Why the Brief Matters More Than the Catalogue
Open modular units — shelving runs with visible bays rather than a wall of closed doors — look simple on a product page: shelves, frames, some storage, a finish sample. On site they are anything but simple. They meet the floor, the ceiling, the wall, the door opening, the lighting circuit and sometimes the television behind the panel. A buyer who sends only a photograph and a colour name usually gets a quotation that looks complete, followed by revisions to the drawings before production can be released.
Before you contact a supplier about open modular units for a villa, apartment or hospitality project, collect the information below. It is the same list our own estimating team works from, and it shortens the distance between first enquiry and confirmed production drawing.
1. Room Dimensions Taken From the Building, Not the Design Drawing
Send wall lengths, room height, and the position of everything that interrupts a straight run: skirting, cornices, radiators, downlights, air-conditioning diffusers, switch plates, door swings and window reveals. Where finished floor levels change between rooms, say so; a modular unit ordered to structural dimensions will not sit correctly on a screed that has not yet been levelled.
- Overall length, height and depth you want the unit to occupy, plus the maximum projection into the room.
- Whether the unit runs floor-to-ceiling or stops below a cornice, and whether the ceiling is level.
- Location of electrical outlets, data points and any existing cabling routes.
- Wall construction: masonry, plasterboard stud or timber frame. Where an existing finished surface must not be drilled, say so at the outset.
Our Modular Living Systems range, including floor to ceiling modular systems, is made to measure for each project, so the dimensions you send become the production dimensions. Approximate measurements produce approximate joinery.
2. How the Unit Will Be Used
Two rooms with identical dimensions can need opposite shelving. A family living room needs closed storage for games, consoles and paperwork; a hotel lounge display wall needs open bays sized for objects that will be handled by guests. Tell the supplier what goes on the shelves and how often it moves.
- Items to store: books, tableware, glassware, media equipment, luggage, linen, decorative objects.
- Shelf span and expected load — long unsupported spans need different substrate thickness than short ones.
- Whether you want open display, closed cabinets, or a mix; the closed modular units page is the counterpart to an all-open layout.
- Child safety, lockable compartments or restricted-access storage in shared and rental settings.
3. Material, Finish and Edge Details You Can Name
"Grey" is not a specification. Give the supplier the substrate, the surface material and the sheen level, and ask what they recommend for the traffic the piece will carry. Open shelving is built-in furniture in most projects, which means it shares materials with the cabinetry, doors and panelling around it; specifying all of them together keeps the grain, sheen and shadow gaps consistent across the job. Where you already have a finish to match — a door, a floor, an existing cabinet — send a physical sample or a photographed reference with the make and colour code.
| Decision | What to specify |
|---|---|
| Substrate | Board type and thickness for carcass, shelves and doors; moisture-resistant grade for wet-adjacent areas. |
| Surface | Lacquer, laminate, veneer or solid timber; sheen level; grain direction on doors and panels. |
| Edges | Matching edge banding, solid timber lipping or exposed substrate on visible shelf fronts. |
| Frames | Metal or timber frame profile, colour and section size — see metal frame modular systems for framed configurations. |
| Hardware | Hinge type, soft close, handle or handleless, push-to-open, drawer runners and load rating. |
4. Lighting and Services Decisions Made Early
Integrated lighting is the most common late change on an open unit. Cabling has to be routed, drivers have to sit somewhere accessible, and a recessed profile changes the shelf depth. Decide before drawings are issued whether the unit carries its own lighting, and share the electrical layout with your electrician at the same time.
- Shelf-mounted, vertical wash or back-panel lighting, and which zones switch together.
- Driver location and access panel — a sealed cabinet without access is a maintenance problem.
- Low-voltage or line-voltage supply, dimming method, and whether the control system is already fixed.
- Media requirements: screen size, cable routing, ventilation for equipment inside closed bays.
Configurations such as modular system with lighting (living system) and integrated lighting systems are specified project by project, so the electrical information belongs in the first enquiry rather than after production starts.
5. Quantities, Programme and Delivery Point
Modular units are repeatable, which is why they suit multi-unit work. Tell the supplier how many identical or mirrored sets you need, and whether rooms differ by a tolerance band that should be surveyed rather than assumed.
- Number of rooms or units, with a schedule showing where each configuration applies.
- Required site delivery date and the latest date drawings can be signed off.
- Delivery address, access constraints, lift size, and whether goods go to site or to a consolidator.
- Import arrangements: Incoterms, who handles customs clearance, and who carries insurance in transit.
As a furniture and building materials supplier, SANTERSON handles freight forwarding, export paperwork and door-to-door delivery, so buyers can place joinery together with flooring, wall panelling, doors, lighting and loose furniture on one programme instead of coordinating several shipments.
6. Drawings, Reference Images and the Survey Question
A dimensioned layout drawing is worth more than ten inspiration photographs. Send elevations if you have them; if not, a hand-measured sketch with numbers is enough to start. Photographs are still useful — they show proportion, styling and how open bays are meant to read — but label what you want from each image: the bay rhythm, the shadow gap, the door detail, or the finish.
State who surveys the openings and when. In refurbished buildings, out-of-plumb walls and uneven floors are normal, and a modular unit is either scribed to the existing condition on site or built off a surveyed template. Confirm which approach your project uses before the carcass is cut.
7. What to Ask the Supplier in Return
A competent supplier replies with questions, not only a price. Use their first response as a qualification test.
- Can they produce shop drawings for your approval before cutting, and who signs them off?
- What is excluded from the quotation — installation, site protection, plinth, scribing, electrical connection?
- How are variations priced once drawings are approved?
- Which finishes are stocked at volume and which are made to order, and how does that affect lead time?
- Who installs, and how are snags and replacement panels handled after handover?
Our own process runs from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up, with OEM furniture manufacturing available where a project needs bespoke dimensions, finishes or branding.
Send your room dimensions, finish references and programme dates to our project team, and we will return shop drawings for an open modular unit configured to your space — sized, finished and delivered as part of a single package with the rest of the interior fit-out.