A modular living system with integrated lighting is one of the most specification-heavy items in a villa or hospitality fit-out. It combines joinery, storage, display and electrical work in one made-to-measure package, which means an incomplete enquiry turns into three or four rounds of email before anyone can price it. If you are sourcing the Santerson modular system with lighting (living system) for a residential or project build, this is the information that lets our team come back with a usable quotation instead of another list of questions.
Start With the Room, Not the Product Name
Modular living systems are built to the wall they sit on. Send us the drawings before we send you anything: a dimensioned elevation of the wall, the room plan showing how people move past it, and the finished floor level and ceiling height at both ends of the run. Ceiling heights in older villas and renovated apartments rarely stay constant, so a single height figure is not enough for a floor-to-ceiling build.
Tell us what the unit has to do. A media wall, a display wall for collectables, a library wall and a storage wall with concealed appliances each need different carcass depths, shelf spans and door types. If you are still deciding between layouts, say so — we can work from the room and the use case rather than a finished design.
Specify the Configuration You Actually Want
The modular system with lighting is configurable in layout, dimensions, material and finish, so the closer your enquiry gets to a configuration, the more accurate the price. Please include:
- Overall width, height and depth of each run, plus which sections are open shelving, closed cabinets, drawers or display niches.
- Door style and opening direction — hinged, sliding, lift-up or handleless — and whether hardware should be visible or concealed.
- Body material and door face material, with the finish you want (lacquer, melamine, acrylic, veneer or wood tone) and a reference colour or sample number where you have one.
- Shelf load expectations: heavy books, stone decorative objects and audiovisual equipment all change shelf thickness and span support.
- Whether the unit must clear skirting, radiators, downlights, air-conditioning grilles or structural columns.
Related configurations in the same collection help when you want one visual language across several rooms. Santerson Floor to Ceiling Modular Systems covers full-height living walls, and our Integrated Lighting Systems carry the same lighting brief across modular shelving in studies, hallways and office space.
The Electrical Details Decide Whether It Works on Site
Lighting is where most enquiries go wrong, because the joinery and the electrician are usually specified by different people. For every lit section, tell us:
- Where the light should fall — shelf edge, niche back panel, under a cabinet base or behind a concealed cove.
- Switching and control: wall switch, door-triggered, motion sensor, remote or a dimmer on the site circuit. Note if the site team is using a central lighting control system.
- Colour temperature and brightness preference, and whether matching light output across multiple rooms matters.
- Where the transformer or driver may sit and how it must remain accessible for servicing.
- The mains supply and plug standard for the destination country, plus the voltage of the site circuits.
Electrical specification is confirmed against the configuration you choose rather than assumed from a catalogue page. If your electrician has issued a lighting layout or circuit schedule, attach it — that single drawing usually settles the whole conversation.
Project Context Changes What We Quote
The same system is quoted differently for one villa and for a repeated hotel or apartment programme. Include:
| Item | Why it matters to the quotation |
|---|---|
| Quantity of identical or near-identical units | Repeated modules can be produced as a series; one-off dimensions are handled individually. |
| Project type and location | Villa, hotel, serviced apartment and office projects have different approval processes and site access. |
| Site readiness date and handover date | Sets the production sequence and how shipments are split. |
| Who installs on site | Our team, your contractor or a local joiner each need different packaging, drawings and fixing details. |
| Approval chain | Named architects, interior designers or client representatives each need samples and drawings in their own format. |
If the modular wall is part of a wider fit-out, mention the other scopes now. We supply furniture and building materials under one programme (cabinetry, lighting, wall and ceiling finishes, flooring and loose furniture), so coordinating them early avoids finish mismatches later. See Turnkey Interior Project Solutions for how multi-scope projects are run.
Attachments That Speed Up the Quotation
- Dimensioned wall elevations and a room plan, in PDF or DWG.
- A mood board, reference photograph or finish sample number for the look you want.
- The lighting layout or circuit schedule from your electrical consultant.
- Photographs of the actual wall, including corners, skirting and anything protruding.
- Any client specification document that names materials or hardware brands.
What Happens After You Send the Enquiry
Our process follows the same three steps on every project: a design proposal against your brief, then quotation and detail confirmation, then production, shipment and follow-up. For custom work we produce 3D models and prototypes before production, and material options span wood, metals, engineered stone and laminates. Freight is arranged by sea, air or rail with customs paperwork and door-to-door delivery, and installation and after-sales support are available where the project requires them.
Common Questions in Enquiries
I only have a photograph of the space. Is that enough?
Enough to start a conversation and estimate a range, not enough for a firm price. Send the photograph now with rough measurements, and we will tell you what drawings we need next.
Can the lighting match fixtures elsewhere in the project?
Yes, when you give us colour temperature, output and control method for the existing fittings. Tell us which lights are already specified or installed so the modular system is matched rather than chosen independently.
Can one enquiry cover several rooms?
Yes, and it usually works better. Send each wall as its own elevation with its own notes; we price them as a set and keep the finishes consistent across the house or property.
Send your drawings, quantities and lighting brief to SANTERSON — phone and WhatsApp +86-13928214007, email santerson@qq.com, or through the contact page. Include the details above and you will receive a specification-based quotation for your modular living system rather than a generic price list.