A swim spa is rarely a single line item on a project bill of quantities. Around one shell sit pumps, treatment equipment, power, insulation, access and the surrounding deck. This guide uses the Outdoor Swim Spa WS-S38 to show how buyers, contractors and villa owners can break the package down into quantities they can actually price, order and install.

Most enquiries we receive start with a question about the shell: what size, how many jets, how much power. That is the wrong place to begin. The shell is fixed early; everything else follows from it. Work outward from the shell and the quantity list writes itself.

1. Start with the footprint, not the model number

The WS-S38 is listed at 3760 × 2080 × 1110 mm. Treat those figures as the manufactured shell, and add clearance on every side before you draw the site plan:

  • Access route. The unit has to travel from the delivery vehicle to its final position. Measure gates, side passages and any turn, then compare with the shell length of 3760 mm plus packaging.
  • Service side. Leave working space where the pumps, filter pump and control system sit. A technician needs room to remove a pump without lifting the spa.
  • Water feature side. The waterfall discharges over an edge. Confirm where that water lands and what sits below it.
  • Entry. Steps are listed as an option in the catalogue. Their footprint goes on the plan before the deck is set out, not after.

A useful habit on site: dimension the excavation or slab to the shell plus your clearance allowance, and only then confirm the model. Buyers who choose the model first often end up with a pit that fits the shell exactly and leaves no room for the filter pump.

2. Read the equipment list as separate order lines

The specification published for this model is not one number to be quoted as a lump sum. Broken out, it looks like this:

Item shown in the catalogueCatalogue figureWhat you confirm before ordering
Overall dimensions3760 × 2080 × 1110 mmDelivery route, slab or pit size, clearance for service access
Water pump3 pcsWhich pumps drive jets and which drive the water columns
Filter pump1 pcRun length to the filter, whether sand filtration is added
Jets51 pcs, plus 6 water columnsJet layout against seating positions you actually intend to use
LED lighting4 pcs, plus 12 small LED lightsFixture positions and low-voltage supply for each circuit
Control system1 setMounting location, distance from the water line
Total power14.05 kWSupply capacity at the panel, cable size, protection device
Features shownWater jets, LED lighting, Ozone, WaterfallWhich of these are in your configuration and which are options

Catalogue figures describe the standard configuration for this model. Options, included equipment and electrical requirements vary by configuration, so confirm them in writing against your order rather than assuming the published list applies unchanged.

3. Quantity planning: what to count on each side of the shell

The spa side (supplied with the unit or as options)

  • Control system, water pumps and filter pump as per the selected configuration.
  • Ozone as a standard feature on this model; UV sterilisation appears in the option list. Choose one treatment route and specify it once, not both by default.
  • Sand filtration, heat pump, insulation and steps are all catalogue options. Each is its own line item with its own lead time.

The site side (supplied locally, and the part most often under-quantified)

  • Electrical: dedicated supply sized against the total power figure, correctly rated protection, cable runs to the control system and to each lighting circuit.
  • Structural: slab reinforcement or a perimeter pit wall sized for a full shell of water; drainage at the low point near the equipment.
  • Finishes: decking, coping and any wall cladding that meets the water edge. If your project also specifies aluminium honeycomb panel for exterior and interior cladding, order it to the measured perimeter after the spa position is set out, not from a drawing.
  • Waterproofing and drainage in the plant area, where small leaks are noticed late.

A practical rule for bills of quantities: list everything supplied by the factory as one package with its configuration sheet attached, then list site works separately. When the two lists stay apart, nobody is left guessing who owns the cable between the panel and the control system.

4. Coordinating the swim spa with the rest of the outdoor package

The pool rarely arrives alone. On villa and resort projects it lands in the same container programme as loungers, shade structures and a dining set, and those items decide how much hard landscape you build.

This is where a single supplier earns their place. When the spa, outdoor furniture, cladding, bathroom fixtures and cabinetry all come from SANTERSON furniture and building materials, one production schedule covers them and one container plan moves them.

5. Ordering sequence that avoids rework

  1. Fix the layout. Confirm spa position, orientation of the waterfall and jets, and which side holds the equipment.
  2. Confirm the configuration. Write down pumps, treatment, heat pump, insulation, steps and lighting exactly as you want them. Anything not written down is not ordered.
  3. Issue the electrical requirement early. Total power drives cable size and panel capacity, and electricians work to a long lead time on site.
  4. Order site finishes after setting out. Decking, coping and cladding quantities come from measured dimensions around the delivered shell.
  5. Group the shipment. The spa plus outdoor furniture and interior fixtures travel together where possible; see logistics and door-to-door delivery.
  6. Plan installation as one event. Setting the shell, connecting power, testing jets and lighting, then finishing the surround. Site visits are cheaper when they happen once; installation and after-sales support covers inspection and snags at that point.

6. When WS-S38 is not the right model

Quantity planning also means recognising when the shell you enquired about should change. Compare against other models in the range rather than forcing a site to fit a product:

The trade-off is straightforward: a longer shell needs a wider access route and a larger structural base; more jets and more lighting mean more circuits to pull and test. Neither is difficult on its own. Both become expensive when discovered after the slab is poured.

7. A short checklist before you raise the purchase order

  • Delivery route measured against shell length, width and height, including packaging.
  • Configuration sheet signed: pumps, filter, jets and water columns, lighting, ozone or UV, heat pump, insulation, steps.
  • Total power confirmed against available supply; protection device and cable specified.
  • Service clearance reserved on the equipment side, with drainage at the low point.
  • Decking, coping and cladding ordered to measured dimensions after setting out.
  • Ancillary items — loungers, pergola, outdoor dining, bathroom fixtures — placed in the same production and shipping plan.
  • Installation window agreed once, covering placement, connection, testing and snag list.

Get the shell position and the configuration right on paper, and the rest of the quantity list follows without surprises. Get them wrong, and every trade after the first one absorbs the cost.

Send us your layout and equipment list

Share the site dimensions, the configuration you want for the WS-S38 or another model in the range, and the outdoor and interior items you plan to order alongside it. We will confirm the specification, quantities and a combined shipping plan through our one-stop solution service — contact us to start.