sealers, silicone joints, ironmongery, mirror fixings and final electrical trims are scheduled after the panels are set, so they do not disturb the setting-out.

Our furniture installation for interior projects and after-sales service includes on-site installation, inspection with a snag list, warranty coverage, spare parts and replacement, and ongoing maintenance. For stone specifically we ask the site team to confirm adhesive open time, ambient temperature and curing conditions before fixing starts, since these are the variables that cause movement or bond failure later.

Handover Checks That Prove the Coordination Worked

At completion we walk the installation against the signed-off layout. The checks worth insisting on:

  • Joint widths consistent across each run, with no tapering joint at a prominent corner.
  • Finished face flush with reveals, linings and adjacent finishes within the agreed tolerance.
  • Cut-outs centred on their fixtures, with no chipping at edges.
  • No lippage between panels where a hand running across the joint would catch.
  • Sealant lines clean and matched to the stone colour, with movement joints left unfilled where the detail requires them.

Any item that fails goes on the snag list, and spare panels are held against future damage rather than discarded at handover.

A Short Checklist for Your Next Stone Package

  • Confirm which surfaces are stone and which are a flexible or decorative alternative.
  • Survey after other trades' build-ups are fixed, and re-confirm late-changing dimensions before release.
  • Issue and sign off a fabrication layout with a single datum used for every dimension.
  • Check panel sizes against access routes before the cutting list is final.
  • Book delivery only once substrates, backing and wet trades are complete.
  • Inspect against the signed layout and record snags in writing.

Send us your drawings and we will come back with a coordinated stone package.

Share elevations, the room schedule and any site constraints you already know about. As a one-stop furniture and building materials supplier, we handle material selection, product specification, manufacturing and quality control, project management and site coordination through to final installation and handover - with turnkey villa furnishing and custom & OEM service available when a design calls for something outside the standard catalogue.

Dimensions, materials and technical performance are confirmed per project configuration, so every specification in this article is treated as an item to verify with your own drawings before production.