A submittal is the document package a specifier, main contractor or procurement team reviews before they approve a bathroom fixture for a hotel, villa or apartment project. For a decorative piece such as the Wall Hung Ceramic Basin 1050WC, Luxury Gold Line Wall Mount Sink, the package has to answer two very different questions at once: does it look right in the render, and can the site team actually install it against their existing waste and water connections. Below is the checklist we work to when we prepare a submittal for this basin, written so you can hand it straight to your consultant and ask us to fill in the gaps.
1. Identification: model code, finish and the exact page reference
Start with unambiguous identification. Reviewers reject more submittals over mismatched naming than over anything technical. State the model code as it appears on the product (1050WC), the description used on our site, the glaze and metal-tone finish, and the drawing or schedule tag from your bathroom schedule so the item can be traced line by line.
Because 1050WC is a tall wall-hung basin with a slim vertical body and a gold line accent, note in the submittal which view the photograph shows. A front elevation and a side elevation of a tall basin look very different, and the projection from the finished floor level is what your space planner is checking.
- Model code, product name and finish as ordered
- Project item tag or schedule reference for every bathroom type that uses it
- Quantity by room type, so substitutions in a secondary bathroom are not mistaken for the master-bathroom specification
- The matching Freestanding Pedestal Basin 1050B, Luxury Gold Line Ceramic Stand Basin listed as a companion item where the same suite appears in different room types
2. Dimensional drawing: overall size plus clearances, not just the basin
Include a dimensioned elevation and plan. Our published product page gives an overall size for this model of 410 x 340 x 620 mm, with wall fixing through a back panel; treat that figure as indicative until it is confirmed against the technical sheet issued for your order, because dimensions are the one item that must match the drawing you build from.
Beyond the basin itself, a useful dimensional sheet shows:
- Centre height of the basin above finished floor level, and above substrate if tiling is not yet set out
- Projection from the finished wall face, including the back panel, so recessed niches and vanity returns are checked
- Position and diameter of the pre-drilled faucet hole relative to the basin centreline
- Clear space in front of and beside the basin for circulation and accessibility requirements on your project
- Floor clearance beneath the basin, which matters for cleaning access and for any floor-mounted tapware
3. Rough-in and services: the section that decides whether installation runs smoothly
This is where a wall-hung basin submittal usually stalls. The product is fixed to the wall through its back panel, but the waste, water supply and the supporting structure behind the tiles are your site's responsibility, and they have to be set out before the wall is closed up. Your submittal should carry a rough-in diagram that states:
- Waste outlet centre height and offset from the finished wall face, and the trap arrangement you intend to use
- Whether the waste runs into a wall cavity, a duct or a surface-fixed shroud, with the access panel shown
- Hot and cold supply centre heights and outlets, and whether the supplies are concealed or exposed
- Faucet type and size you plan to fit, since a tall basin changes where the tap sits in relation to the deck
- The substrate behind the basin: blockwork, framed stud with nogging, or a reinforced backing panel, with fixing centres and fastener type
4. Materials and surface: what the glaze has to survive
Describe the body and the surface in terms your operations team will actually use. The basin is made from high-density vitreous ceramic with a glossy glaze that resists staining, yellowing and mineral deposits, which is the property set that matters in guest bathrooms where housekeeping cleans on a fixed routine and limescale is the main cause of dulling.
For hospitality and multifamily projects, add a short care-and-maintenance note to the submittal: approved cleaning agents, products to avoid (abrasive powders, strong acid descalers on the metal-tone line detail), expected cleaning frequency, and the spares position for chips or breakage in high-traffic restrooms. A maintenance section is often what turns a design approval into an operations sign-off.
5. Suite coordination: order the set together, not one piece at a time
1050WC belongs to the 1050 matched sanitary ware collection, which also covers the stand basin and the wall basin in the same gold line detailing, plus the one-piece WC. Submitting the suite as one package means the metal tone, glaze batch and profile language are consistent across every bathroom type on the floor, and it lets you place one production run instead of three.
Where a project mixes room types, show the suite logic in a simple table so the reviewer can see which items pair with which:
| Bathroom type | Typical configuration from the 1050 collection | Submittal item to confirm |
|---|---|---|
| Master or feature bathroom | Tall wall-hung basin as the decorative focus, with floor left clear | Rough-in height, faucet reach, wall backing |
| Secondary or guest bathroom | Wall basin from the same collection in a smaller footprint | Projection and circulation clearance |
| Powder room or boutique restroom | Feature basin with exposed or semi-exposed waste as a design choice | Waste finish, access panel, tapware style |
| WC compartment | Matching one-piece WC from the collection | Trap arrangement and flush-pipework set-out |
6. Fixing method and structural sign-off
Include the fixing detail: back panel reinforcement, fixing centres, fastener type and the minimum substrate density or framing requirement your wall build must meet. Reviewers on framed-wall projects will want a structural note confirming that the basin is not hung on tile adhesive alone, and that the load path runs into the framing or backing panel. If your project has a seismic, wind or public-access requirement, flag it here rather than at the shop-drawing stage.
7. Packaging, delivery sequence and site handling
Ceramic basins with a tall profile are damaged most often in handling, not in service. State the packaging standard, pallet or carton configuration, and the delivery sequence: basins should arrive after wall closure and tiling are complete, but after the rough-in has been inspected and signed off. We handle freight forwarding, export paperwork and door-to-door delivery as part of our Logistics & Door-to-Door Delivery service, so the submittal can also record the delivery term and the receiving party for your site.
8. Commercial terms: what to price together
A complete submittal should be accompanied by a quotation that reflects the whole bathroom package rather than a single line item. Grouping sanitary ware with the vanities, taps, shower systems, tiling and any joinery in the same room usually reduces both cost and variation risk, which is how we normally work on villa and Turnkey Solutions projects. If finishes need to be adjusted to your project palette, our Custom & OEM Service covers bespoke material, finish and texture choices, so record in the submittal whether the specified gold line tone is standard or a project-specific variation.
9. Samples, approvals and the sign-off trail
Attach or commit to: a physical sample of the glaze and metal-line detail, a full-size or 1:1 mock-up where the basin sits against the actual tile, the completed submittal form with reviewer comments closed out, and the as-built record after installation. For multi-unit projects, agree one approved prototype bathroom before volume production, then photograph the setting-out so subsequent floors can be replicated without re-coordination.
10. After-sales record: spares, warranty and replacement
Close the submittal with what happens after handover: warranty scope as issued for your order, spare-parts availability for the collection, and the replacement route if a basin is damaged in service. On hospitality projects we keep the room-type schedule linked to the order, so a replacement request quotes the correct model code rather than a lookalike. Installation and after-sales arrangements are described on our Installation & After-sales Support page; confirm the terms that apply to your site before you publish them in your own documentation.
A short pre-submission check
- Model code, finish and quantity agree with your bathroom schedule on every floor
- Dimensioned drawing shows height, projection, faucet hole and clearances
- Rough-in diagram matches the wall build-up that will actually be built
- Substrate and fixing detail are stated for blockwork or framed walls
- Suite items are submitted together with one consistent finish reference
- Care, spares and delivery sequence are written into the package
Send us your schedule and we will draft the submittal
If you are specifying wall-hung basins for a villa, apartment or boutique hotel fit-out, send us your bathroom schedule and wall build-up and we will return a coordinated setting-out drawing, a technical sheet for the 1050 collection and an itemised quotation as one package. As a China furniture and building materials manufacturer, SANTERSON supplies sanitary ware alongside cabinetry, tiling, lighting and joinery, so the bathroom can be procured against a single set of drawings instead of several separate trades.