A request for quote for open plan kitchen cabinetry only becomes comparable when every supplier is pricing the same thing. In an open-plan layout the kitchen is not a closed room but part of the living space, so the cabinetry behaves as an interior fixture: its lines, finishes and storage logic carry straight into the lounge or dining area behind it. Send a buyer package that fixes the scope, the drawings, the materials and the delivery terms, and the quotations you receive can be read side by side instead of being argued over.
1. Scope, quantities and unit of pricing
State what one quotation has to cover. A kitchen in a hotel suite, a serviced apartment and a private villa are specified differently, and mixed units produce prices that cannot be compared line by line.
- Project type and unit mix: number of suites, apartments or villas, and how many identical kitchens repeat.
- Pricing unit: price per running metre, per set or per complete kitchen, and what each unit includes.
- Cut-off between trades: who supplies the countertop, sink, tapware, appliances, splashback and site electrical work.
- Whether design, sampling, packing and freight sit inside the quoted number or are listed separately.
2. Drawings, dimensions and interface conditions
Open-plan cabinetry is measured against the room it opens into, so the supplier needs the same information a joiner would ask for on site. Attach what you have and say plainly what is still missing.
- Floor plans and elevations with overall room dimensions, ceiling height and finished floor levels.
- Setting-out drawings or sketches showing run lengths, returns, island dimensions and appliance positions.
- Interface notes: skirting, flooring thickness, wall build-up, window reveals, services and outlets.
- Whether on-site measuring is required, already complete, or expected from the supplier.
3. Cabinet box, door panel and surface finish
Name the materials rather than the look you want. Finish names such as high gloss, matte, acrylic, lacquer, melamine, wood veneer or aluminium frame describe real production routes, while a mood-board word does not. Our open plan kitchen cabinetry is customised on layout, dimensions, door style, colour and surface finish, which is exactly the set of variables an RFQ should lock down.
- Door style: flat panel, shaker, handleless, glass front, open shelving.
- Surface finish and colour reference, ideally a manufacturer code or a physical sample you can send.
- Panel and substrate preference where your project specifies one, plus any fire or moisture requirement for the local authority.
- Edge treatment and visible joinery detail, since open-plan runs are seen from the living side.
4. Hardware, interiors and appliances to be coordinated
Hardware is where quotations quietly diverge. List it explicitly so that every bidder prices the same moving parts. For custom built-in kitchen cabinets used in hotel and apartment projects, supporting hardware such as hinges, drawer slide rails, support legs and connecting brackets can be supplied with the cabinetry, and that option should appear in the RFQ so it is priced rather than assumed.
- Hinges, slides, handles or push-open mechanisms, and any soft-close requirement.
- Internal fit-outs: pull-out trays, corner solutions, pantry towers, waste bins, appliance housings.
- Integrated lighting inside cabinets or under wall units, including transformer and driver supply.
- Appliance schedule with model numbers and cut-out dimensions, or a clear statement that appliances are supplied by others.
5. Quantities, phasing and repeat units
Project buyers should give the production planner a realistic picture of volume and timing, because batching identical kitchens changes both cost and lead time.
- Total quantity plus the breakdown by kitchen type or unit type.
- Phasing: which rooms are needed first, sample or mock-up units before bulk production.
- Storage arrangements if the site cannot receive everything at once.
- Spare-parts and warranty-unit quantities for handover and future maintenance.
6. Delivery terms, installation and after-sales responsibilities
Cabinetry is only finished when it is installed and signed off, so the quotation should say who does what. Our open concept kitchen cabinets are supplied for apartment, hotel suite and residential open-kitchen projects, and the enquiry can extend from production through door-to-door delivery to installation support.
| Item to confirm in the RFQ | Why it changes the price |
|---|---|
| Incoterms and named destination | Determines who carries freight, insurance and import handling |
| Packing method and container loading plan | Affects damage risk and how many containers are needed |
| Customs documents to be provided | Commercial invoice, packing list and origin paperwork must be quoted as part of the service |
| Installation method on site | Pre-assembled units and knocked-down packs need different site labour |
| Snagging, spares and after-sales contact | Sets expectations for handover and warranty handling |
7. Sample and approval route before bulk production
Ask each bidder to describe the approval sequence in writing: which sample is produced first, who pays for it, how long approval takes and what happens if a finish is rejected after production has started. Confirming door samples, hardware function and dimension checks against site measurements before bulk orders protects both parties, and it belongs in the quotation terms rather than in later email threads.
8. Commercial terms worth fixing early
- Quotation validity period and how material or freight changes are handled.
- Payment stages tied to order, sample approval, production completion and shipment.
- Lead time stated as production days plus transit days, separately.
- Change-order pricing for drawing revisions after approval.
- What is excluded, written out rather than left implied.
A short checklist to attach
Drawings and dimensions; unit schedule and quantities; door and finish references; hardware schedule; appliance list; sample requirement; destination port or site address with Incoterms; required documents; programme dates; exclusions. Send the same pack to every bidder, and differences in price start to mean something.
Send your cabinetry enquiry
SANTERSON supplies custom kitchen cabinetry and interior fixtures for hotel, apartment and villa projects, with design coordination, custom/OEM production, door-to-door logistics and installation support. Email santerson@qq.com or contact PHILLIP on WhatsApp +86-13928214007, and include the checklist above for a comparable quotation.