A swim spa specification is the document that decides whether a project quotation is comparable, whether the site preparation is correct, and whether the finished installation matches what the design intent required. Below is the working format we use for Outdoor Swim Spa WS-S08B, a 7.8 metre configurable swim and hydrotherapy unit, so that buyers, consultants and contractors can request the same information and compare it properly.

Why the specification matters more than the model number

Outdoor swim spas look interchangeable in a catalogue. Two units of similar length can carry different pump counts, different control arrangements and very different connected power. If an enquiry only states "8 m swim spa with jets", three suppliers will quote three different machines at three different prices, and the differences will surface later as electrical upgrade costs, missing options or an enclosure that does not fit the terrace.

A clear specification removes that risk. It records the shell dimensions, the equipment included in the price, the options that are quoted separately, and the items still to be confirmed on site. For procurement teams coordinating a one-stop project furnishing supplier, the same document also becomes the reference for freight booking, crane or access planning, and the handover checklist.

Section 1: Shell and footprint

Start with the fixed geometry of the unit, because everything downstream — deck framing, plant room distance, drainage runs, access routes — depends on it.

ItemCatalogue entry for WS-S08B
ModelWS-S08B
Catalogue dimensions7800 x 2200 x 1500 mm (L x W x H)
CategoryOutdoor swim spa / hydrotherapy pool
Configuration statusConfigurable; included equipment to be confirmed per order

Record the height as carefully as the length. A 1500 mm shell depth affects retaining walls, raised decking and whether the unit is installed above grade, semi-recessed or fully recessed — a decision that should be made before the surround is built, not after delivery.

Dimensions above are transcribed from the published catalogue entry. Treat them as design inputs to be confirmed against the production drawing for your order before any concrete, steel or decking is fixed in place.

Section 2: Water and hygiene equipment

This is the section most often left vague. List each item with a quantity, not an adjective, so that quotations can be read line against line.

ItemCatalogue entry for WS-S08B
Jet total98 pcs
Water pump4 pcs
Filter pump2 pc
Control system2 sets
OzonisationListed as a shown feature
WaterfallListed as a shown feature

Two practical notes from the table. First, the jet count of 98 only means something together with the pump arrangement that feeds it; a specification that gives jets without pumps invites substitutions. Second, two control sets on this model imply separate zones or positions of control — worth stating explicitly in your enquiry so that the quotation covers the full arrangement rather than a single panel.

Lighting

  • LED lights: 7
  • Small LED lights: 46

State the lighting quantities in the specification as well. They change the low-voltage wiring routes, and on hospitality and villa projects they are frequently reviewed by the lighting designer after the pool shell has already been ordered.

Section 3: Connected power

The catalogue lists total power of 14.6 kW for this configuration. Put that figure in the specification and pass it to the electrical engineer early, because it determines cable sizing, protection devices, isolation location and, on an existing property, possibly a supply upgrade.

Ask your supplier to confirm, in writing and for the exact configuration quoted: total connected power, supply voltage and phase, circuit requirements, the position of the isolator, and which equipment in the quotation is included in that power figure. Electrical requirements vary with the options selected, so this confirmation belongs to the final order rather than the first enquiry.

Section 4: Options quoted separately

The catalogue lists optional accessories for this range: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs to be confirmed against the specific unit being ordered.

Two of these deserve attention at specification stage rather than at delivery:

  • Heat pump. It sets the running-cost profile and adds its own circuit. If the project expects year-round use, the heat pump should be in the initial quotation so that the power total and plant location are correct from the start.
  • Insulation. Relevant to energy performance and to installations in cooler or exposed locations; it also affects how the shell is enclosed.

Swim training system

The captured specification for WS-S08B does not list a swim training system. If your brief assumes an endless-current swimming lane, raise it as an explicit line item and get written confirmation of what the selected configuration provides. Do not infer it from the words "swim spa" or from a similar model in the same range.

Section 5: Site conditions and scope boundaries

A usable specification states what is outside the supply as clearly as what is inside it. For a project of this type, confirm in writing:

  • Foundation or slab loading, and who designs it
  • Drainage, overflow and fill-water connections
  • Access route for delivery and lifting, including any crane requirement
  • Water treatment regime and chemical storage arrangements
  • Surrounding deck, cladding and any enclosure works
  • Local consent or permit requirements, which are the responsibility of the project team and vary by location

A short checklist to send with your enquiry

  • Model designation and catalogue dimensions, including height
  • Jet total, water pumps, filter pumps and control sets, each with quantities
  • Filtration method, sanitisation method and any UV option
  • Waterfall and lighting quantities
  • Total connected power for the exact configuration quoted
  • Options required: heat pump, insulation, steps, sand filtration, extra control systems
  • Whether a swim training system is included — confirmed, not assumed
  • Delivery access, lifting method and scope boundary for civil and electrical works

Sending that list produces comparable quotations. It also means the supplier can move directly to a production drawing instead of another round of clarifying questions.

Where this fits in a wider project package

Swim spas are rarely ordered alone. On villa and resort work they sit alongside poolside lounging furniture, pergolas and shade structures, exterior finishes and lighting — all of which are usually coordinated by one procurement lead. As a furniture and building materials manufacturer working on turnkey villa and hospitality projects, SANTERSON supplies the swim spa within that wider package, from design coordination through production to delivery and installation support.

Confirm before you order

The figures in this article come from the published catalogue entry for WS-S08B. Included equipment, options and electrical requirements depend on the configuration selected, so confirm them against your own quotation and production drawing before any site work begins.

To request a specification sheet or a configuration review for Outdoor Swim Spa WS-S08B — or to place the unit within a broader villa or hospitality package — contact SANTERSON: https://www.santerson.com/ · Phone/WhatsApp +86-13928214007 (PHILLIP) · santerson@qq.com