A swim spa quotation only works when the specification behind it is unambiguous. Here is how buyers, contractors and project managers can write a product specification for Outdoor Swim Spa WS-S04B that holds up in production, freight and site installation.
Most disputes over an outdoor swim spa do not start with the water. They start with a purchase enquiry that said nothing more than "one 3.9 m spa" while the site drawing assumed steps on the long side, a heat pump for overnight use in a cool-climate villa and a dedicated electrical circuit that nobody had planned for. When the same unit is described three different ways in the enquiry, the order confirmation and the installation brief, the cost of fixing that later falls on somebody.
The specification below is written for a buyer who wants one document that procurement, the factory and the site team all read the same way. WS-S04B is one model in our configurable outdoor swim and hydrotherapy range, so the same structure applies to neighbouring models if you swap the figures.
1. Start with the shell dimensions and how the unit sits on the slab
Write the catalog envelope first, then state what you expect around it. For WS-S04B the catalog dimensions are 3900 × 2200 × 1450 mm (length × width × depth). Those numbers describe the shell as manufactured; they do not include steps, clearance for access panels or the working space an installer needs to reach the pump compartment.
In the specification, give three separate measurements rather than one:
- Shell envelope — 3900 × 2200 × 1450 mm as catalogued, so production and freight documents match.
- Recess or plinth — whether the spa is fully above ground, partially sunk into a deck, or set into a timber platform, with the finished deck level noted.
- Service access — which side the equipment is reachable from, and how wide that access has to be for a person to work in it.
If the spa sits on an upper terrace or a suspended deck, add the wet loaded weight as an item for the structural engineer to verify. Never let that figure stay implicit in a project drawing.
2. Specify the water system by count and function
The catalog data for WS-S04B gives you a starting list you can quote clause by clause:
| Item | Catalog value for WS-S04B |
|---|---|
| Model | WS-S04B |
| Catalog dimensions | 3900 × 2200 × 1450 mm |
| Control system | 1 set |
| Water pump | 3 pcs |
| Filter pump | 1 pc |
| Jet total | 31 pcs, including 6 water columns |
| LED lighting | 2 pcs plus 28 small LED lights |
| Total power | 10.35 kW |
| Features shown | Water jets, LED lighting, Ozone |
| Swim training system | Not listed in the catalog record for this model |
Two points matter more than the totals. First, jet count only means something when you say what the jets are for: a hydrotherapy seat, a back massage zone and open water columns behave differently, and the seating layout follows from that. Second, if your brief calls for continuous lap swimming rather than hydrotherapy and paddling, ask explicitly whether a swim training system is included in your configuration — it is not listed for WS-S04B as catalogued, so it must be confirmed before you rely on it.
3. State what is included and what is an option
Catalog-listed options across this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so list each one in your specification as "included", "optional — quoted separately" or "not required", and keep the wording identical in the enquiry and the purchase order.
For a villa or resort project in a cool or temperate climate, heating and insulation usually decide running comfort more than jet count does. If overnight water temperature matters to the client, write the heat pump and insulation into the specification at the outset instead of treating them as an afterthought once the spa is on site.
4. Put the electrical requirement in writing early
Total power for WS-S04B is shown as 10.35 kW. That number is the one your electrician needs, not a generic "as per manufacturer". In the specification record:
- Supply voltage and phase required at the spa location, confirmed against the local supply rather than assumed.
- Cable route, isolator position and protection device sizing, shown on the electrical drawing.
- Whether heating, circulation and lighting can run simultaneously, and what the client expects to run in winter.
- Who supplies the final circuit and who terminates at the unit — the boundary between the site contractor and the spa supplier.
Local wiring rules, permits and earthing requirements are the responsibility of the local designer and installer. Ask your supplier for the configuration's electrical data sheet and hand that to the licensed electrician on site; do not transfer a specification from another market and assume it applies.
5. Describe the siting and the surrounding outdoor package
A swim spa is rarely ordered alone. Villas and resort villas typically pair it with loungers, a shade structure and storage for towels and chemicals. If your project needs that too, say so in the same enquiry so one production and freight plan covers it. Our Outdoor Furniture range — loungers, daybeds, pergolas, gazebos and dining sets — is produced alongside the spa range, which makes a single coordinated delivery practical.
Where the plot shape or the deck edge does not suit a rectangular shell, our Customizable Shape Outdoor Spa covers square, round, oval and curved layouts in an acrylic shell with structural reinforcement. Note that this is a different product route from the catalogued WS-S04B: a custom shape has its own dimensions and equipment schedule, so it needs its own specification sheet rather than an edited copy of ours.
6. Add the project-level clauses that prevent rework
For hospitality and multi-villa schemes, add four short clauses under the product data:
- Configuration lock date — the date after which equipment options cannot change without a revised drawing.
- Packaging and handling — crate dimensions and lifting points, so the crane or forklift plan matches reality.
- Snag list scope — what is inspected at handover: jet operation, filtration cycle, lighting, controls, seals.
- Spare parts — which pumps, jets and control components you want held on site for a busy season.
Our Turnkey Villa Furnishing service covers design coordination, production, logistics and installation support in one workflow, which is how spa procurement usually fits into a wider fit-out package.
A quick pre-order checklist
- Shell envelope stated as 3900 × 2200 × 1450 mm, with deck level and access side shown on the drawing.
- Pump, filter pump, jet count and water columns listed item by item in the order confirmation.
- Heating, insulation, UV sterilization, sand filtration and steps each marked included or optional.
- Electrical data sheet issued to the site electrician, with supply and protection confirmed locally.
- Swim training requirement either confirmed as available for the configuration or removed from the brief.
- Structural loading check signed off if the spa sits on a terrace or suspended deck.
- Freight mode, crate dimensions and lifting method agreed before production is released.