Integrated lighting looks simple on a drawing. A strip of light inside a shelf niche, a fitting behind a mirror, a driver hidden in a cabinet carcass. On site it is one of the fastest ways to create rework, because the light has to be agreed with the joinery that carries it, and both have to arrive together. If you are specifying Santerson Integrated Lighting Systems for a villa, hotel or office fit-out, the checklist below covers the decisions that actually decide whether the installation goes smoothly.
Why integrated lighting belongs on the joinery checklist, not the electrical one
In our modular shelving and living systems, lighting is built into the unit. Channels, cable routes, diffuser profiles and the mounting detail for each fitting are part of the panel and carcass work, which means they are fixed at the point the joinery is engineered. Once a shelf side or a back panel is cut and grooved, adding or moving a light run later means new parts, not a new cable.
That is why the lighting schedule should be closed out together with the layout drawings and finish approvals, rather than left to the electrical package. Our Interior Design Services team works through space planning, product specification and production coordination as one sequence, so the light positions on your drawing are the light positions in the factory.
1. Scope: which units actually carry light
Start by listing every unit that has a light in it, and what the light is for. A single project usually mixes several jobs:
- Ambient wash — light bouncing off a wall or ceiling from a shelving run.
- Display accent — niches and open shelves that hold objects, books or merchandise.
- Task light — under-cabinet lighting over a work surface, or mirror-side light in a bathroom.
- Marked product lines — Santerson Modular System with Lighting (Living System) for living areas, and Santerson Integrated Cabinet Lighting for bathroom cabinetry.
Write the scope unit by unit. A schedule that says "shelving with lighting" is not a schedule; it is an argument waiting to happen on site.
2. Layout and dimensions: the numbers you must lock before production
Our modular systems are made to measure — layout, overall dimensions, material and finish are specified per project. For lighting, three extra measurements matter as much as the unit size:
- Niche depth and reveal — how far the diffuser sits back from the front edge, and whether the groove is visible from the room.
- Run length per section — long continuous runs are usually split at module joints, which changes where drivers and connectors sit.
- Service access — how a driver or transformer stays reachable after the unit is fixed to the wall.
Confirm these on marked-up elevations, not on a mood board. If a switch, sensor or dimmer is expected, say which one and where it sits, because that position drives cable routing inside the carcass.
3. Electrical specification: confirm it per configuration
This is the item most buyers skip. Product pages for our integrated lighting describe configurable layouts and finish options, and they ask that electrical specification and compatibility be confirmed for the chosen configuration — not assumed from a catalogue image. For each light run, agree and record:
| Item | What to decide | Who confirms it |
|---|---|---|
| Voltage and driver location | Low or line voltage; where the driver is mounted and how it is accessed | Your electrician plus our production team |
| Switching and dimming | Wall switch, sensor, remote or smart control; whether the driver supports it | Your controls consultant |
| Colour temperature | One value for the whole run, matched to the room scheme | Designer / client sign-off |
| Output level | Ambient, accent or task; check against surface reflectance of the finish | Designer |
| Diffuser type | Opal, clear or linear; whether LED dots are visible at the viewing angle | Designer / our production team |
| Environment rating | Bathroom and outdoor-adjacent locations need a rating suited to the position | Your electrician |
4. Finish and material coordination
Integrated light changes how a finish reads. A pale lacquer reflects a strip back into the eye; a dark veneer swallows it; a metal or glass shelf shows every dot. When you approve finishes, look at them with the lighting detail in mind, and ask for the diffuser profile to be shown on the elevation so you know what is visible when the light is off as well as when it is on.
Where the same room also has decorative fittings — Santerson Wall Sconces, pendants or ceiling fixtures — keep one colour temperature across the joinery light and the loose fittings. Mixed temperatures in one sightline is the most common complaint we hear after handover.
5. Packaging, delivery and sequence on site
Lights, drivers and diffusers travel with the joinery they belong to, packed so that profiles do not bend in transit. Our logistics service covers freight forwarding by sea, air and rail, customs paperwork, container loading and door-to-door delivery; for your destination port and import terms, confirm Incoterms, duties and transit time for the specific shipment rather than relying on general figures.
On site, decide the order of work early: first fix and levelling of the units, then wiring into the designated positions, then fitting of diffusers and finally commissioning. Recording that sequence in the programme prevents the classic delay where joinery is installed before the electrician has pulled the correct cables.
6. Commissioning, spares and after-sales
- Test every run on site before handover, including dimming at both ends of the range.
- Record driver model and location on the as-built drawing, one line per light run.
- Order spare strips, diffuser lengths and drivers with the original package; matching later is harder than buying now.
- Agree what is covered under warranty and how spares are supplied, in writing, before shipment.
Our service scope includes on-site installation support, inspection of snags, spare parts and ongoing maintenance. Response-time figures published on the site should be confirmed for your project location before you rely on them in a client-facing programme.
The checklist in one place
- [ ] Unit-by-unit lighting schedule, with the purpose of each run named
- [ ] Marked elevations showing niche depth, run length and diffuser position
- [ ] Voltage, driver model and driver access point agreed per run
- [ ] Switching, sensor or dimming method confirmed as compatible
- [ ] Single colour temperature fixed across joinery light and loose fittings
- [ ] Diffuser profile approved for both light-on and light-off appearance
- [ ] Environment rating confirmed for bathroom and damp positions
- [ ] Delivery terms, packing standard and arrival date agreed per shipment
- [ ] On-site sequence fixed: units, wiring, diffusers, commissioning
- [ ] Spares ordered with the package; warranty terms in writing
Where to start
Send us the room elevations and the unit list, and note which units you expect to carry light. We will come back with a lighting layout matched to the joinery detail, together with the electrical items your engineer needs to confirm. Because these systems are engineered per project rather than picked from a stock list, that exchange is where most of the risk is removed.
Specify integrated lighting with the joinery, not after it
Share your drawings and we will price the shelving, cabinetry and lighting as one package under Turnkey Interior Project Solutions.
Contact: PHILLIP · Phone / WhatsApp +86-13928214007 · santerson@qq.com