European Oak Engineered Wood Flooring
European Oak Engineered Wood Flooring
European Oak Engineered Wood Flooring
European Oak Engineered Wood Flooring

European Oak Engineered Wood Flooring

Description

This European oak engineered flooring features a 3mm solid oak top layer with a warm smoked finish. It highlights natural knots and rich grain, while the stable multilayer structure reduces deformation. A refined choice for classic, rustic and contemporary interiors.

Description

This European oak engineered flooring features a 3mm solid oak top layer with a warm smoked finish. It highlights natural knots and rich grain, while the stable multilayer structure reduces deformation. A refined choice for classic, rustic and contemporary interiors.

Features

  • - 3mm European Oak Top Layer
  • - Warm Smoked Finish
  • - Stable Multilayer Structure
  • - Classic Rustic Aesthetic
  • - Easy Maintenance