A single toilet line rarely decides a bathroom budget on its own. What moves the number is everything wrapped around it: which rough-in your pipework actually allows, how many suites you need across guest floors and residential units, whether the glaze holds up after years of housekeeping, and who consolidates the shipment with the rest of the fit-out. This guide walks through exactly what to send us when you request a quotation for the Washdown One Piece Toilet 1051A, so the price you receive is the price you pay at production.
What You Are Quoting: Model 1051A in Plain Terms
The 1051A is a one-piece, washdown-flush WC made from vitreous ceramic with a dense glossy glaze. The tank and bowl are cast as a single unit, so there is no seam between them for dirt and bacteria to collect in - a practical point for housekeeping crews cleaning the same room hundreds of times over a project's life, and for owners who do not want a visible join line yellowing in a white bathroom.
The silhouette is soft and rounded rather than sharply angular, which makes it sit comfortably in contemporary bathrooms without fighting the basin, shower tray or vanity edges around it. The glaze is specified to resist limescale, staining and yellowing, which matters most in hard-water regions and in high-frequency use such as hotel guest rooms, serviced apartments and shared residential bathrooms.
Flushing is washdown: strong cleaning performance with economical water consumption. The model supports both P-trap (wall drain) and S-trap (floor drain) configurations, so the same specification can follow a project across different pipeline layouts - older buildings where the waste leaves through the floor, and newer or refurbished construction where it leaves through the wall.
The Six Things Your Enquiry Needs to Contain
Send these six items and we can quote in one pass instead of three rounds of email. Missing any of them means we have to come back to you, and each round costs days on a project schedule.
- Drain type and rough-in. State P-trap (wall drain) or S-trap (floor drain), plus the measured distance from finished wall face to the centre of the waste outlet. If your drawings and your site disagree, tell us - it happens constantly on refurbishments.
- Quantity by room type. Give separate counts for guest rooms, public and accessible restrooms, staff areas and residential units. Mixed quantities across room types are normal and we quote them as line items, not one blended figure.
- Project type and location. Hotel, resort, serviced apartment, villa or private residence, plus the delivery city or port. This drives packing specification, freight mode and documentation, not just unit price.
- Whether you want the matching 1051 suite. The 1051A shares its design language with Wall Hung Toilet 1051W, the 1051S freestanding pedestal basin and the 1051B wall-hung basin. Specifying a whole suite in one enquiry lets us align glaze tone and profile across every piece and consolidate the order.
- Any customisation you expect. Our Custom & OEM Service covers bespoke finishes, private labelling and engraving, and flexible minimum order quantities. Tell us at enquiry stage whether you need any of this - tooling and packaging changes are priced differently from a standard catalogue order.
- Your target delivery window and Incoterms preference. Even an approximate date lets us tell you immediately whether production and freight can meet it, rather than after the proforma invoice is issued.
How to Fill In the Specification Sheet
This is the table we work from internally. Send it completed and there is no ambiguity left in the quotation.
| Item | What to send us |
|---|---|
| Model | 1051A washdown one piece toilet, or 1051 suite combination (state which pieces) |
| Drain configuration | P-trap wall drain / S-trap floor drain, with measured rough-in distance |
| Quantity | Unit count split by room type and, if relevant, by building or phase |
| Cistern and seat | Confirm flush plate or cistern arrangement and seat preference; state if you are sourcing these locally instead |
| Spare parts | Spares holding for handover - flushing components, seats, cover plates |
| Packing | Standard export packing, or individual crate packing for high-value / mixed-container shipments |
| Destination | Delivery address or discharge port, plus who handles import clearance |
| Documents | Commercial invoice, packing list, certificate of origin or any import paperwork your customs broker requires |
How the Quotation Comes Back
Once the specification is clear, the enquiry follows our standard cooperation sequence: project brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up. Your quotation package normally covers unit price by line item, packing specification and container loading estimate, freight option (sea, air or rail) with an indicative route, and the documentation set for your import clearance.
Because we are a one-stop furniture and building materials supplier, the same enquiry can carry the rest of the bathroom and adjacent scopes: shower systems, vanities and kitchen cabinetry, wall panels and cladding, aluminium ceilings, flooring, lighting and carpets. Grouping them is where the real saving appears - one production schedule, one container plan, one point of contact for snags at handover, instead of six suppliers each chasing a different deadline.
The 1051 Suite, If You Want Visual Continuity
For projects where the bathroom reads as one designed set rather than a collection of parts, the 1051 range is specified together. The 1051W wall-hung WC leaves the floor clear for mopping and gives a floating look suited to boutique hotels and compact apartments; the 1051S freestanding pedestal basin fixes to the wall with a back panel; the 1051B wall-hung basin keeps the vanity zone visually light. Quoting them as one package means glaze tone, radius and profile are confirmed together before casting.
Questions Buyers Ask Before Committing
Can I mix P-trap and S-trap units in one order?
Yes. Both configurations are supported on the 1051A, and mixed orders across buildings or phases are routine. We quote each configuration as its own line so your quantities reconcile against your plumbing drawings.
What order quantity do you need?
It depends on whether you are taking a standard catalogue specification or a customised one, and on the packing specification. Our Custom & OEM service works with flexible minimum order quantities - send your count and we will tell you plainly which route it falls into.
Do you supply only ceramics, or the whole bathroom?
Both. Ceramics ship as a standalone order, and they also travel inside larger turnkey project packages covering fixtures, joinery, finishes and furniture for villa, hospitality and office work.
What happens after the goods arrive?
Our service scope includes on-site installation support, inspection and snag resolution, spare parts and replacement, and ongoing maintenance. Warranty terms, response commitments and local installer availability vary by country and are confirmed in writing for your specific project rather than assumed from marketing copy.
Send the Enquiry
Start a quotation for the Washdown One Piece Toilet 1051A. Send us your drain type and rough-in, quantities by room type, project location and target delivery window, and we will return a line-item quotation with packing, freight and documentation included.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Enquiries are answered within 24 hours during business days (Monday to Saturday, 8:00 AM to 6:00 PM GMT+8). Browse the full bathroom sanitary fixtures range for matching basins, bidets and wall-hung WCs.