A swim spa shell arrives on site looking finished. What usually causes disputes is not the shell but the equipment list behind it. This guide lists the finish and specification details a buyer should put in writing before confirming an order for Outdoor Swim Spa WS-S08M, and how those details change pricing, freight and site preparation.

Start With the Catalog Specification, Not the Photograph

The published specification for this model records a shell of 8020 x 2260 x 1280 mm, one control system, two water pumps, one filter pump, a jet total of 58, one LED light plus 26 small LED lights, and a total power figure of 6.95 kW, with water jets, LED lighting and ozone shown as the listed features. Treat those numbers as the starting point of a conversation, not as an order confirmation. Two units carrying the same model code can leave the factory with different pumps, different jet counts and different control hardware if the buyer negotiates changes, and each change moves the power draw, the cabinet layout and the electrical work your site team has to allow for.

Ask the supplier to restate every line of that specification in the proforma invoice and the packing list, using the same wording. If a line is missing from the paperwork, assume it is not included until someone confirms otherwise in writing.

Specification lineWhat to confirm before payment
Shell dimensionsWhether the quoted size is the outer cabinet or the internal water envelope, and how much clearance the cabinet needs for access panels.
Pumps (water and filter)Quantity, brand or series if branded, output rating, and whether spares ship in the same container.
Jet totalTotal count and how jets are distributed between the swim lane and the hydrotherapy seating area.
LightingNumber of main fixtures and small LED lights, colour mode, and where the transformer is mounted.
Total powerThe figure quoted for your exact equipment list, plus supply phases, breaker rating and cable size expected at the connection point.
Water treatmentWhether ozone is fitted as standard on your build, and whether UV sterilisation is quoted as an option.

Cabinet, Insulation and Cladding Finishes

The cabinet does two jobs: it protects the plant and it reads as part of your terrace or pool deck. Confirm the cladding colour or finish against a physical sample rather than a screen image, and confirm which side of the cabinet carries removable access panels. A spa placed against a wall or inside a raised deck needs access to pumps, filter and controls on the side that will actually remain reachable after installation.

Insulation is usually quoted as an option rather than assumed. Ask what insulates the shell, the cabinet walls and the cover, and how it is fixed. This matters most for villas and resort villas in cooler highland or southern Australian locations where the unit runs early in the morning, and it directly affects running cost over a season.

Steps, Seating and Cover

  • Steps: confirm whether steps are included, their width and fixing method, and whether they are handed left or right for your layout.
  • Seating and jet layout: confirm the number of hydrotherapy seats and where the jets sit relative to them, so a buyer who wants neck and lower-back jets sees them on the drawing.
  • Cover: confirm the cover type, thickness, whether it is insulated, and how it is lifted and stored day to day.

Controls, Electrical Interface and Commissioning

One control system is listed for this configuration. Confirm the controller's mounting position, whether a second control point is wanted at the opposite end of the shell, and which functions are operated from it: jet speed groups, pump scheduling, water temperature setpoint, lighting mode and filtration cycles. If your project needs the spa on a building management system or on a schedule, raise that before production, because retrofitting an interface later costs more than specifying it.

Then settle the electrical handover in writing: supply phases, protected circuit rating, cable size and the distance from the isolator to the unit. The 6.95 kW figure published for this configuration is a starting point only; the number that your electrician works to must come from the confirmed equipment list of your own build.

Options That Change the Specification

The catalog lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options across this range. Availability and compatibility vary by model, so each option needs confirmation for the specific unit you are ordering rather than taken from a brochure page. A heat pump changes the plant space and the noise profile near neighbouring bedrooms. Sand filtration changes the plumbing run and the maintenance routine your facilities team follows. Neither is a cosmetic choice.

If your project needs a different length, depth or feature set, compare against neighbours in the same range before changing the specification of one model. Outdoor Swim Spa WS-S08B is listed at 7800 x 2200 x 1500 mm with a waterfall feature and a larger pump and jet set, while Outdoor Swim Spa WS-S07M is listed at 7000 x 2200 x 1480 mm with waterfall and water columns. Choosing the closer base model usually costs less than heavily modifying one shell.

How Finish Details Travel Through a Turnkey Order

A swim spa rarely arrives alone. In villa and hospitality projects it lands alongside outdoor furniture, paving, lighting and bathroom fixtures, and the same specification discipline applies across all of it. SANTERSON works as a furniture and building materials manufacturer and one-stop supplier, with project services that cover design coordination, custom and OEM production, logistics and door-to-door delivery and installation and after-sales support. Consolidating the spa with cabinetry, wall finishes and outdoor furniture on one purchase order means one set of drawings to check, one container plan and one point of contact for snags.

It also means one place to resolve the small conflicts that appear between a product page and an invoice. When you are already reviewing a specification sheet line by line for the spa, review the finish schedule for joinery, flooring and screens in the same pass.

Pre-Order Checklist

  • Every specification line restated on the proforma invoice and packing list.
  • Physical sample or code reference for cabinet cladding colour and finish.
  • Access panel positions marked on a dimensioned drawing against your site plan.
  • Jet count and seat layout confirmed on that same drawing.
  • Insulation, cover type and step handedness stated in writing.
  • Electrical requirement for your confirmed build: phases, circuit rating, cable size, isolator position.
  • Options such as UV sterilisation, heat pump and sand filtration confirmed as available for this model.
  • Spares list, warranty terms and who performs commissioning at handover.
Figures quoted here are transcribed from the published catalog entry for Outdoor Swim Spa WS-S08M. Options, included equipment and electrical requirements vary by configuration and must be confirmed for your specific order before production begins.

Send us the site plan and the specification sheet.

We will return a dimensioned drawing with access panels, jet layout and the confirmed equipment list, together with a quotation that matches it line for line. Contact SANTERSON to start the specification review.