A kitchen quotation is easy to compare on price and hard to compare on substance. Two offers can look identical in a spreadsheet and still produce very different sites on handover. The Aluminum Frame with Solid Panel is a useful reference point for this problem, because it sits at the meeting point of two decisions that buyers usually make separately: what the carcass and frame are built from, and what fills the door opening. This checklist walks through both, plus the coordination work around them, so you can put an aluminium-frame, solid-panel quotation on the same footing as every other offer in your tender.

Why this combination gets specified at all

An aluminium frame gives you a thin, rigid, square edge around a door or carcass. A solid panel gives you an uninterrupted face — no glass, no open shelving, no visible interior. Together they suit kitchens where the brief asks for a clean, flat front and a hard-wearing edge line: apartment kitchens, serviced apartments, villa kitchens that open onto a living space, and any project where doors get opened hundreds of times a week by people who have no idea what is behind them.

It is also the combination most often bought badly. The frame profile, the panel substrate, the surface finish and the hardware are four separate line items, and suppliers frequently quote them as one number with none of the four defined. That is where the checklist below earns its keep.

Section 1 — Confirm the scope before you compare anything

  • Room list, not a building list. A villa kitchen, a pantry, a laundry and a guest-house kitchen are four separate cabinetry scopes with different moisture exposure and different hardware needs. Quote them separately.
  • Drawings at the right stage. As-built or construction-issue drawings, with wall lengths, floor levels, and the positions of waste, water, gas and power. Cabinetry measured from a design-stage sketch gets re-measured; cabinetry measured from construction-issue drawings usually does not.
  • A finished-floor datum. Every cabinet height in your quotation is only as good as the floor level it is measured from. State on the drawing what the finished floor build-up is, and who is responsible for achieving it.
  • Appliance schedule. Model numbers, not categories. Integrated ovens, drawer dishwashers and column fridges each have fixed cut-out dimensions that drive carcass sizes.
  • Stone and benchtop interface. Confirm who supplies the benchtop, who cuts the cabinetry to receive it, and what the tolerance is for the joint at the wall.

Section 2 — The frame: what to pin down on paper

For an aluminium-frame kitchen, the profile is the part that decides whether the doors look crisp or clumsy after a year of use. Ask each supplier to state, in writing:

  • Visible face width of the profile. This is the number you actually see from across the room. Two quotes at the same price can differ by several millimetres here, and it changes the whole character of a run of doors.
  • Wall thickness of the extrusion. Thin wall sections flex; flex shows up as doors that no longer sit parallel. Ask for the profile cross-section drawing, not just a photograph.
  • Corner joint method. Mitred with a spline, mitred with a welded corner, or mechanically screwed. This is the single biggest driver of how a frame survives transport and repeated use.
  • Surface treatment and its colour reference. Name the finish system and quote a physical sample or a manufacturer colour code. Describing an aluminium finish as "matte black" in an email means nothing until you have held the sample.
  • How glass-front and solid-panel doors are framed. If your design mixes both, ask for the detail of each. Solid panels and glass sit differently in a rebate, and the frame detail differs accordingly — see Glass Front Aluminum Frame Cabinets for how the same collection handles the glazed variant.

Practical test: ask for one corner sample of the frame, mitred, with the panel fitted. A 300 mm sample costs little and settles arguments about profile width, joint quality and finish colour faster than any specification sheet.

Section 3 — The solid panel: substrate, surface, edge

"Solid panel" describes an appearance, not a construction. Three separate questions sit underneath it:

QuestionWhat to require in the quotation
What is the core?The board type and its thickness, stated by name. The core carries the hinges and decides how well a door holds its shape near a dishwasher or a sink.
What is the surface?The finish system — lacquer, laminate, foil-wrapped, wood veneer — and whether the same system is used on the reverse face. A single-sided finish on a door that shows both faces will curl.
How is the edge finished?Edge banding material and thickness, or wrap-around treatment. Edges are where a kitchen ages in public; ask which edges get treated and how.

Then confirm the finish family against your own palette. The same aluminium-frame collection is offered with solid panels in Two Tone Aluminum Frame Cabinets and in darker, flatter treatments, so a two-tone scheme — light doors on a dark frame, or the reverse — can be specified within one product family rather than stitched together from two suppliers.

