A seven-metre swim spa with a training current sits in an awkward middle ground: too long for a tight terrace, yet not large enough to double as a full lap pool. Before you commit to Outdoor Swim Spa WS-PC07ST, it is worth checking what the neighbouring models in the same range offer, because the decision usually turns on footprint, shell depth and how the swim zone is separated from the hydrotherapy zone.

What WS-PC07ST Delivers

The Outdoor Swim Spa WS-PC07ST is a configurable outdoor swim and hydrotherapy unit listed at 7000 x 2400 x 1470 mm. The published specification sheet records one control system, one swim training system, one filter pump, six water jets, four LED lights and a total power figure of 6.55 kW. Ozone is included in the feature list alongside the jets and lighting.

Those numbers place the model clearly. Six jets is a modest hydrotherapy package, so WS-PC07ST reads as a swim-first unit with a relaxation zone attached, rather than a spa you occasionally swim against. The 1470 mm shell depth gives an adult room to stand at the side and enough water depth for a training current to operate without stalling against the floor of the shell.

The catalog does not list a water pump for this model, so confirm the pump arrangement, the electrical supply your site can provide and exactly which equipment is included in the configuration you order before signing off on any specification.

Where The Model Runs Into Limits On Site

Three practical constraints come up repeatedly when a shell of this length is set into villa and resort landscapes.

  • Terrace length. A seven-metre shell plus clearance for access panels, steps and equipment space usually takes more than eight linear metres. On narrow townhouse courtyards and rooftop decks, that is often the whole available run.
  • Deck width. At 2400 mm wide, the unit needs a structural platform that carries a fully flooded shell. Timber decking framed for furniture alone will not do it without redesign.
  • Hydrotherapy capacity. Six jets serve one or two people at a time. Where the brief calls for regular recovery sessions for a large household or a hotel gym floor, jet count becomes the limiting factor rather than water volume.

The Alternatives Worth Comparing

SANTERSON publishes several models in the same swim and hydrotherapy range, so comparing them is a matter of reading dimensions and equipment lists side by side rather than redesigning the scheme. The table below uses catalog figures only.

ModelCatalog dimensions (mm)Features shown in catalogWhy it competes with WS-PC07ST
Outdoor Swim Spa WS-PC06ST 5900 x 2400 x 1470 Water jets, LED lighting, Ozone, swim training system Roughly 1.1 m shorter with the same width and depth, for tight terraces where a full seven metres will not fit.
Outdoor Swim Spa WS-PC07ST-L 7490 x 2400 x 1470 Water jets, LED lighting, Ozone, swim training system The long version of the same shell. Extra length goes to the swim channel without changing the deck width.
Outdoor Swim Spa WS-PC07ST-S 7000 x 2400 x 1470 Water jets, LED lighting, Ozone, swim training system, automatic cover option Same footprint as the base model, with an automatic cover listed among its options.
Outdoor Swim Spa WS-PC08ST 8000 x 2400 x 1470 Water jets, LED lighting, Ozone, swim training system Adds a metre of length on the same 2400 mm width when the site allows it and longer swim runs are wanted.
Outdoor Swim Spa WS-PC07A 7000 x 3000 x 1470 Water jets, LED lighting, Ozone; no swim training system listed in the captured specifications Same length, wider shell at 3000 mm and a much larger jet package. The trade-off is that the catalog does not record a swim training system for this model, so it suits projects where hydrotherapy matters more than swim length.
Outdoor Swim Spa WS-PC05ST 5000 x 2400 x 1470 Water jets, LED lighting, Ozone, swim training system The compact end of the ST series, for courtyards and other positions where a shorter run is all the site allows.

Two patterns are worth noting when you read across that list. Within the ST series, the -L suffix adds length along the same 2400 mm width and keeps a comparable jet and power package, so it is the easiest substitution to make. Step outside that series and the equipment changes with the shell: the A-series alternative above is wider and carries a far larger jet count at a higher total power figure, which moves it away from swim training and toward hydrotherapy. Compare within a series when you want more length; compare across series only when the usage priority itself changes.

One caution on the smaller models. WS-PC05ST, WS-PC06ST and WS-PC07ST each show six jets and 6.55 kW in the catalog despite different lengths, so choosing a shorter shell does not lower the recorded power draw. Length changes how you swim; it does not change the equipment package in these listings.

How To Compare The Options

1. Fix the envelope before the model

Mark the finished deck line, then reserve clear space around the shell for access panels, ventilation to the equipment and a safe walking edge. The exact allowance depends on your local detail design, but whatever rectangle survives that exercise is your real procurement brief. Test every catalogue dimension against it, not against the drawing of the garden.

2. Decide which zone does the work

A swim spa used mostly for evening exercise needs length in the swim channel; a unit used mostly for soaking and muscle relief needs jets and seating. WS-PC07ST leans to the first use, given its six-jet package and single training system. If the way people will actually use the unit points the other way, a wider shell or a different hydrotherapy product is the better buy.

3. Read the equipment list line by line

Control system, filter pump, jet count and LED count are stated for each model. Optional accessories across this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so treat the option list as something to confirm in writing rather than assume.

4. Match the power figure to your supply

A total power figure of 6.55 kW is what the catalog records for these configurations. That number drives cable sizing, protection devices and where the equipment space sits relative to the main distribution board. Confirm it against the configuration you order and against the electrical capacity available at the property.

5. Check the shell depth against the people using it

At 1470 mm, the water depth suits adults who are swimming and standing. Households with small children, and hotel operations with mixed guests, need steps, handholds and a cover strategy settled at design stage rather than after installation.

When A Customised Shape Fits Better Than A Standard Model

Sometimes no standard shell fits the space. Irregular terraces, internal courtyards and spa rooms cut into a building envelope often call for a bespoke geometry. The Customizable Shape Outdoor Spa covers square, round, oval and curved layouts in an acrylic shell with structural reinforcement, for gardens, terraces and leisure areas where a rectangular unit simply will not resolve the plan.

For projects that need swimming and soaking split across two clearly separate zones, the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool is the other direction to look: an extended swim channel paired with a dedicated relaxation area.

A Procurement Checklist Before You Specify

  • Confirmed finished-deck dimensions, with clearance for access panels and steps already deducted.
  • Structural loading calculation for the platform carrying a flooded shell, not just the empty unit.
  • Electrical supply verified against the total power figure of the chosen configuration.
  • Written confirmation of which pumps, control systems and treatment equipment are included versus optional.
  • Insulation, cover and heating choices settled early, since they affect both running behaviour and the deck detail.
  • Delivery route checked: a seven-metre shell needs access for the vehicle and for lifting into position.

SANTERSON works as a manufacturer and one-stop supplier for furniture and building materials, with swim spas and swimming pools supplied alongside outdoor furniture, interior fixtures and finish products. For villa and hospitality packages, coordinating the spa shell with poolside lounging, paving and screening in a single procurement package tends to reduce interface problems on site.

Send Us Your Terrace Dimensions

Share the finished deck measurements, your electrical supply details and how the spa will be used day to day. We will confirm which configuration in the swim and hydrotherapy range fits that space, and exactly what is included in it.

Browse Swimming Pools and Swim Spas