A swim spa on a villa or resort project rarely fails because of the shell. It fails at the edges: a missing step, an undefined electrical supply, a heat pump ordered after the pool has already shipped, or a set of outdoor furniture delivered to a different opening date. This guide uses Outdoor Swim Spa WS-PC07ST, a 7 m configurable swim and hydrotherapy unit, to show how buyers, contractors and interior teams set the right number of units, build a quantity list and coordinate the surrounding products before an order is placed.
1. Decide how many units the project actually needs
Quantity starts with use, not with budget. On a single villa, one shell is normally enough and the question becomes which variant of that shell suits the terrace. On a resort, club or residential development, count the users each unit has to serve at peak: villas sold with their own spa take a one-to-one count, while shared facilities may need an extra unit if simultaneous use matters to the operator.
Then check three constraints before fixing the number:
- Space per unit, including circulation around the shell and plant access, not just the footprint.
- Power per unit — 6.55 kW is listed for this model, so multiply by the unit count and compare it with what the site supply can carry.
- Access per delivery — a shell of roughly 7 m needs a clear route from the gate; more units means more movements along that route.
For multi-unit work, decide the model mix early. Six identical shells are easier to price, ship and maintain than six variants that share nothing but a brochure page.
2. Read the specification sheet line by line, then split it into three columns
The catalogue entry for WS-PC07ST records a shell of 7000 × 2400 × 1470 mm, one control system, one swim training system, one filter pump, six water jets in total, four LED lights and a listed total power of 6.55 kW. The same sheet also lists the features shown for the model: water jets, LED lighting, ozone and a swim training system.
Before any quantity discussion, move every line into three columns on your own sheet:
- Included — what the specification already counts as part of this model (control system, swim training system, filter pump, jets, LED lights).
- Optional — what the catalogue offers but does not include by default: control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model.
- To be confirmed on site — electrical supply and protection, foundation or plinth details, access route for delivery, drainage, and local permit requirements. These are never settled by a product page alone.
That split is the difference between an enquiry that produces a firm quotation and one that turns into several rounds of email. One line on this model's sheet needs attention: the specifications do not list a water pump, while the optional accessories do include water pumps. Treat it as an open item to confirm with the factory rather than something either side assumes.
3. Decide the configuration before you finalise the quantity list
The PC07ST family covers more than one shell, and the differences change what you order:
| Model | Catalogue dimensions | Feature points shown |
|---|---|---|
| WS-PC07ST | 7000 × 2400 × 1470 mm | Water jets, LED lighting, ozone, swim training system |
| WS-PC07ST-L | 7490 × 2400 × 1470 mm | Same feature set, longer shell |
| WS-PC07ST-S | 7000 × 2400 × 1470 mm | Adds an automatic cover option to the feature list |
Two practical consequences follow. First, the longer -L shell changes deck layout, circulation space and the delivery route, so confirm it against drawings rather than against a brochure image. Second, where an automatic cover appears as a feature on one variant, ask whether that cover is supplied with the unit or priced separately for your configuration; do not carry it into the quantity list as included until the quotation says so.
For a development running several units, fix the model mix at this stage rather than at quotation stage, because each variant brings its own deck layout and spare-parts list.
4. Build the quantity list in four groups
Write the list as four blocks. Each block has its own owner on site and its own lead time, which is why they should not be mixed into one line on a purchase order.
Group A — the unit itself
- Shell and configuration: model code, dimensions, colour or finish if a finish option is selected.
- Included equipment per unit: control system, swim training system, filter pump, jets, LED lights — with the quantity per unit copied straight from the specification sheet, so that a spare-parts list later matches what was delivered.
- Total power figure for electrical planning (6.55 kW listed for this model), plus the supply voltage and circuit arrangement your site can actually provide.
Group B — options that change the machine
- Heat pump and insulation, if year-round water temperature matters at the site. These are catalogue options; confirm which pairing applies to your shell.
- Water pump, sand filtration and UV sterilization where the project brief calls for them.
- Steps and access items, sized to the deck height rather than to a generic accessory photo.
