A swim spa in the eight-metre class is a big commitment for a villa garden, a resort terrace or a private wellness area. Before an order for Outdoor Swim Spa WS-PC08ST-L goes into production, the specification sheet you agree with the factory matters more than the model code itself. Below is a practical list of the customisation decisions buyers should raise during the enquiry stage, so that the quotation, the shipping documents and the finished unit all describe the same product.

Start From the Base Configuration

WS-PC08ST-L sits in our configurable outdoor swim and hydrotherapy range. The catalogue entry shows a footprint of 8490 × 2400 × 1470 mm, one control system, one swim training system, one filter pump, six water jets, four LED lights and a total power figure of 6.55 kW. Treat those numbers as the starting point rather than the final answer: what is included, what is optional and what has to be arranged on site are exactly the questions this article is about.

Two points deserve emphasis before you compare quotations. First, the catalogue does not list a water pump for this model, so whether one is supplied depends entirely on the configuration you confirm. Second, the total power figure changes as soon as heating or additional pumps enter the specification, which means your electrical supply has to be planned after the option list is fixed, not before.

The Options You Should Discuss One by One

Our catalogue lists a set of options for this range. Availability and compatibility vary by model, so each item should be confirmed against the specific unit you are ordering.

OptionWhat to settle with the supplier
Heat pumpWhether year-round water temperature control is required, and how the added load changes total power and the supply you must provide on site.
InsulationShell and lid insulation for cooler nights or for a spa that runs only at set times. Insulation affects running cost more than most buyers expect.
Water pumpNot listed in the catalogue for this model. Confirm whether a pump is included, its duty, and how it connects to the swim training system and filtration circuit.
Filter pumpOne filter pump is shown as standard. Ask about run hours, cycle time and where the pump and its controls sit relative to the plant space.
Sand filtrationWhether you want cartridge or sand filtration, how backwashing is handled, and what space the filter needs beside the shell.
UV sterilizationHow much chlorine or bromine you intend to dose. UV reduces chemical load but does not replace sanitisation.
OzoneShown as a feature of the model. Confirm how the ozone generator is controlled and what safety interlocks come with it.
Control systemOne set is shown. Agree the interface language, the placement of the panel, thermostat logic and whether remote monitoring is wanted.
StepsInternal or external steps, which side of the shell they sit on, and how they interact with decking or cladding around the spa.
LED lightingFour lights are shown. Confirm colour options, control method and whether lighting is tied to the same controller as the pumps.
Swim training systemOne set is shown for an 8.5 m shell. Discuss nozzle type, output setting and whether you need adjustable flow for different swimmers.

A single line worth repeating: confirm included equipment and electrical requirements for the selected configuration in writing. The catalogue figures describe a standard build, not your finished unit.

Size, Shape and Where the Unit Actually Goes

The 8490 mm length is what makes this model interesting: it gives real swimming length in a garden or terrace footprint. If that length does not suit the site, the range includes shorter shells such as Outdoor Swim Spa WS-PC05ST-L at 5490 × 2400 × 1470 mm, and the jet count and power profile change with it. Buyers comparing a heavier hydrotherapy build often look at Outdoor Swim Spa WS-SP600-MS, listed at 5900 × 2500 × 1600 mm with 29 jets and a higher total power figure, a different brief answered by a different shell.

Where the site demands something other than a rectangle, our Customizable Shape Outdoor Spa covers square, round, oval and curved designs in an acrylic shell with structural reinforcement, for gardens, terraces and leisure areas where a standard outline would clash with the landscape.

Decide these before you fix the option list:

  • Above ground, semi-recessed or fully recessed; this changes access panels, drainage and how steps are arranged.
  • Clearance for the plant area and for filter servicing. A spa that cannot be reached is a spa nobody maintains.
  • Decking, cladding or surround finishes, and whether they sit against the shell or leave a ventilation gap.
  • Distance from the power supply, and who runs the dedicated circuit on site.

How Customisation Fits Our Project Process

We work as a furniture and building materials supplier for villa, hospitality and office projects, so a swim spa usually arrives as part of a wider package rather than as a lone item. That is an advantage if you use it: the same team coordinating cabinetry, outdoor furniture, lighting and finishes can also sequence the spa with the surrounding works.

Through our Custom & OEM Service, buyers can discuss bespoke material finishes and textures, prototyping and flexible order quantities alongside the spa specification. Our Logistics & Door-to-Door Delivery covers freight forwarding, packaging and container loading and customs paperwork, worth planning early, because a spa shell and its options ship as bulky cargo and any late change to the option list changes the packing list. After arrival, Installation & After-sales Support covers on-site installation and inspection with the supplier.

For Australian buyers specifically, import terms, duties and delivery scope for a spa unit should be settled case by case during the quotation stage rather than assumed from marketing material.

A Pre-Order Checklist

  • Is every option in the quotation named, with quantity, and matched to the model code on the shell?
  • Does the total power figure reflect the agreed options, and does your site supply match it?
  • Is the water pump status written down, since the catalogue does not list one for this model?
  • Are filtration type, sanitisation method (ozone, UV, chemical dosing) and maintenance access agreed?
  • Are steps, LED control and the swim training nozzle type specified rather than left as "standard"?
  • Is the installation method, above ground, semi-recessed or recessed, drawn and confirmed?
  • Does the packing list and shipping documents match the final agreed configuration?

If you are specifying a swim spa for a villa, resort or private wellness space, send us the site dimensions and how you intend to use it: swimming length, hydrotherapy, or both. We will come back with a configuration for WS-PC08ST-L that states exactly what is included and what the site has to provide.