A living system that carries its own lighting is one of the few pieces of joinery where the furniture order and the electrical order have to be settled at the same time. Get that sequence wrong and you end up with a cabinet built to a fixed drawing, and a driver, a transformer or a switch position that no longer fits anywhere. The Santerson Modular System with Lighting (Living System) is a configurable piece from our Modular Living Systems collection, made to project dimensions with material and finish choices, and the specification conversation around it follows a predictable pattern. Below is what we actually need from a buyer, architect or contractor at quotation stage, in the order we normally work through it.
Before anything else: what this product listing does and does not fix
The published listing describes a configurable modular living system with lighting for residential projects, where finish, layout and dimensions are specified per space. It does not publish a standard size, a fixed module grid, a lamp wattage or a driver specification. Treat every number in this article as something to be confirmed on your own drawing, not as a catalogue value.
1. Layout and the open-to-closed ratio
Lighting follows function, so layout comes first. Tell us how much of the wall needs to disappear behind doors and how much should stay on show, because that single decision determines where light sources are needed at all. Closed storage is lit for use: a sensor inside a wardrobe or cabinet section turns on when the door opens. Open shelving and display niches are lit for effect, to make objects readable against the panel background.
Within the same collection you can also specify Santerson Closed Modular Units, Open Modular Units and a mixed open-and-closed configuration. If your drawing shows the same wall repeating across several villas or apartment types, say so early: we can repeat an approved module set instead of re-solving each room from scratch.
2. Dimensions, and the tolerances behind them
This is made-to-measure work, so we need more than a overall length and height. The items that change what we can build:
- Floor and ceiling levels across the run. On older buildings and renovated villas, walls are rarely plumb over four metres; a floor-to-ceiling unit needs either a scribe allowance or a site survey.
- Whether the system butts into a window reveal, a door lining, a skirting line or another piece of joinery.
- Depth per zone. Shelving depth, cabinet carcass depth and the projection of any lit display niche are different numbers, and they set what light fitting physically fits in the rebate.
- Aperture sizes for anything you intend to plug in: a television, a soundbar, a refrigerator or a coffee machine each needs its opening, its ventilation gap and its socket position fixed before panels are cut.
If the run is intended to read as one continuous piece across a long wall, tell us. Long spans affect how the carcasses join, where vertical joints appear, and whether a lighting circuit has to be split into sections so that one driver does not carry the entire elevation.
3. Lighting: what to specify, line by line
This is where most buyer enquiries are incomplete. Rather than asking for "LED lighting", send us the following as a schedule. You can copy the table into your own RFQ.
| Item to confirm | Why it matters at production stage |
|---|---|
| Position of every light source | Under-shelf, inside a niche, vertical channel, toe kick or behind a reveal. Each position needs a machined rebate or a mounting profile, so it has to be on the panel drawing. |
| Light output and colour temperature | A display niche and a work surface need different output. Colour temperature should match the rest of the room's lighting scheme, otherwise joinery light reads as a separate, colder layer at night. |
| Colour rendering expectation | If the unit displays art, textiles or merchandise, say what is going in it. That informs the fitting choice rather than a default strip. |
| Diffuser and whether the source is visible | Recessed, surface-mounted or concealed behind a shadow gap. Concealed lighting changes the profile we machine into the shelf edge. |
| Switching and control | Door-activated sensor, wall switch, touch, remote or integration with the room's lighting control. Sensor type affects cable routing and where an access panel is required. |
| Driver and transformer location | Where the driver sits, and how it stays reachable for replacement. A driver buried behind a fixed panel becomes a maintenance problem on day one. |
| Voltage and supply standard | Mains or low voltage, and the destination country's supply. Confirm this against your local electrical code with your own electrician; we build to the specification you confirm. |
| Dimming method | If the circuit is dimmed, the driver, control gear and switch have to be compatible as a set. |
| Replacement terms | Whether strips and drivers are supplied as serviceable items with spares, or as sealed assemblies. Ask before sign-off, not after handover. |
For related lit joinery in the same project, the same schedule applies to Santerson Integrated Lighting Systems in the modular shelving range and to Santerson Integrated Cabinet Lighting. Keeping one lighting schedule across all three avoids three different fitting types on one site.
