A modular living system with integrated lighting sits at the meeting point of joinery, electrical work and interior finish. That is exactly why approval on this item rarely fails for one reason only — it fails because several small confirmations were left open until production had already started. The checklist below sets out what a project team should have in writing before signing off a Santerson Modular System with Lighting (Living System) for a villa, apartment or hospitality room.
Start With the Wall, Not the Unit
Modular living systems are made to measure. Santerson's Modular Living Systems collection is described as configurable in layout, dimensions, material and finish for each space, which means the drawing set has to reflect the actual site condition rather than a showroom configuration. Before approval, ask the design team to confirm:
- Setout dimensions from a surveyed site, not architectural drawings alone — floor level, wall plumbness, skirting heights and any recesses that change where the unit lands.
- Fixing method and substrate. A system fixed to timber framing behaves differently from one fixed to masonry or to a lightweight partition, and load-bearing shelves change the requirement again.
- Clearances for doors, switches, outlets and air diffusers, drawn at the same scale as the joinery elevation so clashes are visible on paper rather than on site.
- Floor protection and transition details where the unit meets light European oak engineered wood flooring, tile or carpet, including expansion gaps.
The Lighting Specification Is Where Approvals Slip
Integrated lighting looks simple in a rendering: a strip glows, a niche reads bright. In production it becomes a set of decisions that must be closed out before panels are cut. For any Santerson modular living wall specified with integrated light, the following should appear on the approved drawing:
| Item to confirm | Why it matters at approval stage |
|---|---|
| Light source type and location | Strip, puck or profile determines the rebate or channel that has to be machined into the panel. Adding light after manufacture usually means re-cutting. |
| Driver and transformer position | Drivers need a reachable, ventilated location with an access panel. Concealing one behind a fixed carcass creates a maintenance call you cannot close. |
| Voltage and control method | Switching, dimming or sensor control must match what the electrical contractor has already run in the wall. |
| Wiring route and termination point | Who runs the feed to the unit — the electrician or the joinery supplier — needs naming on the drawing, otherwise the handover point gets missed. |
| Colour temperature and output | Confirm against the room's other decorative lighting fixtures so the wall does not read a different colour from the pendants beside it. |
| Compliance and fitting standard for the destination market | Electrical acceptance differs by country. Confirm which standard applies to the installed product before sign-off, and record who certifies the connection. |
A practical test: if the approved drawing does not show a dimension for every light position, a named driver location and a marked handover point for the electrical feed, it is not yet an approval document — it is a picture of one.
Confirm the Configuration Against How the Space Is Used
Modular systems are sold as flexible, and that flexibility is real, but it is only useful if the mix of open and closed storage matches the client's brief. Santerson's Modular Living Systems range covers several configurations — floor to ceiling modular systems, mixed open and closed systems and closed modular units — each with its own implications for fixing, load and cleaning access. For hospitality work, compare against the shelving-side options in the same catalogue, such as Santerson Integrated Lighting Systems, where the lighting detail is developed as part of a modular shelving wall instead of a living wall.
Points worth writing into the approval note:
- Which compartments are open, glazed or closed, and who signs off that split — interior designer, operator or end owner.
- Shelf spans and expected loads. Display items, books and stone objects load a shelf very differently, and span tables should be checked before the panel thickness is fixed.
- Door and drawer hardware, including opening direction and clearance in front of the unit when adjacent doors are open.
- Finish sample approval against the room's other surfaces — wall panel systems, veneer cabinetry and metal screens all shift how a wood tone reads under artificial light.
Sample, Drawing, Then Production — In That Order
Santerson works to project-specific dimensions and finish options, and its custom and OEM service covers bespoke materials, finishes and prototyping. The sequence below keeps that flexibility from turning into rework:
- Physical finish sample signed against the drawing reference, with date and project code on the back of the board.
- Coordinated elevation and section showing lighting positions, driver access, services and clearances, issued to the electrical contractor as well as the site team.
- Named signatories for joinery, lighting and electrical coordination. One signature covering all three is how conflicts reach site.
- Delivery and installation sequence agreed before manufacture — where the units land on site, when the wall is ready, and which trade closes the joint afterwards.
Keep the Finish Schedule Aligned Across Packages
A modular wall rarely arrives alone. In a villa or guest-room fit-out it travels with wardrobes, media units and custom built-in kitchen cabinets, and every one of those items carries its own revision number and finish code. Before releasing the modular unit into production, check that all packages reference the same finish schedule and the same drawing revision; mismatched revisions across packages cause more delay than any single product decision.
Questions Project Teams Ask Most Often
Can lighting be added to a modular unit after manufacture?
It can sometimes be retrofitted with surface-mounted profiles, but the clean result — light recessed into a shelf rebate or channel — requires the machining detail to be on the drawing before panels are cut. Confirm the lighting layout at the same time as the joinery layout.
Who is responsible for the electrical connection?
That boundary should be stated on the approved drawing and in the purchase scope. In most projects the local contractor supplies and terminates the feed, while the unit supplier provides the light fittings and driver arrangement. Record it explicitly so neither party assumes the other.
Do modular systems suit hospitality rooms as well as villas?
The range is specified for residential living projects, and comparable modular walls are used across guest-room and lounge fit-outs. For a hotel or serviced-apartment application, confirm the finish durability, edge treatment and cleaning regime you want with the supplier before approval, since housekeeping wear is heavier than domestic use.
Approval of a modular system with lighting comes down to three documents: a surveyed setout drawing, a lighting layout with driver access and handover point marked, and a signed finish sample. When all three exist and are dated, the unit can go into production without the site team guessing. Santerson is a China-based custom furniture manufacturer whose project service covers design coordination, custom and OEM manufacturing, logistics and installation support — send your elevation drawings and lighting layout to start the specification review.