A swim spa quotation is only as good as the information behind it. For a long-run model such as Outdoor Swim Spa WS-130CⅣ-U, an early enquiry that lists site conditions, water-system choices and electrical supply lets the manufacturer return one clear price instead of a chain of revisions. The checklist below follows the same order we use when we prepare a quotation, so buyers, builders and project managers can send everything in a single message.

Model Reference and What the Catalog Already Covers

Send the model code exactly as it appears on the product page. WS-130CⅣ-U sits in our configurable outdoor swim and hydrotherapy range, with catalog dimensions of 11830 x 3000 x 1430 mm. The catalog entry for this reference lists one control system set, four water pumps, one filter pump, a jet total of 23 pcs, five LED lights and a total power figure of 11.85 kW, with water jets, LED lighting and ozone shown as the features for this configuration.

Treat those numbers as a starting point rather than a finished specification. The same length is also offered as Outdoor Swim Spa WS-130CⅣ, which carries a swim training system in its catalog entry. Where a component is not listed for the reference you quote, tell us whether you want it included; that single sentence changes pumps, control hardware and power load, and therefore the price.

Site Conditions Decide the Structure and the Installation Scope

A vessel close to twelve metres long is rarely a drop-in purchase. Send the mounting situation before asking for a price:

  • Above ground on a slab, deck or plinth, or partly recessed into the ground.
  • The finished external cabinet colour and cladding you expect to see from the terrace.
  • Access routes for delivery, plus whether a crane or long carry across the site is needed.
  • Distance between the spa and the nearest power supply, pump room or plant space.
  • Whether steps, handrails or an automatic cover are wanted, and on which side.

If your layout does not suit a straight rectangular shell, tell us the usable outline instead. Our Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool is made in square, round, oval and curved designs on an acrylic shell with structural reinforcement, so a terrace edge or an awkward corner can be worked around rather than accepted as a limitation.

Water Treatment, Heating and the Options in Scope

Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each item against the selected configuration rather than assuming it fits. For a quotation to be comparable between suppliers, state:

  • Disinfection method: ozone appears in the catalog entry for this reference, with UV sterilization available as an addition.
  • Filtration: the filter pump arrangement you expect, or sand filtration, and who supplies it.
  • Heating: heat pump capacity you want, or the heating source already available on site.
  • Insulation package, which affects running cost where the spa is used outside the warm months.
  • Jet layout preferences, since jet count and position affect pump count and total power.

Where two quotations differ on price, the gap usually sits in one of these five lines. Comparing option by option is more reliable than comparing headline totals.

Electrical Supply and Control: Confirm This Before Ordering

Send the supply available at the installation point: phase, voltage, frequency and the main breaker rating. The catalog total power for WS-130CⅣ-U is 11.85 kW, and every option you add moves that figure, so the electrical information should be shared together with the option list rather than after it. We also need to know who supplies the local distribution board, cabling and protection devices, because those items normally sit with the local contractor while the spa control system is supplied as one set with the unit.

Included equipment and electrical requirements must be confirmed for the selected configuration before order. The figures quoted here come from our catalog entry for this model; your own installation drawing governs the final supply arrangement.

Commercial Details That Let Us Quote in One Pass

Detail to provideWhy it changes the quotation
Quantity and whether spare jets, pumps or LED modules are wantedSpare parts can be produced with the unit and packed in the same container, instead of a separate small shipment later.
Delivery address and delivery terms you expectDetermines freight mode, packaging and container loading plan.
Project stage: concept, tender or ready to orderTender enquiries often need a full option comparison across the range instead of one model price.
Whether the spa is part of a wider packageGrouping with other items from our Swimming Pools and Swim Spas range, or with outdoor furniture and interior fixtures, allows one consolidated shipment.
Target handover dateSets production sequence and whether insulation and cover options can be built in from the start.

How the Order Moves From Quotation to Handover

With the information above in hand, the route is short. Our Our Services workflow runs from consultation and design planning into production, logistics, installation and after-sales. The Custom & OEM Service covers bespoke dimensions, finishes and private labelling where a project calls for them, while Logistics & Door-to-Door Delivery handles freight forwarding by sea, air and rail together with the shipping paperwork. Siting, connection and inspection fall under Installation & After-sales Support, where warranty terms and spare parts are confirmed against the configuration you ordered.

SANTERSON has manufactured furniture and building materials in China since 2008, supplying villa, hospitality and office projects. A swim spa ordered through us travels with the terrace furniture, wall finishes and lighting around it as one coordinated package, which reduces the interface problems that appear when every item is bought from a different vendor.

A Short Checklist Before You Send the Enquiry

  • Model reference as written on the product page, plus any variant you are also considering.
  • Mounting method, access route and the external cabinet finish you want.
  • Option list: sterilization, filtration, heating, insulation, steps, cover.
  • Supply details: phase, voltage, frequency, breaker rating.
  • Quantity, spares, delivery address and expected terms.
  • Project stage and target handover date.

Send the model reference and your site details to PHILLIP on WhatsApp +86-13928214007 or by email at santerson@qq.com, and we will return a configuration sheet listing the confirmed equipment, power load and the price for the delivery address you give us.

The contact page lists business hours of Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8), and says enquiries receive a response within 24 hours. Start from our Contact page.