A wall panel order goes wrong long before the boards reach site. It goes wrong at the moment the enquiry is sent with a photo attached and no numbers behind it. If you are specifying decorative panels for a home or a small hospitality fit-out, the document you send your supplier matters more than the sample you approve. Here is how to build a specification that comes back with an accurate quotation and arrives on site as expected.

Start With the Surface, Not the Product Name

The phrase "decorative wall panel" covers several genuinely different products. On our catalogue it covers a rigid Decorative Wall Panel for Interior Home Decoration, a Luxury Decorative 3D Wall Panel with a relief surface, and a bendable mineral sheet such as the Flexible Wood Grain Cement Wall Panel. These are not interchangeable. The rigid panel is cut and fixed like a board; the flexible one is rolled out and bent onto curves, arches and cylinders. A specification that names only the finish will get you the wrong fixing method and the wrong substructure.

Write down what the wall actually has to do before you choose anything: flat or curved, interior or exterior, dry room or a humid one, a feature wall behind a bed or full-height cladding in a lobby. That short list decides the material family far more than the colour does.

The Eight Fields Every Panel Specification Needs

Whatever the product, put these fields in writing and send them as one document. Where you do not yet have an answer, write "to be confirmed" rather than leaving it blank; a blank field invites the supplier to guess.

FieldWhat to record
Location and useRoom, wall orientation, interior or exterior, residential or commercial traffic level.
SubstrateConcrete, brick, plasterboard, existing tile or existing paint. The fixing method follows from this.
Panel typeRigid board, 3D relief panel, flexible sheet, or a configured Wall Panel System made to your dimensions.
DimensionsThe panel size you want, plus the measured area of each wall in square metres, with an allowance for cuts and wastage.
Surface and colourFinish name, wood or stone effect, sheen level, and whether a physical sample is required before production.
Edge and joint detailMitres, trims, movement allowance, and how corners and outlets are handled.
Quantity and batchesTotal area split by wall, plus spares. State whether the whole order must ship in one batch.
Delivery termsDestination address, packaging preference, and the date the material has to be on site.

Match the Panel Type to the Geometry

Curvature is the fastest way to rule products in or out. Rigid panels cannot wrap a radius. If your design has a curved wall, a column or an arched niche, you need a flexible product. The MCM Flexible Rammed Earth Panel is a thin modified-clay sheet that bends onto curved surfaces and is fixed with tile adhesive to a cement base or plasterboard, cut on site with simple hand tools. The wood-grain cement sheet is handled the same way and reaches site with a white raw surface you can paint after installation.

On flat walls, rigid panels are usually simpler to detail and quicker to fix. Our interior decorative panels are described as lightweight and easy to cut on site, moisture resistant for humid indoor environments, with a stain-resistant surface that wipes clean. That is the practical argument for panels over paint or wallpaper in a hallway, a bedroom feature wall or a restaurant.

Turn Performance Adjectives Into Questions

Supplier pages use words such as fireproof, eco-friendly and moisture resistant. Those words are not specifications. If fire behaviour, water resistance or impact resistance matters to your project, and in a commercial lobby it usually does, ask the supplier what each claim is based on, then confirm it against the requirements in your own project documentation before the panel is approved. We would rather answer that question at quotation stage than discuss it after installation.

Rule of thumb: every adjective in a product description becomes a line in your specification with a question mark beside it, until the supplier has answered it in writing.

Get the Quantity Right on Paper

Measure each wall separately instead of adding up one total. Note the height and width of every run, deduct openings, then add a cutting allowance that suits the pattern; a straight-run board wastes less than a 3D relief panel trimmed around outlets and corners. Splitting quantities by wall also lets the factory pack by room, which makes the installation sequence obvious when the crates are opened.

Order spares in the same batch as the main delivery. Panels from a later production run can differ subtly in tone and texture, so a single replacement sheet ordered months later often turns out to be a visible mismatch.

Confirm Customisation Before Production Starts

Size, colour and surface pattern are customisable across our interior panel range, including the Modern Decorative Wall Panel for Interior Decoration, whose surfaces reproduce stone, wood and fabric effects. Custom work needs a drawing or a marked-up layout signed off before production begins, not an email describing the idea in prose. Where the panel has to line up with lighting, a mirror or a joinery reveal, that interface detail belongs on the drawing as well.

What a good specification lets the supplier answer

  • The correct product family for your wall geometry and room conditions
  • A unit price against stated dimensions, finish and quantity per wall
  • Packaging, total package count and packed volume for freight
  • Which performance claims are documented, and which need approval on your side

Sending the Specification to a Manufacturer

SANTERSON has been producing furniture and building materials in China since 2008, supplying project orders across residential, villa and hospitality work. Send the specification above through our Custom & OEM Service and the quotation comes back against those same fields, with anything unclear put to you rather than assumed. Freight is arranged door to door by sea, air or rail, with export paperwork handled at our end.

Send us your wall list: rooms, dimensions, substrate and finish. We will quote the panel type that suits each surface. Enquiries reach us through the contact page, Monday to Saturday.