A swim spa ordered for a villa terrace or a resort pool deck is not a catalogue item you simply pick and ship. The model name, the shell size and the equipment package all have to line up with the site before anything goes into production. This checklist follows the Outdoor Swim Spa WS-115FⅣ as a worked example, so you can see exactly which items belong in the pre-production confirmation sheet and who signs them off.
1. The shell size against the prepared base
Catalogue dimensions are the starting point, not the final number. For WS-115FⅣ the catalogue lists 5000 × 2200 × 1250 mm, while other configurations in the same range differ considerably — the Outdoor Swim Spa WS-115AⅣ is catalogued at 3880 × 2200 × 1250 mm, and the Outdoor Swim Spa WS-130CⅣ at 11830 × 3000 × 1430 mm. Before production starts, confirm three separate measurements with the site team:
- The clear opening in the deck or on the slab, including edge overhang for cladding and access panels.
- The route the shell travels on site — gate width, turning radius, and whether a crane or forklift can reach the final position.
- Bearing capacity of the finished base. Ask the factory for the filled weight of your configuration; the catalogue sheet gives external size only.
Send your dimension drawing back to the factory and get the same numbers in writing on the production order. A mismatch found after the shell is moulded means a new mould; a mismatch found on paper costs nothing but an hour of correspondence.
2. The equipment package, item by item
The WS-115FⅣ page shows one control system, one swim training system, one water pump, one filter pump, 24 jets and four LED lights. Treat that list as the reference configuration and confirm what your order actually contains, because options are quoted separately. The optional accessories listed for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps.
| Item to confirm | What the answer should look like |
| Included vs. optional equipment | A line-by-line list on the proforma invoice, not a phrase such as "fully equipped" |
| Total power and supply | The figure for your chosen package — the catalogue shows 8.05 kW for this configuration — plus voltage, phase and circuit protection required at the site board |
| Heating choice | Heat pump or standard heater, with insulation level stated for the climate the unit will sit in |
| Filtration choice | Cartridge or sand filtration, with service access clearly marked on the site plan |
| Water treatment | Ozone as standard plus UV sterilisation if specified, and the consumable replacement interval |
3. Custom shape and finish when the standard shell does not fit
Where a terrace, courtyard or rooftop cannot accept a rectangular shell, our Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool covers square, round, oval and curved designs on an acrylic shell with structural reinforcement. A related option is the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool, which pairs a long swimming channel with a separate hydrotherapy seating area for terraces and wooden decks. For custom work, lock down the following before the mould is opened:
- A dimensioned drawing with the water depth, seat positions and step position marked.
- Shell colour, exterior cladding colour and the finish sample you approved, referenced by code.
- Jet layout drawing, showing which seats the jets serve and whether the swim training unit stays at one end.
- Which parts are standard tooling and which are new, since only the second group carries extra lead time and tooling cost.
Our Custom & OEM Service covers this stage, including prototyping and material or finish selection, so the specification you sign at sample stage is the one that reaches production.
4. Site preparation and delivery sequence
A swim spa sits at the junction of civil work, electrical work and finishing trades, so the order in which things happen matters as much as the product itself. Confirm:
- The date the base and its waterproofing will be finished, relative to the production completion date.
- Delivery terms — port, dock, or door-to-door on the site address. Our Logistics & Door-to-Door Delivery service covers freight booking, packaging, container loading and customs paperwork; local permits, site preparation and lifting equipment normally remain the buyer's arrangements, so state in the order who supplies each.
- Who unloads and positions the shell, and what access the delivery vehicle has.
- Inspection points before crating: a fill test, jet and lighting function test, and photographs of the completed unit.
5. Commissioning, handover and spare parts
Decide before production who commissions the unit on site. Our Installation & After-sales Support covers installation, inspection and snag lists, warranty coverage and spare parts supply; the exact warranty period, exclusions and response arrangement for your project should be written into the order documents rather than assumed from website copy. Ask also for:
- An operation and maintenance manual in English, with the pump, control system and ozone components identified by model number.
- A spare-parts list with part codes, so a failed jet or light can be replaced without identifying the whole assembly.
- A commissioning record signed at handover, which is what makes a later warranty claim straightforward.
6. What to send us for a quotation
To turn the checklist above into a priced configuration, include: the site plan or terrace photograph with measurements; the shell size you need and whether the unit will be recessed into a deck, raised on a plinth or free-standing; the equipment options from section 2; the local power supply details; and the delivery address with unloading conditions. With those five inputs we can return a configuration drawing and an itemised quotation for the WS-115FⅣ or an alternative model in the range.
A short pre-production checklist
- Shell dimensions matched to the base and the access route, confirmed on drawing.
- Equipment list itemised on the invoice, with power figure for your package.
- Electrical scope boundary agreed in writing.
- Custom shape, colour and jet layout approved by sample or drawing sign-off.
- Delivery terms, unloading responsibility and site readiness dates fixed.
- Commissioning responsibility, manual, spare-parts list and warranty terms documented.
Send us the site plan, the required shell size and the equipment you want, and we will return a configuration drawing with the dimensions, power load and included items marked — so nothing is discovered after production has started. The full swim spa and outdoor spa range is listed in our swimming pool category.
Confirm your configuration before production
SANTERSON has been manufacturing furniture and building materials since 2008, with project work for villas, hotels and offices. Contact PHILLIP on WhatsApp +86-13928214007 or santerson@qq.com to review your swim spa specification, drawings and delivery plan.