An open-plan kitchen is rarely bought off the shelf. The cabinetry has to carry the visual language of the living room while still taking daily cooking wear, and it usually arrives as part of a larger package of interior fixtures. That is exactly why a request for quotation needs more than a floor plan and a colour preference. Below is the practical checklist we use when preparing a custom quote for open concept kitchen cabinets, so the price you receive is the price you pay, and the drawings match what leaves the factory.
What makes open-plan cabinetry a different quotation
In a closed kitchen the cabinets can be treated as equipment: work triangle first, appearance second. In an open layout the same run of doors, panels and shelves becomes part of the living space, seen from the sofa and from the entrance. Two consequences follow for procurement.
First, finish decisions are shared decisions. The cabinet surface has to sit comfortably next to the flooring, wall panelling, island worktop and any open shelving that continues the line. Second, storage strategy becomes visible storage. Open niches and glass-front sections display what they hold, so the internal layout, shelf spacing and hardware quality all show up in the finished room. A quotation that only lists linear metres of cabinets will not resolve either point; it has to describe the actual specification.
Before you write: the drawings you need ready
A manufacturer cannot price an open kitchen responsibly from a single photograph. Send what you already have, and say clearly what is missing:
- A dimensioned plan of the kitchen zone plus the adjoining living and dining areas, with overall room dimensions and ceiling height.
- Positions of existing or planned plumbing, drainage, flues, power outlets and lighting points, marked with heights from the finished floor.
- Appliance schedule — built-in oven, hob type and extraction method, dishwasher, refrigerator, wine cabinet — with model references or cut-out dimensions where available.
- Worktop and splashback material preference, thickness and edge detail, or a note that you want the supplier to propose options.
- Reference images for the look you are after, ideally from the supplier's own catalogue so the specification is unambiguous.
If your project does not yet have these drawings, say so in the enquiry. Interior design services cover space layout planning, concept design and 3D renderings, which is often the faster route for villa and apartment projects still at the concept stage.
The specification details a quote must contain
Ask for these items in writing. If any of them are missing from the offer you receive, request them before comparing prices between suppliers — offers that look different in price often differ here.
| Item to specify | Why it changes the price |
|---|---|
| Cabinet layout and run lengths, including island or peninsula dimensions | Determines panel area, number of carcasses and the amount of cut-to-size work. |
| Door style and profile — flat slab, handleless, shaker, framed | Machining and finishing time differ noticeably between profiles. |
| Panel material and surface finish, with a sample reference | Acrylic, lacquer, melamine, veneer and PVC behave differently in cost and in maintenance. |
| Open sections: shelf spans, niche sizes, glass or solid shelving | Long unsupported spans need reinforcement or thicker panels. |
| Hardware schedule — hinges, drawer runs, lift systems, legs, brackets | Branded soft-close sets and tall drawer units are a large share of the total. |
| Integrated lighting for open shelving and internal cabinets | Cabling routes, transformers and switch points must be planned before panels are cut. |
| Worktop supply: included or supplied by others | Cut-outs for sinks and hobs need coordination between the two trades. |
| Packaging, container loading plan and delivery terms | Panel protection and load planning affect both freight volume and damage risk. |
Custom or standard: how to decide honestly
Standard modules work well when the room is square, the ceiling is at a common height and no services are in awkward places. Custom fabrication earns its cost when the kitchen sits inside an older building with out-of-square walls, when a full-height run has to meet a soffit, or when the cabinetry continues into the living room as a matching media or storage wall. For whole-apartment and hotel work, custom layouts also let one finish language carry through several unit types, which keeps the sales gallery and the show suites consistent.
The open plan kitchen cabinetry line is built on that custom basis: layout, dimensions, door styles, materials and surface finishes are set per project, with matching hinges, drawer runs, legs and brackets available on request. Where the same fit-out extends to wardrobes, vanities and tall storage, ordering them against one specification reduces the number of samples you need to approve.
Quantities, unit mix and the order that makes sense
For a single home, one kitchen set is straightforward. For an apartment block or a hotel floor, state the unit types and how many of each — Type A kitchen, Type B kitchen, show suite with upgraded finish — and ask for a price per type rather than one blended figure. Repeat units are where fabrication consistency matters most: identical cut lists, identical hardware sets, identical colour lots. Also confirm which items ship together and whether the first batch can cover a mock-up flat before full production begins.
Minimum order quantities vary by product family and finish. Ask for them early rather than after the design has been fixed on a finish that cannot be ordered in your volume.
Sample approval: what to check, not just look at
- Colour and sheen under both daylight and the site's artificial lighting; request physical samples, not printed images.
- Edge banding and joint quality on a door corner, since open-plan cabinetry is viewed from a short distance.
- A drawer or door sample with the actual hardware fitted, operated several times.
- Surface resistance to a wet cloth and to a common cleaning agent, on the sample you keep.
Keep the approved sample signed and dated. It is the reference both sides use at handover if a colour question arises later.
Delivery terms, site access and installation sequence
Open-plan kitchens usually arrive late in a project, after flooring, ceilings and painting. That creates two practical risks: panels damaged on site by other trades, and openings that no longer match the drawings because floor build-up changed the finished level. Cover both in the enquiry — confirm the delivery address, lift or stair dimensions, storage available on site, and whether installation support is included. Freight arrangements cover sea, air and rail forwarding with customs paperwork and door-to-door delivery; who handles import clearance at destination should be stated in the offer, not assumed.
Sending your enquiry
A complete enquiry shortens the loop: one round of drawings, one sample set, then production. A thin enquiry produces a low-looking number that later grows through variations — and on an open-plan kitchen, those variations are visible from the sofa.