A single curved feature wall can decide the look of a hotel lobby or a villa living room, and that is exactly where a flexible wood grain cement wall panel earns its place: it carries a realistic timber figure on a bendable, mineral-based sheet that wraps arches, columns and radius walls rigid boards cannot touch. Because the same panel can also be used outdoors, buyers rarely stop at one wall — they clad a facade, a reception desk front and a series of guest-room headboard panels in one order. That is why our quotation process asks for more than a surface area.

Why Project Buyers Choose This Panel

The panel is moulded with a lifelike wood grain on the face while keeping the behaviour of a cement-based sheet. The combination solves three recurring problems at once:

  • Curvature. Rigid boards snap or need a substrate frame when a wall curves. A bendable sheet is rolled out and fixed directly onto arches, cylinders and special-shaped structures.
  • Fire and moisture. Timber-look cladding in a public corridor or a spa raises both questions at once; a non-combustible, water- and moisture-resistant mineral panel answers them without the movement and maintenance of real timber.
  • Freight. The sheets can be rolled for packaging and delivery, which cuts volume and damage risk on long sea legs — a material factor when cladding is going to Australia, the Gulf or Europe.

On site the material is worked with ordinary tools: cutting, drilling and bending. The raw white surface can be painted to a project colour when a specified timber tone is not in the range. For projects that want a stone figure instead of timber, the same bendable logic applies to our MCM flexible rammed earth panel, which is fixed with tile adhesive over a cement base or gypsum board.

What We Need From You to Quote Accurately

Send these items and we can return a priced proposal rather than a rough estimate. Anything you leave out comes back as a question, so the more complete the brief, the faster the quotation.

InformationWhy it changes the price
Application — interior wall, exterior facade, renovation overlay, curved feature wallInterior and exterior exposure set different fixing systems, edge details and surface treatment.
Measured area by elevation, plus a drawing or marked-up photosPricing follows panel area and cutting loss, not floor area. Elevations let us separate flat runs from curved runs.
Radii of curves, arches and columnsBend radius determines which thickness and format can be used and how the joints are detailed.
Substrate condition — new build or cladding over an existing wallRenovation projects may need levelling or a new base board before the panels go on.
Surface finish — natural wood grain tone, or painted to a project colourPigmented and sealed finishes cost differently from the raw white surface.
Quantity and phasingPanel price, packing and container loading all move with volume; phased delivery for multi-tower projects is arranged at quotation stage.
Destination port or site, and who handles import clearancePackaging, container loading and freight terms differ between port delivery and door-to-door delivery.
Target installation dateProduction slots and shipping routes are planned backwards from the on-site programme.

Drawings in DWG or PDF are ideal, but photographs of the wall with dimensions written on them are enough to start. If you have a finish sample, a mood board or a reference photo, send it — matching a wood grain tone is far easier against an image than against a written description.

How the Quotation Is Handled

The enquiry follows the same path as our other custom work, from wall panel systems to cabinetry:

  1. Brief and material selection. We confirm the application, review your drawings and agree the panel format, grain and finish. Where a project mixes timber-look and stone-look cladding, we specify which product goes where so fire-rated and wet areas are handled correctly.
  2. Sampling before commitment. A physical sample of the selected grain is sent for approval. Photographs of a wood grain never match a sheet in the hand under site lighting, so we treat this step as mandatory for commercial orders.
  3. Quotation and detail confirmation. You receive an itemised offer covering panels, cut pieces for corners and reveals, fixing materials where required, packing, and the agreed freight terms. Technical details — joints, expansion at external corners, skirting interface — are confirmed at this stage, not after production starts.
  4. Production and inspection. Panels are produced to the approved sample and checked against the order before packing. Rolled sheets are packed for long-haul handling rather than retail display.
  5. Shipping and handover. We arrange freight forwarding with the paperwork your customs broker needs, and we stay available through installation. Our logistics and door-to-door delivery service covers packaging, container loading and shipment tracking; on-site guidance is arranged for projects that need it.
Order a little over the measured area. Curved runs, arches and reveals generate offcuts, and a top-up batch ordered months later may not match the grain and tone of the first production run.

Questions Buyers Ask Before Ordering

Can one order cover both interior and exterior walls?

Yes, with different specifications. The same flexible panel range is used for interior decoration and exterior facade cladding; what changes is the thickness, surface treatment and fixing detail. Tell us both applications in the enquiry and we will quote them as separate line items so nothing is specified wrongly on site.

Do you supply fixing materials?

Adhesive and substrate requirements are set out in the quotation once we know the base wall. Local availability of adhesives varies by destination, so we confirm what ships with the panels and what is best sourced locally.

What is the minimum order?

Minimum quantities are flexible across our custom and OEM work, but they depend on format and finish. A villa feature wall and a hotel floor of cladding are quoted differently, so send the area and we will confirm.

Can you match a wood grain from an existing sample?

Send the sample or a reference image. We compare it against the available grains and tell you honestly whether it is a close match or an approximation — better to know at quotation stage than after installation.

Request Your Quotation

Send drawings, measured areas and photographs of the walls you intend to clad, together with your destination port or site address. We return a priced proposal with panel specification, packing detail and freight terms once the brief is complete.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com
Factory and office: Longjiang, Shunde, Foshan, Guangdong, China  |  Enquiry page