An open concept kitchen succeeds or fails on two things at once: how many cabinet modules you order, and whether the cabinets, island, tall units, appliances and lighting arrive as one coordinated set. This guide walks project buyers through counting quantities accurately and coordinating the adjoining products, using open concept kitchen cabinets from our interior fixtures range as the working example.
Why an Open Concept Kitchen Demands More Planning, Not Less
When the kitchen has no wall separating it from the living and dining areas, every cabinet face becomes a visible surface. The run you specified for cooking now reads as room furniture. That single fact changes the buying brief in three practical ways.
- Cabinet doors, carcass edges and worktop edges must match each other and the adjoining joinery, because the eye travels across the whole space rather than stopping at a doorway.
- Storage has to be planned harder. A closed kitchen can hide overflow in a second pantry; an open one cannot, so tall units and niches have to be specified deliberately.
- Quantities are set once. Once the cabinetry is on site and installed, changing a module count means new panels from a different production batch, and finishes rarely match perfectly.
Our open plan kitchen cabinetry is made to order for exactly this situation: layout, dimensions, door style, colour and surface finish are set from your drawings before production starts, so the units that reach site already belong to one another.
Step 1: Count Quantities by Module Type, Not by Metres
Quoting a kitchen as "six metres of cabinets" is where quantity errors begin. A linear measurement hides the base units, wall units, tall units and open bays that actually have to be manufactured. Build your schedule module by module.
| Module type | What to count per unit | Open concept notes |
|---|---|---|
| Base cabinets | Width, drawer or door configuration, worktop span above | End panels are visible from the living area; specify finished ends rather than scribing to a wall |
| Wall cabinets | Height, depth, door style, whether the top is capped | Keep depths shallow where they face the room; full-height walls can feel heavy in an open plan |
| Tall cabinets | Appliance cavity size, ventilation gap, shelf layout | Our integrated appliance tall cabinets are sized to the appliance you select, so fix the appliance model first |
| Island and peninsular units | Unit count, seating overhang, service runs below | The island is furniture in the middle of the room; see our island bar units for configurable layouts |
| Open shelving and niches | Bay width, shelf count, load expectation | Open bays break up long runs; our open shelving minimalist cabinets carry the same finish as closed doors |
| Adjoining storage | Pantry, utility and dining wall units | Continue the door specification into utility tall cabinets and tall dining cabinets so the kitchen reads as one scheme |
For apartment blocks and hotel suite repeats, count once per unit type and then multiply. A repeated layout should be issued as one drawing set with a single module schedule, not redrawn for each floor or suite; that is where batch consistency comes from.
Step 2: Fix the Interfaces Before You Order
Quantity accuracy only matters if each module fits what it meets. In an open concept kitchen, four interfaces decide whether the installation goes smoothly:
Worktops and splashbacks
Worktop thickness sets the drawer front heights below it. Specify stone, sintered surface or laminate before the cabinet schedule is released, and record the overhang at the island edge where seating is provided.
Appliances
Ovens, column fridges and dishwashers must be chosen before their housings are cut. Appliance dimensions, ventilation requirements and electrical positions all sit inside the tall cabinet specification, so send us the appliance data sheet rather than a category description.
Lighting
Cabinet lighting needs power runs and a switch point decided during first fix. Our integrated cabinet lighting is specified with the cabinetry so that profiles, driver positions and cable routes appear on the same drawing.
Floors, ceilings and structural openings
Record finished floor levels and ceiling heights. A tall unit built to a nominal storey height will not fit once screed and flooring are laid, and in an open plan there is no wall return to mask the gap.
Step 3: Coordinate Finishes Across the Whole Visible Run
The most common open concept problem is a kitchen that looks assembled from three projects: cabinets in one lacquer, wardrobes across the same wall in another, and a media or storage wall in a third. Because these elements share sightlines, treat them as one finish schedule.
- One door specification, many uses. Take the kitchen door style and apply it to pantry walls, dining cabinetry and concealed storage so the transition between zones is quiet.
- Mix closed and open deliberately. A long closed run needs relief; open display niches within an integrated storage wall give depth without introducing a new material.
- Match surface sheen, not just colour. A matte door beside a high gloss panel in the same light reads as a mismatch even when the hue is close. Fix sheen in the schedule for every visible face.
- Order from one production run. Panels and adjoining joinery made together share the same batch, which is the only reliable way to keep veneer and lacquer tones consistent across a large open space.
Step 4: Sequence the Order Around Site Conditions
Cabinetry is a long-lead item in an open plan fit-out, so build the schedule backwards from the installation date:
- Issue layout drawings and module quantities for review; confirm dimensions against site.
- Confirm door style, colour, sheen and hardware against the finish schedule.
- Release production once appliances, worktops and lighting positions are fixed.
- Deliver in the order the site needs: tall units and wall units to set the envelope, then base units, then island modules.
- Inspect on delivery against the module schedule before the fitters start.
SANTERSON handles this as one scope from design consultation and space planning through manufacturing, quality control, project management and site coordination, with logistics arranged by sea, air or rail and door-to-door delivery. That single chain of custody is what keeps quantities, finishes and interfaces aligned instead of split across several suppliers.
Pre-order checklist
- Module schedule by type, with finished end panels marked
- Appliance data sheets for every integrated unit
- Worktop material, thickness and island overhang
- Lighting positions, drivers and switch points on drawing
- Finished floor and ceiling levels recorded
- Finish schedule covering kitchen plus adjoining visible joinery, including sheen
- Hardware list matched to panel thickness and door weight
- Delivery sequence agreed with the site programme
Frequently Asked Questions
Can we change quantities after production starts?
Custom modules are cut to the approved schedule, so changes after release become a separate batch. Revisions are possible before production release; after that, expect finish variation between batches.
Do open concept cabinets need different panels from a closed kitchen?
The panels are the same range. What changes is the detailing: more finished ends, capped tops where units are seen from above or behind, and consistent doors wherever they face the living area.
Should wardrobes and storage walls be ordered with the kitchen?
Wherever they share a sightline, yes. Ordering them together puts them in one production run and one finish batch.
Send us your layout drawings, module quantities and appliance list, and we will return a cabinet schedule matched to your open concept space, with adjoining joinery specified in the same finish.
Contact SANTERSON on WhatsApp +86-13928214007 or email santerson@qq.com to start a project quotation.