A 7-metre swim spa is not a product you can buy from a photograph. Sourcing the Outdoor Swim Spa WS-PC07ST from an overseas manufacturer means agreeing on dimensions, equipment, power supply, transport and site preparation before a single panel is produced. The steps below follow the way we run swim spa orders for villa, resort and estate projects, using this model as the worked example so you can see exactly what to confirm at each stage.

What WS-PC07ST actually delivers

WS-PC07ST sits in our configurable outdoor swim and hydrotherapy range: a long, narrow shell that lets one person swim against a current while others sit at the jet nozzles. The catalogue entry lists a footprint of 7000 x 2400 x 1470 mm, one control system, one swim training system, one filter pump, six jets in total and four LED lights, with a stated total power of 6.55 kW.

Those figures are the starting point of a quotation, not a purchase order. Water pump specification is not listed for this model in our captured catalogue data, which means the pump is defined per configuration rather than fixed across the range. Treat every number on a product page as something to reconfirm in writing against the build you are ordering.

Same shell, different brief. The Outdoor Swim Spa WS-PC07ST-L extends the length to 7490 x 2400 x 1470 mm, while the Outdoor Swim Spa WS-PC07ST-S keeps the 7000 mm shell and adds an automatic cover option. If a covered spa matters to you, compare the S variant before assuming the cover is an add-on to the standard model.

Step 1: Fix the site constraints before you choose equipment

Send your supplier the plan of where the spa will sit. A swim spa this size needs one of three installations: fully above ground on a prepared slab, semi-recessed into a deck, or recessed with access to the plant compartment. Each choice changes the crane or forklift plan, the waterproofing detail and how much working space your installer needs around the shell.

  • Access route. Measure the gate width, turning radius and overhead clearance from the delivery point to the final position. A 7-metre shell cannot be manoeuvred through a standard side gate on most residential sites.
  • Slab and load. Confirm with your structural engineer what a full, wet spa plus occupants means for your slab or deck, and whether the slab needs an embedded anchor or plinth detail.
  • Drainage and plant space. Reserve room next to the shell for the filter pump, control system and any heat pump, with enough clearance for servicing.

Step 2: Specify the equipment line by line

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option should appear as its own priced line on the proforma invoice with a brand or specification reference where one applies.

Two decisions drive most of the running behaviour of the spa:

  • Heating. A heat pump is the usual choice where the spa is used year-round; insulation level matters as much as heater size for standby losses in cooler climates. Tell the factory your ambient winter temperature, not just that you want heated water.
  • Water treatment. Ozone is shown as a feature on this model. If your local authority or project spec calls for UV sterilisation or a specific disinfection regime, request it explicitly rather than assuming ozone covers the requirement.

Step 3: Match the electrical supply to the country of installation

Total power is quoted as 6.55 kW for this configuration. Before production, send your supplier the incoming supply details from your electrician: phase (single or three), voltage, frequency, main breaker rating and the socket or hard-wired connection required. Heated spa equipment ordered with the wrong supply specification is expensive to fix after shipping.

Ask for the wiring diagram, protection requirements and any earthing or bonding notes with your order documentation, and hand them to the local electrician who will carry out the connection. Final wiring must be done by a licensed installer in your region; we supply the equipment documentation, not permission to bypass local rules.

Step 4: Confirm what a factory quote should contain

A swim spa quotation that is ready to compare against other offers states the following. If any item is missing, the offer is not comparable and the gap will surface as a variation later.

Item on the quoteWhy it matters
Model code and shell dimensionsDistinguishes WS-PC07ST from the -L and -S variants so you are comparing the same spa
Equipment list per line, with quantitiesControl system, swim training system, filter pump, jets, LED lights and options are all countable
Total power and supply specificationDetermines whether the unit matches your incoming supply
Packaging method and container typeAffects lifting gear on site and freight cost
Trade terms and delivery addressDecides who pays freight, insurance and import clearance
Spare parts and consumables includedFewer emergency air-freight purchases in the first year of use

Step 5: Freight, customs and delivery to your door

We arrange international freight by sea, air or rail for swim spa orders, along with the commercial invoice, packing list and certificate of origin your broker needs for clearance. For a unit of this size, ocean freight in a shared or full container is normally the practical option, and the delivery address on the contract should be the site itself rather than a port if you want door-to-door service.

Confirm three things with your own broker before the goods move: the import duty and tax treatment for spa equipment in your country, whether an import permit or product registration applies, and who is the importer of record on the paperwork. Freight arrangements are a service we coordinate; the local tax and regulatory position is something you should verify with a licensed agent.

Step 6: Site preparation, installation and handover

Sequence the works so the shell arrives after the slab has cured and the electrical sub-main is in place. On arrival, check the crate for transit damage before the lifting gear leaves site, then unpack against the equipment list from Step 4 and report any shortage on the same day. Commissioning should end with a written handover: water chemistry targets, filter run times, winterisation or insulation steps for your climate, and the contact route for spare parts.

Our installation and after-sales support covers on-site installation guidance, inspection of snags, warranty handling and spare parts supply. Warranty terms and response arrangements differ by project type and region, so ask for the written terms that apply to your order rather than relying on a general statement.

Buying alongside the rest of the project

Most swim spa orders are not standalone. On villa and resort projects the spa shell has to align with the surrounding decking, outdoor furniture, poolside lighting and changing areas. Coordinating those items with one supplier reduces the number of parties arguing over interface details on site. Our turnkey solutions cover design coordination, production and door-to-door delivery across furniture and building materials, and the wider swim spa and swimming pool range includes shorter and longer shells if the 7-metre format does not suit your plot.

A short pre-order checklist

  • Installation type agreed: above ground, semi-recessed or recessed, with slab detail signed off by your engineer
  • Model variant confirmed against plot length: standard, -L long shell or -S with automatic cover option
  • Equipment list priced line by line, including heat pump, insulation, steps and treatment system
  • Supply specification in writing: phase, voltage, frequency, breaker rating, wiring diagram
  • Trade terms, delivery address and importer of record named on the contract
  • Lifting gear booked for the access route you measured, not the one assumed
  • Written warranty, spare parts list and commissioning handover attached to the order

Send us your site plan, preferred model code and incoming supply details, and we will return a configuration drawing with an itemised quotation for WS-PC07ST or the variant that fits. Enquiries are handled by PHILLIP, phone and WhatsApp +86-13928214007, email santerson@qq.com, or through our contact page.