A floating modular system looks simple on a mood board and complicated on a site survey. Because the unit is fixed to the wall rather than standing on the floor, every dimension, service route and finish has to be agreed before production starts. This guide sets out the measurements, drawings and project decisions that let our workshop quote and build Santerson Floating Modular Systems correctly the first time, whether you are a builder, an interior designer or a private homeowner.
What we mean by a floating modular system
In our catalogue, floating modular systems sit in the customized furniture range under Modular Living Systems. The carcass is carried on a concealed wall-borne structure, so the underside stays clear and the piece reads as a band of storage running along the wall. The same configuration logic applies to the related collections we supply:
- Closed modular units, where doors hide the storage and only the front face is visible.
- Floating modular shelves, an open wall system for display and books.
- Floating TV units and media walls, where screen position and cable management drive the layout.
- Modular systems with lighting, where the joinery carries recessed lighting and its wiring.
- Floor-to-ceiling modular systems, used when a full wall of storage is preferable to a floating band.
Each of these listings is made to measure. Layout, dimensions, materials and finishes are specified per project, so the quality of your input data determines the accuracy of our quotation and the fit on site.
Measurements we need from the wall itself
Send dimensioned drawings where they exist; a marked-up set of architectural plans is better than hand notes. If no drawings are available, survey the wall and record the following for every elevation involved.
| Item | What to record |
|---|---|
| Wall length and usable run | Total length of the elevation, plus the clear length after you deduct corners, door openings, radiators, switches and any projection you must avoid. |
| Storey height and head clearance | Finished floor to finished ceiling. For a floating unit, also give the intended height of the underside above the floor and the top of the unit. |
| Depth envelope | Projection from the finished wall face, and whether the unit must clear a skirting board, cornice, architrave or window reveal. |
| Floor and ceiling finish levels | Screed and topping depths, plus the final floor level. Floating units are set out from finished levels, not structural ones. |
| Wall construction | Substrate type and thickness for each wall: masonry, stud partition with lining, timber frame or existing plasterboard. Fixings and subframes depend on this. |
| Squareness and flatness | Out-of-plumb walls, uneven reveals and any bowing. Note the worst deviation so we can allow for scribing or a packing frame. |
Site conditions that change the specification
The three inputs below are the usual cause of rework, so please settle them before you request a quotation.
Load path and substrate
A floating unit carries its full weight into the wall. Tell us what will be stored on it — books and ceramics, media equipment, glassware or wardrobe items — and which walls are load-bearing. Where a partition cannot take the load directly, we design a supporting subframe; that decision affects the wall build-up and needs to be coordinated with your trades.
Services behind and inside the joinery
Mark on the drawings every socket, switch, data point, downlight, air grille, sprinkler head, pipe or duct that falls within the unit zone. For systems with integrated lighting, send the required lamp positions, driver location, switching arrangement and dimming protocol, and confirm which party supplies the electrical work on site. We will not assume a service route that your drawings do not show.
Adjacent finishes
State the finish on each side of the unit — plaster and paint, stone, tile, wall panelling, glass or flooring — because the edge detail and any shadow gap depend on it. Where the unit meets wall panels and wall cladding, send the panel thickness so the junction can be drawn rather than resolved on site.
Product decisions to confirm with your quotation request
Alongside the survey data, please specify:
- Layout and proportions — the split between open shelves, closed compartments and display niches, and which bays align with doors or furniture.
- Materials and finishes — panel substrate, door style, surface finish and edge treatment. We work in wood, metals, engineered stone and laminates, and we can match a sample you post to us.
- Hardware — door operation, soft closing, handles or push-to-open, drawer configuration and load rating for pull-out items.
- Lighting — recessed or surface fittings, colour temperature, and where transformers and control gear sit for servicing.
- Quantities and locations — number of identical sets, room list, and the delivery address for each.
- Programme — required site-ready date and the point at which your walls will be closed up.
How the information moves through our process
Santerson operates as a one-stop furniture and building materials supplier, so the same survey data carries forward into the rest of the package. Our cooperation steps are brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up.
- Design and planning — our interior design services team turns your measurements into furniture layouts and 3D renderings, and coordinates the joinery with flooring, wall finishes, lighting and interior fixtures.
- Custom and OEM production — through our custom & OEM service, we handle design and prototyping, bespoke finishes, branding such as engraving or logos, and flexible order quantities for multi-unit developments.
- Logistics — logistics and door-to-door delivery covers freight by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking.
- Installation and after-sales — installation and after-sales support includes on-site fitting, inspection and snag lists, spare parts and maintenance guidance.
For whole-apartment and villa packages we coordinate modular living systems with custom built-in kitchen cabinets, wardrobes, doors and flooring under one turnkey interior project solution, which removes the interface risk between separate joinery, flooring and lighting suppliers.
A short checklist for your enquiry
Before you send a request, confirm that it contains: dimensioned drawings or a wall survey with finished levels; wall construction and load notes; all services in the unit zone; the required layout split; materials, finishes and hardware; lighting details; quantities and delivery addresses; and your site-ready date. A complete pack of this kind lets us return an accurate quotation and shop drawings without a second round of questions.
Send your drawings and wall survey to Santerson — we will confirm the specification, issue shop drawings for approval and build the units to your finished dimensions. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or open our Contact Us page at https://www.santerson.com/contact/ to send drawings directly.