Section 4 — Hardware: the line item most often left vague

  • Hinges. Brand, model, closing action (soft-close or not) and the number of hinges per door by height. A tall pantry door needs more than a wall cupboard door; check that the quotation reflects this.
  • Drawer systems. Runner type, load rating, whether the runners are soft-close, and whether the drawer boxes match the carcass or are a cheaper substitute.
  • Handles or handleless. If the design is handleless, confirm the mechanism — routed pull, edge pull or touch-to-open — and who supplies it. Handleless fronts look simple and specify awkwardly.
  • Support legs, brackets and fixings. Ask whether these are included in the unit price or quoted as extras. They are small individually and easy to omit from a comparison.
  • Spare-parts provision. Hinges, runners and one or two spare door catches ordered with the main shipment cost almost nothing; sourced three years later from the other side of the world they do not.

Section 5 — Made-to-measure: what a custom size actually requires

Project kitchens rarely fit modular widths. Aluminium frame with solid panel cabinetry is supplied made-to-measure, with layout, dimensions and finish specified per project — which is an advantage only if the information reaching the factory is complete. Before any panel is cut:

  • A shop drawing for every run, dimensioned, with door swing direction marked on each door.
  • A signed door-and-drawer schedule: quantity, size, finish code and hardware set for every opening.
  • Cut-out dimensions for every appliance, confirmed against the actual model number.
  • Rebate and clearance dimensions where cabinetry meets a wall, a column or a ceiling — with the tolerance stated.
  • A written confirmation that the factory is building to those drawings, and who pays if they are revised after that date.

This is also the stage where custom built-in kitchen cabinets stop being a product and become a process: layout, panel material, surface finish and matching hardware are all fixed at once, and changing one after the others are locked costs more than choosing them carefully in week one.

Section 6 — Coordination, logistics and handover

For an overseas-supplied kitchen, the commercial terms decide whether a good product arrives as a good installation. Check each of these before award:

  • Packaging method. Framed doors travel badly in flat stacks. Ask how panels are protected at the corners and how glazing is separated from solid doors in the same crate.
  • Loading plan. Crate list matched to shop-drawing numbers, so the site team can find run A without opening six crates.
  • Delivery terms. Which party handles customs clearance, duties and the last leg to site, and what happens if delivery lands before the plasterer has finished.
  • Installation route. Whether the supplier's team fits on site, whether your trades fit from drawings, or whether a supplier installer supervises your crew. All three work; only one is in your contract.
  • Snag and warranty process. How replacement panels and hardware get ordered after handover, and what the response expectation is.

Service scope for these steps — design coordination, custom and OEM manufacturing, freight and door-to-door delivery, installation and after-sales support — is described on the SANTERSON services pages. Confirm what applies to your project, in writing, before award; nothing here should be read as a guaranteed service level.

Section 7 — The one-page comparison sheet

Take every quotation and fill in the same eight rows. If a supplier cannot complete all eight, that is your answer about them:

RowFilled in from the quotation
Frame profile face width and wall thickness 
Corner joint method 
Panel core type and thickness 
Surface finish system, both faces, colour reference 
Edge treatment 
Hinge and runner brand, model and count per door 
Included vs. excluded: legs, brackets, fixings, spares 
Delivery terms, installation route, snag process 

Frequently asked questions

Does an aluminium frame mean the whole cabinet is aluminium?

Not necessarily. In this collection the aluminium forms the frame, and the panel fills the opening; the carcass construction is a separate specification point. Ask which parts are aluminium and which are board-based, because that determines how you fix wall units and what load the fixings must carry.

Can I mix solid-panel doors with glass-front doors in one kitchen?

Yes, and it is a common way to break up a long run of wall units. Specify both door types from the same frame family so the profile, finish code and hardware set match — glazed fronts use glass front aluminium frame doors with a rebate detail suited to a pane.

What is the earliest point I can involve the manufacturer?

As soon as the layout is fixed enough to draw. Early input settles carcass sizes against appliance choices and avoids re-cutting made-to-measure panels later, which is where custom cabinetry projects lose time.

Should I order spares with the original shipment?

Yes. Hinges, runners, catches and one spare of each door finish ordered alongside the main order are inexpensive; matching a discontinued panel colour years later is not.

Putting the checklist to work

A complete buying checklist for an aluminium-frame, solid-panel kitchen comes down to four questions you can ask of any supplier: what is the frame, what is the panel, what are the fittings, and who owns the coordination from drawing to handover. Answer all four in writing on one page, and quotations become comparable instead of merely cheap-looking.

SANTERSON supplies aluminium-frame kitchen cabinetry with solid panels, made to project dimensions with selectable finishes and layouts, alongside interior fixtures for villa, apartment and hospitality projects. To check a set of drawings against this checklist and get a specification-level quotation, contact SANTERSON through the contact page.