4. Materials, finishes and how they behave under light
Finish selection and lighting are not independent decisions. A high-gloss lacquer next to a concealed strip will show every grazing line and every fingerprint; a matte melamine or a wood-grain surface hides them. Send us the finish sample and the lighting position together, and we will tell you which combinations need a deeper rebate or a different diffuser.
- Panel substrate and board specification for each zone, including anything in a humid room.
- Surface finish: matte, gloss, lacquer, veneer, melamine or acrylic, with the sample reference rather than a colour name.
- Edge treatment and whether edges are visible in the lit zones.
- Hardware: hinges, slides, handles or handleless profiles, and any brand you already specify on other packages.
- Fire, moisture or wear requirements where your project team has set them. We work to the specification you provide; certification evidence for a given market should be verified with your own consultant.
Our custom and OEM service covers bespoke finishes, textures and branding, plus prototyping before the production run. For multi-unit projects, a signed-off sample of one lit module is worth the time it takes: it settles the light output, the finish and the joint detail in one object.
5. Interface with the building services
A lit living system sits between three trades, and the handover points need naming on the drawing:
- The electrician's first fix: where the cable comes out of the wall or floor, and at what height behind which module.
- The plasterboard or render line: whether the unit is set into a rebate or butts a finished face, and who forms that rebate.
- Flooring: if floor-to-ceiling modular systems run over a finished floor, the height dimension changes with the floor build-up.
- Site access: lift dimensions, stair widths and whether the system arrives as full-height modules or in sections to be assembled in the room.
Send us the coordinated drawing rather than an isolated furniture detail. Most rework on lit joinery comes from a furniture drawing and an electrical drawing that were never reconciled.
6. Documentation, delivery and installation
For procurement files we can supply shop drawings for approval, material and finish schedules, packing lists and assembly drawings. Ask at quotation stage if your client requires a specific drawing standard or a naming convention; retrofitting a documentation format after production has started costs time.
Delivery is arranged through our logistics and door-to-door delivery service, with installation and after-sales support offered as a separate service. Lit joinery should be checked on site in two stages: carcass alignment before the lighting is connected, then light output and switching once power is live. Snag list both. As part of our one-stop supply, this system can also be coordinated with the rest of the fit-out package rather than ordered as an isolated item.
A short specification checklist to send with your enquiry
- Room type, quantity of units, and whether the same design repeats across units.
- Coordinated drawing with levels, floor build-up and existing services marked.
- Layout intent: closed, open or mixed, and what you intend to display in the open zones.
- Lighting schedule: position, output, colour temperature, diffuser, control, driver location, voltage.
- Finish samples by reference code, not colour name.
- Apertures for appliances or media, with ventilation gaps.
- Destination, delivery address and access constraints.
- Target programme: drawing approval date, production window, required site delivery date.
Send those eight items and the first quotation round is usually the last one. For everything else, our interior design services team can work from a floor plan and produce the layout and rendering before you commit to joinery dimensions.
Questions buyers ask us most often
Can the lighting be added later, after the unit is installed? Surface fittings can be added to a unit that was built without any provision, but they sit visibly and are lit unevenly. If you may want lighting later, tell us now so the rebate and cable route are machined even if the fitting is supplied at a second stage.
Can I supply my own light fittings? Yes, provided we receive their dimensions, mounting method and control gear before the panel drawings are issued. The rebate has to be cut around the actual fitting.
Do you provide the electrical work on site? No. We build and connect to the specification your electrician prepares at first fix; connection to the building supply stays with your local contractor, who is responsible for code compliance in your jurisdiction.
What if my wall is not straight? A site survey solves it. Where a survey is not possible before order, we design scribe and trim allowances into the end modules and set them on site.
Related products in the same collection
- Santerson Floating Modular Systems — wall-mounted configurations where the lighting feed has to be concealed inside the wall build-up.
- Built-in furniture range — for specifying the rest of the joinery package to the same finish schedule.
Send your drawing, lighting schedule and finish references and we will return a quotation against them.