A wall hung toilet rarely fails a project on aesthetics. It fails on paperwork that arrived too late: a rough-in that did not match the wall, a frame ordered before the bowl size was confirmed, or a spare part nobody could source in year three. If your team is specifying Wall Hung Toilet 1051W for apartments, villas or hotel bathrooms, this article sets out the record you should build before the purchase order is raised, and again before the goods ship.

Why wall hung WCs create extra documentation work

A floor-mounted close-coupled WC sits on the finished floor and connects to either a floor or a wall outlet. A wall hung unit carries its load through a concealed frame fixed to a structural wall, and the pan is suspended above the screed. That single change moves three decisions upstream of the ceramic order: where the waste outlet sits, what the supporting structure is, and how the access panel will be arranged for the flush valve and inlet.

For procurement teams this means the ceramic pan is only one line on a longer list. The frame, the concealed cistern, the actuator plate, the waste connection and the wall build-up are usually bought from different suppliers, and each hand-off is where responsibility gets lost. Recording who owns each item, and against which drawing revision, is the cheapest insurance available on a bathroom package.

The 1051W specification record

SANTERSON's published product page for this model states the following. Every figure below should be re-confirmed against the current technical drawing for your order before it enters a tender document, because catalogue pages and data sheets are revised independently.

ItemWhat the product page statesProcurement action
Model reference1051W wall-hung ceramic toiletFix one reference in the bill of quantities and keep it identical on drawings, purchase order, packing list and invoice.
Overall size530 x 360 x 360 mmCheck clearance against adjacent basins, doors and partitions on the room layout, not only against the fixture symbol.
Drain type and rough-inP-trap wall drain, 180 mm rough-inConfirm the waste outlet height and set-out on site before the wall is closed up. Wall drainage rules out a floor outlet unless the layout is redesigned.
Flush arrangementConcealed water tank systemName the frame and cistern supplier separately, and record the actuator plate model that matches it.
Body material and glazeVitreous ceramic with a smooth glossy glaze, described as resisting limescale and stainsAsk for the cleaning and disinfection guidance your operator will actually follow, and check it against the glaze description.
Typical applications on the pageLuxury apartments, boutique hotels, villa bathroom remodelsMatch the specification to the room type in your project rather than assuming one schedule covers guest bathrooms and staff or public restrooms alike.

One practical point worth flagging: the page describes a compact pan dimension suited to limited bathroom space, but it does not state a water consumption figure, a flushing volume, a certification mark or a load rating. Do not carry those numbers into your submittal from memory or from a competitor's datasheet. Request them in writing, and attach the reply to the specification record.

Six items to document before the purchase order

  • Rough-in verification. Record the as-built waste outlet height and horizontal set-out for a representative bathroom, with photographs and the room reference. Compare it against the 180 mm P-trap figure on the drawing revision you are building to.
  • Supporting structure. Note whether the wall is masonry, steel stud or timber stud, and who certifies the fixing detail. Wall hung pans depend entirely on that structure.
  • Frame, cistern and plate as a matched set. List the frame model, concealed cistern model and actuator plate together, with the supplier for each. A plate that does not match the valve is a snag you will find after tiling.
  • Access provision. Record how the flush valve and inlet stay reachable, and who is responsible for the access panel or boxing.
  • Room-by-room schedule. Count units per bathroom type rather than per floor. Guest bathrooms, ensuite villas and high-use restrooms wear differently and may need different maintenance schedules.
  • Spares and after-sales terms. Before ordering, confirm which replacement parts are stocked, how they are ordered, and what warranty period and exclusions apply to ceramic bodies versus mechanisms.

Keeping the bathroom package consistent

Specifying one WC model across a project is straightforward. Specifying the rest of the room so it reads as one design is where procurement earns its fee. The 1051W belongs to a wider sanitary range, so the same design language can be carried through Wall Hung Ceramic Basin 1051B, and where a layout calls for floor-mounted alternatives, through the pedestal basin and one-piece toilet listed in the same range. Keeping those items on one purchase order with one revision reference reduces the risk of mixed deliveries across phases.

The wider fit-out package behaves the same way. Basins, showers, vanities, mirrors, lighting and wall finishes in a guest bathroom typically come from several vendors on separate lead times. A single consolidated schedule that lists each item, its supplier, its expected ship window and its installation trade gives your site team one document to work from. Where a supplier handles more of that scope, coordination becomes simpler; see Bathroom Sanitary Fixtures for the categories SANTERSON lists, and One-stop Furniture and Building Materials Supplier for how combined supply is arranged.

What to agree before goods ship

  • Packing standard. Ceramic is the most common damage claim in a mixed container. Agree the packing method, corner protection and the photographic record taken at loading.
  • Inspection point. Decide whether inspection happens before loading or on arrival, and who bears replacement cost for breakage in transit.
  • Delivery split. For phased projects, order in room batches rather than one bulk delivery, and confirm storage conditions at site.
  • Document set. Commercial invoice, packing list with model references matching the bill of quantities, and any import paperwork your customs broker requires.

A short rule for the specification file: if a number is not on a drawing or data sheet you hold in writing, it does not belong in the submittal. Rough-in dimensions, sizes and material descriptions should all trace back to a dated document with a named author.

A closing checklist for the file

Before the package is issued for pricing, confirm that the record answers six questions: which model, in which rooms, on which wall build-up, with which frame and plate, delivered in what batches, and supported by which spares and warranty terms. If any answer sits only in someone's recollection, add it to the file.

SANTERSON is a China-based manufacturer and supplier of furniture and building materials serving villa, hospitality and office projects, with custom and OEM work, freight arrangements and installation support among the services listed on the site. Send your room schedule and drawings and our team can confirm the 1051W dimensions and rough-in against current production data, and advise which sanitary items in the same range can be consolidated on one order.

Start an enquiry

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Enquiry form: Contact Us