A swim spa quote rarely arrives in a form that lets you compare two suppliers side by side. One quotation lists a model number and a price; another lists the same model with a different pump count, a heat pump buried in the options column, and a delivery term that stops at the port. Before you sign anything for an Outdoor Swim Spa WS-S04B, work through the checklist below. Every line item is something a purchaser can ask a supplier to confirm in writing, and each one changes either the delivered price or the running cost.

Start With the Model Designation, Not the Picture

Outdoor swim spas are sold as families of shells. In our own catalogue, the WS-S04 sits alongside the WS-S04B and the WS-S04X, and those three units do not share the same shell size or equipment set. The WS-S04 is catalogued at 4090 × 2200 × 1110 mm with a total power figure of 8.25 kW; the WS-S04B is catalogued at 3900 × 2200 × 1450 mm with a total power figure of 10.35 kW. A quotation that names "WS-S04" when the drawing shows a deeper shell will look cheaper and arrive as a different product.

Ask for the exact model code on the quotation header, on the packing list and on the nameplate drawing. Then check that the three documents agree.

Read the Dimension Set Against Your Slab

Catalogue dimensions describe the shell, not the installation. Confirm which number is internal water depth, which is overall height including the base, and whether the stated footprint already includes steps, plant compartment or handrail fixings.

  • Footprint clearance: ask what space is required around the shell for the filter pump, control system and access for servicing — not just the shell outline.
  • Depth and seating: a deeper shell changes seat heights, bench positions and the depth at which children or older users sit. Request a section drawing with water level marked.
  • Structural support: send the supplier your slab or deck arrangement and ask for confirmation in writing that the quoted configuration is compatible with it, including point loads at the plant end.
  • Access route: confirm the shipping package size against gates, lifts and site access. A shell that cannot reach the position cannot be installed, whatever the quotation says.

Count the Equipment Line by Line

Two quotations for the same model can differ substantially once you count hardware. For the WS-S04B, the catalogue records one control system, three water pumps, one filter pump, a jet total of 31 with six water columns, two LED lights plus 28 small LED lights, and features shown as water jets, LED lighting and ozone. Treat those figures as the reference point for your own enquiry, and ask the supplier to restate each quantity on the quotation rather than writing "as per standard specification".

Line itemWhat the quote should stateWhy it matters commercially
Water pumpsQuantity and output per pumpDrives jet performance and connected load
Filter pumpQuantity, run rate or timer arrangementDrives water clarity and daily energy use
JetsTotal count and how many are water columnsJet layout, not just count, sets the hydrotherapy feel
LightingMain units plus small LED countAffects ambience, control zones and spares
Water treatmentOzone, UV sterilisation or neitherChanges chemical load and ongoing consumables
Total powerConnected load for the quoted configurationSets the electrical supply your site must provide

The catalogue entry for this model also records the swim training system as not listed. If your project brief assumes a counter-current swim unit, get it written into the quotation as an item with its own price, or remove it from the specification before you compare bids.

Separate Standard Equipment From Options

Optional accessories in this product family include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each one is a price fork, and suppliers place them differently: some fold a heat pump into the headline price, others quote it as an add-on that only appears when you ask. Ask for two columns — included, and optional with prices — and request the same breakdown from every bidder so your comparison is honest.

Two of these options deserve particular attention in a project budget. A heat pump changes both capital cost and the electrical design, and it is the item most often missing from a "like for like" comparison. Insulation changes running cost more than capital cost, which matters when the spa sits outdoors and runs through a cool season.

Confirm the Electrical Interface Before Order

The WS-S04B catalogue records total power at 10.35 kW for the configuration shown on the site. That figure is a reference, not an installation instruction: supply voltage, phase, circuit protection, cable sizing and earthing all depend on local conditions and on which options you select.

  • Ask the supplier to state the supply requirement for the exact quoted configuration, in writing.
  • Share your electrical arrangement early — single or three phase, available supply capacity, distance from the distribution board.
  • Agree who supplies and installs the final circuit, isolator and protective device: the spa supplier, the main contractor, or the site electrician.
  • Ask whether a heat pump or additional pumps change the connected load, and get the revised figure before the electrical package is fixed.

Check What the Price Actually Covers

For an imported unit the quotation term decides how much risk you carry. A factory or port price leaves freight, insurance, customs clearance, duties and inland delivery to you; a door-to-door arrangement covers them on the supplier's side. Our own logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to site — but the quotation you receive should still name the term, the destination, and what is excluded.

  • Delivery term and destination: named place, not just "delivery".
  • Packaging: how the shell, pumps and panels are packed, and how many packages.
  • Documentation: commercial invoice, packing list and certificates of origin for your customs agent.
  • Unloading: who provides the crane or forklift on site, and when.
  • Lead time: from order confirmation, and separately from payment, with what starts the clock.

Test Site Support and Spare Parts

A swim spa is a mechanical plant item with a long service life ahead of it. Our installation and after-sales support page describes on-site installation, inspection and snagging, warranty coverage, spare parts and replacement, and ongoing maintenance. Ask your supplier the same questions in concrete terms: which items are covered, for how long, who attends site, and what the response arrangement is when a pump or control board fails.

Then ask specifically about consumables and wear parts — pumps, seals, jet bodies, LED modules, filters and control boards. A quotation that names replaceable parts by code costs you less two years later than one that says "spares available on request".

Ask the Supplier to Quote Against Your Brief

The most useful quotations come from suppliers who work from a project brief rather than a catalogue page. If the spa is part of a wider villa or hospitality package, coordinating it with turnkey project delivery means one party handles the specification, the production schedule and the site handover instead of three.

Send every bidder the same four documents: the model code you want, your site drawing with access route marked, your electrical arrangement, and a list of required options. Then read back each quotation against the six checks above — model designation, dimensions against the slab, equipment quantities, options split, electrical interface, and what the price covers.

Figures quoted here are catalogue values for the configuration shown on the product page: 3900 × 2200 × 1450 mm, three water pumps, one filter pump, 31 jets with six water columns, two LED lights plus 28 small LED lights, and total power of 10.35 kW. Included equipment and electrical requirements vary with the selected configuration, so confirm them for your own quotation before ordering.

Send us the model code, your site drawing and the options you need, and we will quote the WS-S04B with equipment quantities, delivery term and supply requirement stated line by line. Browse the full swimming pools and swim spas range first, or contact PHILLIP on +86-13928214007 (WhatsApp) or santerson@qq.com.