A swim spa that is quoted as a standard catalogue item and one that is delivered to suit the actual site are rarely the same product. Before an outdoor swim spa such as the WS-PC01 moves from a bill of quantities into production, the buyer and supplier need to agree on a short list of configuration decisions. Those decisions change the equipment set, the power draw, the way the shell is supported, and ultimately how the finished unit performs for the people who use it.

This article sets out the questions a procurement team, contractor or villa owner should put on the table when specifying WS-PC01, and why each one matters at the quotation stage rather than on site.

Start From the Catalogue Baseline

The published specification for WS-PC01 gives you a starting point, not a fixed scope. The catalogue lists a footprint of 3000 x 1050 mm, one control system, two water pumps, one filter pump, 53 jets in total, one LED light and a total power figure of 6.65 kW. Water jets, LED lighting and ozone treatment are the features shown for this model.

Two things follow from reading that list carefully. First, the swim training system is not listed for WS-PC01 in the catalogue record, so if a project requires lap swimming against a current, that has to be raised as a separate question instead of assumed. Second, a total power figure belongs to a specific configuration. Add or remove a heat pump and the number moves, which means the electrical supply on site cannot be designed from the catalogue sheet alone.

Treat every published figure as the baseline for one configuration. The equipment list you confirm in writing is what should drive the electrical design, the pad dimensions and the delivery route.

Footprint, Access and Structural Support

A 3000 mm shell sounds compact until it has to reach its final position. Before confirming the size, agree on three site items:

  • The clear opening width and height of the delivery route, including gates, doorways and any lift or crane access for upper terraces and rooftop decks.
  • The load path. A filled shell plus occupants is a heavy concentrated load; on a timber deck or suspended slab this needs an engineered support frame, not packing timber fitted on site.
  • Drainage and overflow provisions around the unit, plus space for the equipment compartment to be opened for servicing without removing wall linings.

Where a project needs a different plan shape or footprint, that is a customisation conversation rather than a variant selection. Our customizable shape outdoor spa covers square, round, oval and curved configurations with an acrylic shell and structural reinforcement, which is the route to take when the architecture dictates the geometry.

Water Treatment and Hygiene Package

Ozone is shown as a feature of WS-PC01, but ozone is a sanitising aid rather than a complete maintenance programme. The questions worth pinning down are:

  • Whether UV sterilisation is added on top of the ozone package, and where the unit sits in the recirculation loop.
  • Whether filtration stays with the standard filter pump or moves to sand filtration for a project with heavier usage.
  • What dosing or maintenance access the owner will have, and whether the control panel exposes the cycles they need to adjust.

For a private villa the standard package may be entirely adequate. For a hotel, gym or clubhouse where turnover is high and duty of care sits with the operator, the upgraded filtration and sterilisation options are usually discussed as part of the specification, not as an afterthought once complaints start.

Heating, Insulation and Running Cost

Heat pumps and insulation appear in the optional accessories for this range, and they are the options that most affect what the owner pays every month. Frame the discussion around how the spa will actually be used:

  • Year-round daily use in a cooler climate points toward a heat pump sized for sustained operation, plus insulation to hold the temperature between sessions.
  • Seasonal or occasional use may make a smaller heating package and a good cover the more sensible spend.
  • Ask what the total power figure covers once your chosen heating and pump options are added, so the supply and protection on site match the delivered unit.

Getting this wrong is expensive to fix later: an undersized supply means the spa cannot run its systems together, while an oversized supply means electrical work that was never needed.

Jets, Seating Layout and Intended Use

The catalogue records 53 jets for WS-PC01. What matters to the end user is not only the count but where those jets sit relative to the seating and reclining positions. Two practical points to settle in writing:

  • Which zones are targeted — shoulders, lower back, legs — and whether jet types differ between them.
  • Whether steps, handrails and recessed seating are included, which matters for accessible use and for families with young children.

A useful comparison is the closely related WS-PC01A, which shares the 3000 mm length but has a narrower catalogue width, a different jet count and a lower total power figure. Placing two models side by side makes it obvious that equipment set and power travel together, and that choosing the option list is really choosing how the spa will be used.

Controls, Lighting and Finishes

One control system and one LED light are listed as standard. Reasonable customisation requests here include the control interface location, whether lighting colour or scenes matter to the surrounding landscape design, and how the shell and cabinet finishes coordinate with adjacent building finishes. These are small items individually, but they are exactly the details that look wrong in handover photographs when nobody agreed them.

How the Options Are Coordinated and Delivered

A swim spa rarely arrives alone on a project. It sits inside a package that may also include poolside and terrace furniture, wall and ceiling finishes, lighting and cabinetry. Working with a one-stop furniture and building materials supplier means the spa specification is coordinated with those adjacent trades from the design stage through production, freight and site coordination, rather than being procured as an isolated item that has to fit around decisions already made.

Our custom and OEM service covers bespoke material finishes and product specification alongside manufacturing, and the installation and after-sales support scope covers inspection and snagging once the unit is in place. For a buyer comparing quotations, that coordination is where the difference between a smooth handover and a long punch list usually shows up.

A Pre-Order Checklist

  • Confirm the equipment list line by line: pumps, jets, control system, lighting, ozone, and what is explicitly not included.
  • Ask for the total power figure that corresponds to your confirmed configuration, not the catalogue baseline.
  • Verify delivery access and the structural support design before the pad is poured.
  • Decide the water treatment package based on real usage intensity and who carries the maintenance duty.
  • Agree heating and insulation against the intended season and frequency of use.
  • Get the final configuration in writing as part of the order confirmation, including options that were discussed but declined.

Specify WS-PC01 with your site conditions in hand

Send us the room or terrace dimensions, intended usage and the finishes around the pool area, and we will confirm which configuration of the swim spa range fits, with the equipment list and power requirement stated for that exact build. Contact us through the enquiry page to start that conversation.