A wall-hung basin that carries a project's design intent usually causes the most rework when it is specified late and described loosely. The Wall Hung Ceramic Basin 1050WC, Luxury Gold Line Wall Mount Sink is one such item: a tall, slim, decorative sink chosen as a visual feature in boutique hotel bathrooms, villa powder rooms and high-end residential renovations. This guide shows procurement teams how to write a brief that holds the design intent while protecting the plumbing, structural and handover realities behind it.
Why the 1050WC Ends Up in Feature Bathrooms
The 1050WC is not a space-saving pick; it is a statement piece. Its tall vertical body and slim profile read as a sculptural element against a finished wall, and the gold line accent ties it to metal hardware, mirror frames and light fittings already specified in the room. The page description lists the size as 410×340×620 mm, with wall fixing through a back panel reinforcement. That combination is what makes the unit attractive for a feature position and also what makes it sensitive to coordination errors: a tall wall-hung body carries load away from the wall face, so the fixing detail and the finished-wall build-up matter as much as the finish.
The basin is part of the 1050 matching sanitary collection, which also includes the Washdown One Piece Toilet 1050A and the shorter Wall Hung Ceramic Basin 1050WB. Specifying within one collection is a practical way to keep gold accents, glaze and silhouette consistent across guest bathrooms, and it reduces the number of separate submittals your consultant has to review.
The Six Sections a Procurement Brief Needs
A brief that only names a model number leaves every downstream party guessing. Write six short sections, and keep each one answerable by a supplier in one reply.
1. Scope of application
State where the unit sits and how hard it will be used: guest powder room, villa ensuite, boutique hotel public washroom, or a show apartment. Duty level drives glaze maintenance expectations, hardware quality and how much clearance you allow around the basin.
2. Design intent and finish reference
Name the accent explicitly ("gold line detail, matched to tapware finish X") and attach a reference image from the product page. If the gold tone must match another element in the room, say so in the brief rather than leaving it to a shop drawing.
3. Dimensional envelope
Give overall dimensions, finished floor level, finished wall line and the clear zone required for use and cleaning. Because the basin is wall-fixed with a back panel, the thickness of the finished wall build-up changes the fixing detail. Record the wall construction type alongside the dimensions.
4. Interface conditions
List what the basin must connect to: water supply and isolation valves, waste outlet position, trap type, faucet hole arrangement, mirror and lighting positions, and any wall panel or tile edge that meets the back panel. Pre-drilled faucet holes are stated for this model; confirm the tapware you intend to use sits correctly in that hole before ordering.
5. Quantity, phasing and site storage
Ceramics arrive as breakable goods with long lead times on decorative pieces. Give quantity by room type, the installation sequence, and where the units will be stored on site. Batching delivery by floor or wing reduces double handling and damage claims.
6. Acceptance and handover
Define what "accepted" means: glaze free of chips and crazing, gold accent free of scratches, secure fixing with no movement under load, correct waste connection with no leak under test, and cleaning instructions handed over with the unit.
Data Table to Attach
Attach a table like this to every enquiry so quotes are comparable line by line. Fill values from the supplier's current technical sheet; do not carry numbers across from marketing copy.
| Item | What to record |
|---|---|
| Model and variant | 1050WC tall wall-hung basin, gold line accent; confirm the exact current variant code with the supplier. |
| Overall size | Page description states 410×340×620 mm. Verify against the technical sheet you receive with the quote. |
| Material and glaze | Vitreous ceramic body, glazed surface. Ask what the supplier states about resistance to staining, yellowing and mineral deposits for this range. |
| Fixing method | Wall-mounted with back panel reinforcement. Confirm fixing bracket type, load rating and the wall construction it is approved for. |
| Waste and trap | Confirm trap type and rough-in dimension. These are not stated on the product page; request them in writing. |
| Faucet provision | Pre-drilled faucet hole. Confirm hole count, diameter and the tapware range proven to fit. |
| Matching items | 1050A toilet, 1050B stand basin, 1050WB wall basin. Note which rooms use which combination. |
| Packing and spares | Packaging standard, container loading plan, breakage allowance and spare-unit policy for the project. |
Common Rework Triggers and How the Brief Prevents Them
- Wall build-up discovered late. Tile, panel or stone thickness changes the depth at which the back panel meets the wall. Require the finished wall line on the drawing before the fixing detail is issued.
- Tall silhouette clashes with mirror or lighting. A 620 mm-tall body competes with sconces and cabinet bottoms. Coordinate reflected height and clearance in one composite bathroom elevation rather than separate trades' drawings.
- Tapware mismatch. A pre-drilled hole fixes the position but not the geometry of the tap. Require a tapware sample or dimensional drawing at submittal stage.
- Collection split across suppliers. Ordering 1050WC from one source and 1050A from another produces visible tone differences in the gold accent. Keep the collection on one purchase order where possible.
- Undocumented rough-in. Absence of trap and rough-in data in the brief is the most common cause of on-site modification. Make it a required attachment, not an optional question.
Working with a One-Stop Supplier on Bathroom Fixtures
When basins, toilets, showers, vanities, cabinetry, lighting and wall finishes all come from separate vendors, the coordination burden falls entirely on the contractor. Sourcing through a one-stop furniture and building materials supplier lets one party hold the bathroom schedule, the submittal register and the packing plan for several of these packages at once. SANTERSON operates as a China-based manufacturer and supplier of furniture and building materials, with services covering design coordination, custom and OEM production, logistics and door-to-door delivery, installation and after-sales support.
That structure suits projects in Australia and elsewhere where the same team furnishes villas, boutique hotels and offices. The company's published project references include villas in Sydney, Melbourne, Perth, Willoughby and North Turramurra. Treat those as evidence of the kind of work undertaken, not as a promise about local stock, local installation crews or compliance with a particular code — confirm scope, terms and responsibilities for your own project.
Where a decorative finish such as the gold line on 1050WC has to match something bespoke in the room, the custom and OEM service is worth raising at brief stage rather than after a catalogue unit has been ordered. Finish samples should be approved before production, with the approved sample kept on site as the acceptance reference.
Questions Worth Asking Before You Order
Can 1050WC and 1050WB be used in the same project?
Yes, and they are designed as part of one collection. 1050WB is the shorter wall-hung basin with a trapezoid silhouette, suited to secondary bathrooms and tighter layouts; 1050WC is the tall feature unit. A practical approach is to reserve 1050WC for rooms where it can be seen as a designed object, and use 1050WB where clearance or head height is constrained.
What should the brief say about cleaning and maintenance?
Ask the supplier for the cleaning method recommended for this glaze and for anything to avoid, especially around the gold accent. Write that guidance into the handover pack; it protects both the client's expectation and your defect liability position.
How should breakage risk be handled?
Agree packaging standard, loading plan, a breakage allowance in the quantity, and who bears replacement cost and freight for damaged units. Fix this in the order terms, because decorative ceramics are rarely held as local stock.
Send us your bathroom schedule
Share room types, quantities and the finish references you are working to, and we will return a specification sheet with verified dimensions, fixing detail and waste configuration for 1050WC together with the matching 1050 collection. Contact details are on our contact page.