Group C — the surrounding hard landscape and services
- Foundation or plinth, drainage, plant-room or equipment-access space, and the electrical run with its protection device.
- Finishes around the spa — wall panels and cladding, engineered wood flooring for adjacent covered areas, and perimeter lighting.
- Any pergola, cabana daybed or shade structure that sits over the spa, because those items set their own structural and anchoring requirements.
Group D — outdoor furniture and ancillaries
- Lounge chairs, side tables, umbrellas and storage for towels and chemicals, matched to the same weather exposure as the spa.
- Spare consumables and filters in the quantity that matches your unit count, so maintenance does not stall after handover.
5. Coordinate the swim spa with the rest of the outdoor package
A spa ordered on its own usually arrives before or after everything around it. Grouping it with the wider outdoor furniture scope — loungers, dining sets, swings, pergolas and daybeds for the same terrace — lets one production window, one container plan and one installation visit cover the whole area. For villas and hospitality sites working to a single handover date, that is where the practical saving sits: fewer shipping legs, one set of customs paperwork, and one installation crew on site instead of three.
Coordinate on three dates, not one:
- Site-ready date — when the plinth, drainage and power are complete. The spa cannot land before this.
- Delivery window — matched to lift or crane access and to the route from the gate to the terrace; a 7000 mm shell needs a clear path.
- Commissioning date — after finishes around the spa are complete, so that dust and paint work do not fall into the water.
6. What to send with the enquiry
The fastest quotations share the same attachments. Send:
- A plan showing the spa position, deck levels and access route.
- The model code — WS-PC07ST, WS-PC07ST-L or WS-PC07ST-S — written exactly as catalogued, plus unit count.
- Your list of selected options from Group B and anything you want quoted as excluded.
- The available electrical supply at the panel, including voltage and phase.
- Delivery address, port of entry and the Incoterms you intend to work to.
Ask for the quotation in the same four-group structure as your quantity list. When the reply comes back in blocks A to D, comparison between suppliers becomes a matter of scope rather than guesswork, and items that fall between trades become visible while there is still time to move them.
7. Common coordination mistakes on swim spa projects
- Ordering the shell before the options are fixed. Heat pumps, insulation and filtration affect both price and the electrical design; adding them after production starts normally means a change order.
- Treating the listed power figure as the whole electrical design. A total power number tells you the load; it does not tell your electrician the supply, protection or cable route your site needs.
- Assuming an accessory is included because it appears in a photo. Steps, covers and filtration options are catalogue options unless the quotation names them for your configuration.
- Letting the furniture package run on a separate timeline. The terrace is only finished when the last item is installed, and every extra shipping leg adds its own risk of delay.
- No spare-parts line. Filters, jet components and lighting need a defined quantity at order stage if maintenance is to continue after handover.
8. How a single supplier changes the paperwork
SANTERSON works as a one-stop furniture and building materials supplier for villa, hospitality and office projects, covering design coordination, custom and OEM production, freight and door-to-door delivery, and installation with after-sales support. In practice this means a swim spa, the loungers beside it, the wall cladding behind it and the cabinetry in the changing room can sit on one production schedule and one set of shipping documents. For buyers handling Australian sites, that single point of contact also reduces the number of suppliers chasing each other over who is responsible for a gap between trades.
It does not remove the need for local checks. Confirm import terms, duties, site permits and the qualifications of whoever connects power and water at the address; those sit with the project team on the ground.
Checklist before you place the order
- Model code and dimensions confirmed against drawings, not against a catalogue image.
- Every option in Group B priced or explicitly excluded in writing.
- Electrical supply at site stated, and compared with the listed power figure for the chosen shell.
- Site-ready, delivery and commissioning dates agreed with the contractor.
- Outdoor furniture, finishes and lighting scheduled in the same shipping plan.
- Spare parts and consumables listed with quantities per unit.
Send your model code, unit count and selected options to the SANTERSON project team, and we will return a quotation structured in the same four groups as your quantity list — unit, options, surrounding works and outdoor furniture — so the whole terrace can be produced, shipped and installed on one schedule. Browse the wider range in Swimming Pools and Swim Spas.