A flooring enquiry that reads "European oak, natural grade, matt lacquer" is not an enquiry a factory can price. Two suppliers can quote completely different boards from those three words. The brief below is the list of decisions we ask project buyers, contractors and designers to settle before we quote European oak engineered wood flooring or any other board in our flooring range — so that the price you approve is the price you receive, and the sample on your desk matches the container at site.

Why the Brief Decides the Outcome

Engineered oak is a built-up product. A wear layer, a core, a backing, a finish system and a cut pattern all sit inside one board, and each of those can be changed without changing the name on the packing list. That flexibility is what makes engineered flooring useful on projects — villa floors, apartment fit-outs, hotel guest rooms — and it is also where misunderstandings start.

When a brief stays at the level of "oak look, wide plank", the manufacturer fills every blank with their own default. When the brief specifies the build, the quotation becomes comparable across suppliers, production starts from an approved sample, and variation orders during the job are rare. The sections below are what we need written down.

Format: Plank, Parquet or Herringbone

Start with geometry, because format drives board size, waste rate, laying labour and how the floor reads in the room.

In the brief, state the format and the module size you want, plus the laying direction for each room. For parquet and herringbone, ask us to confirm the module dimensions against your actual room sizes before ordering — pattern floors are where a drawing and a site measure most often disagree.

Board Dimensions and How They Are Built

Give us four numbers: board length, board width, total board thickness, and the thickness of the solid oak wear layer. The last one matters more than buyers usually expect. Our oak boards are made with a 3 mm solid oak top layer over a multilayer base. That wear layer is thick enough to bring out real wood grain and knots, and it also sets how far a floor can be refinished later in its service life.

The multilayer base is not decoration. Solid oak moves with humidity; a cross-laid engineered structure holds its shape far better, which is why engineered boards are the practical choice where a building is heated, cooled or left unoccupied for stretches of the year. Several boards in our range — including the European oak parquet engineered hardwood flooring and the dark herringbone above — are described as compatible with underfloor heating. If your project has hydronic or electric heating in the slab, say so at enquiry stage: it changes the adhesive you specify, the acclimatisation routine, and how the heating should be run in before laying.

Put a single line in the brief for each item: total thickness required, wear-layer thickness required, and whether underfloor heating is present. If your drawing already states these, send the drawing — never paraphrase it.

The word "custom" is where the brief has to be most precise. Published boards such as 2207 already carry a stated finish; anything outside that range is developed from a sample with you, tone by tone.

Colour, Grade and Surface Treatment

"Natural" means different things in different factories. Three separate decisions sit behind the look of an oak board, and the brief should name all three.

DecisionWhat to write in the brief
Tone and treatmentUntreated light tone, smoked or fumed tone, stained tone. Example: 2207 is a light honey tone with a smoked antique treatment; 2211 is a deep charcoal stain.
Character gradeHow much knot, sapwood and colour variation you accept — and whether sound knots are wanted or must be cleared. Product photos show one board, not the whole distribution.
Surface textureSawn, brushed or scraped; wire-brushed surfaces hold more pigment in the grain and read darker at a distance.

Send a reference image and name the board you are referring to. If your reference is a competitor's product photo, tell us — we will match the build, not the brand, and say where the result will differ.

Finish System and Edge Profile

State the finish type (matt, satin or gloss lacquer; hard wax oil), how many coats you expect, and whether micro-bevel or square edges are required on the long sides. Edge profile decides how visible the joints are under raking daylight, and it is one of the cheapest things to get wrong late.

For hospitality and rental villa work, ask which finish system we apply at the factory rather than on site. Factory-applied lacquer cures in a controlled booth, which is hard to achieve with a brush in an occupied building. If a floor may need refinishing in place later, say so at enquiry stage so we specify a wear layer and finish that can take it.

Quantities by Room, Not by Project

Send a take-off per room or per unit type: net area to be covered, plus the format you want for each. Tell us the laying direction and module size first; we will then add an allowance for cuts and pattern matching on top of your net figure.

  • Order a single production run for one building phase where possible. Boards from separate batches can differ in tone even within the same grade.
  • Hold back a reserve of spare boards for future repairs, and store them on site in the same conditions as the installed floor.
  • If your programme has phased handovers, say which rooms are needed first. Flooring is finished late in a job and delays land on you.

Samples: Approve Them Twice

Ask for two sample stages. First, a small board or offcut to confirm tone and grade against your mood board. Second — before the full order is released — a sample from the actual production batch, laid out in your site's lighting with three or four boards side by side. One sample board tells you nothing about variation across a delivery.

Sign and date the approved sample, photograph it, and keep it until handover. That single sheet of oak settles almost every argument about "not what we ordered".

Delivery, Packaging and Site Conditions

Finish the brief with logistics: delivery address or port, packaging strength for the freight mode you are using, and the moisture content of your subfloor at the intended laying date. Engineered oak is delivered stable; a wet slab will not keep it that way. Our logistics and door-to-door delivery service handles freight forwarding with the associated customs paperwork, so we can quote delivered to site rather than ex-factory once you give us the address. Confirm import terms, duties and transit time for your country with us directly, as these vary by destination.

If flooring is one line in a longer list — cabinetry, wardrobes, wall panelling, doors — send it as one enquiry. Ordering engineered wood flooring together with the joinery that meets it at the skirting avoids two trades arguing over a tolerance nobody specified.

A Briefing Table You Can Copy

Brief itemYour answer
Project and roomsBuilding type, room list, handover dates
FormatPlank / parquet / herringbone; module size; laying direction per room
DimensionsLength × width; total thickness; wear-layer thickness
Tone and treatmentReference board number or image; treatment type
GradeKnot and colour variation accepted; sound knots yes/no
Surface and finishTexture; sheen level; coats; factory or site application
EdgesMicro-bevel or square; skirting and threshold details
SubstrateSubfloor type, moisture reading, underfloor heating yes/no
QuantityNet m² per room; spare allowance; phased delivery needs
SamplesApproval sample, then production-batch sample
DeliverySite or port, Incoterms, packaging requirement

Send that table with your drawings and we will return a quotation built on the same product you intend to install — not on our default board.

Working With a Manufacturer Who Builds to Your Brief

A written brief only pays off if the factory can actually build to it. SANTERSON has been manufacturing furniture and building materials since 2008, supplying villa, hospitality and office projects. Flooring is one part of a wider fit-out that also covers custom built-in kitchen cabinets and custom bedroom wardrobes. Where floor, joinery and panelling come from one production run, oak tones can be specified together at the briefing stage instead of being matched on site by eye.

Where a project needs a tone or format outside the published range, our custom and OEM service covers bespoke finishes and textures with flexible minimum order quantities. Tell us the specification and we will confirm what can be produced, at what cost, before you commit the detail to the contract drawings.

Send us your flooring specification

Email santerson@qq.com or contact PHILLIP on WhatsApp +86 13928214007 with the brief table above and your drawings. We will quote against your stated build, send approval samples, and confirm production and delivery against your programme.

Factory and office: Longjiang, Shunde, Foshan, Guangdong, China.