A two-tone kitchen scheme looks simple on a mood board and complicated on site. The aluminium frame, the infill panel, the colour break between the two tones and the appliance cavities all meet at the same reveal, so the installation plan is where the design either holds together or falls apart. Below is the checklist we work through before any two tone aluminum frame cabinets leave the factory, written for contractors, project managers and homeowners who want the fit-out to go smoothly on delivery day.

Why aluminium-framed cabinetry needs its own installation plan

Aluminium frame kitchen cabinets behave differently from all-timber carcasses. The profile is slim, the doors and drawer fronts are hung on a metal substructure, and glass or solid infill panels sit in a channel rather than being screwed to a box. That gives you the crisp shadow gaps and narrow sightlines people choose two-tone aluminium for, but it also means the wall, the floor and the frame have to be brought into line before the units go up. A timber carcass can absorb a few millimetres of out-of-plumb wall with packing pieces; an aluminium frame with a glass front will show every millimetre as a tapering gap along the reveal.

The two-tone detail adds a second requirement: where one finish ends and the other begins. If the plan does not state which cabinet carries which colour, at what height the break falls and how the transition is trimmed, you get installers making that decision on site with a tape measure, and the result never matches the drawing.

Section 1: Survey data that has to be captured before ordering

Everything downstream depends on the survey. Ask your supplier for a dimensioned layout drawing, not just an elevation image, and check it against these items:

  • Floor level and finished floor height. Record levels at each corner of the run. Aluminium frames are adjusted through levelling feet within a limited range, so a sloping slab needs to be corrected before installation, not during it.
  • Wall plumb and square. Note which walls are out of plumb and by how much, because this determines whether you scribe the end cabinet or build a boxing wall.
  • Ceiling height and any bulkhead. Tall units that run to the ceiling need a stated head detail and a clear dimension under the bulkhead.
  • Services positions. Mark water, waste, gas, power outlets and switch locations with dimensions from two fixed reference walls. Cabinet panels are cut on site only where the plan allows it.
  • Door and window openings. Swing direction and handle projection affect adjacent cabinet doors and drawer pull-out clearance.
  • Appliance schedule. Model numbers for built-in oven, cooktop, dishwasher, refrigerator and any wine cabinet, so the cavity sizes are fixed at production.

Our aluminium frame cabinets with solid panel infill and the glass-front versions in the same collection are made to measure against a drawing like this, so the survey is the document that carries the whole job.

Section 2: The two-tone specification itself

The plan should describe the colour split in buildable terms. A written schedule avoids the argument later about what was agreed.

Item to fix in the planWhat a clear answer looks like
Tone assignmentWhich run is the darker tone and which is the lighter — for example tall units and wall units in one finish, base units in another.
Break heightThe exact finished height of the horizontal colour break, stated from the finished floor level, not from the sub-floor.
Frame finish versus panel finishWhether the aluminium profile matches the door colour or is a contrasting tone. This is the detail that makes or breaks a two-tone look.
Glass type where usedClear, frosted or smoked glass in the display cabinets, and whether the interior back panel matches the cabinet body.
Transition detailHow the two tones meet: a butt joint, an aluminium trim profile, or a change of plane at a return.
HardwareHandle style and finish per tone, or integrated pull profiles, with one approved sample signed off before production.
Interior finishCarcase and shelf colour, including whether the inside of a glass-front cabinet is lined in the darker or lighter tone.

Where display cabinets are part of the scheme, decide at the same time whether they carry internal lighting and where the driver sits. A glass front aluminium frame cabinet with LED strips needs a power position behind or above that unit, and that position has to be in the electrical plan before first fix.

Section 3: Interface drawings and the services plan

The installation plan is not only about cabinets. It has to show what the trades on site are meant to leave behind for the joinery.

  • Benchtop and splashback setout. Benchtop thickness, edge profile and whether the splashback returns into a reveal all change the base unit height and the wall unit datum.
  • Sink and mixer position, with waste size and whether a water filter or boiling tap is required, since these need cabinet penetrations and a power point inside the base unit.
  • Electrical positions for built-in appliances, internal lighting and counter-level outlets, dimensioned from the same datum as the joinery drawing.
  • Splashback material, whether stone, tile or glass, and who supplies and fixes it.
  • Flooring threshold detail at the kick board line, so the run starts on a finished floor rather than being packed up later. If engineered wood flooring is being laid in the kitchen, confirm whether it runs under the cabinets or stops at the perimeter, because that decision changes both the floor quantity and the cabinet base height.

Agree one datum line across all drawings — usually the finished floor level of the kitchen — and make every drawing reference it. This single step removes most of the measurement disputes that delay handover.

Section 4: Sequence, access and delivery

Write the installation sequence into the plan in the order the site will actually work:

  1. Site preparation complete: slab corrected, walls plastered and painted to the first coat, services roughed-in and tested.
  2. Delivery and goods inspection against the packing list, checking panel colours and glass against the approved sample while the packaging is still open.
  3. Storage inside a dry, covered area, off the floor, with doors flat and glass panels upright and protected.
  4. Frame installation and levelling, starting from the longest run and working toward the scribed ends.
  5. Carcass, drawer runners and shelf fixing, then appliance fitment.
  6. Doors, glass infill panels and hardware, followed by adjustment of every hinge and runner.
  7. Benchtop and splashback installation, then internal lighting connection.
  8. Final clean, snag list and handover sign-off.

Also record the practical site constraints: lift or stair dimensions for long panels, parking and unloading point, protection of completed finishes nearby, and which day each trade is expected. For an overseas-supplied project these lines matter even more, because a missing component cannot be replaced from a shop around the corner. Ask your supplier what arrives pre-assembled and what is flat-packed; a frame that ships knocked down needs a different crew time than one that arrives assembled.

Section 5: Tolerances, adjustment range and handover

State the tolerances explicitly so everyone knows what "acceptable" means before the punch list starts.

  • Levelling range of the feet, and at what deviation a slab correction becomes necessary instead.
  • Reveal width between doors, with an agreed maximum variation across the run.
  • Scribed end allowance, normally held at one or both ends of a run rather than distributed along it.
  • Glass panel seating in the channel, and who inspects it after the frames are levelled.
  • Door alignment after settlement, with a re-adjustment visit scheduled after the site has been in use for a period.

Close the plan with a handover pack: the approved elevation drawing, the finish schedule, the appliance list, the care instructions for the panel surfaces and hardware, and a spare-parts list covering hinges, runners, handles and any replaceable glass panel. A homeowner or facilities manager who has that pack can maintain the kitchen without calling the supplier for every small item.

If you are pricing a project: send us the room dimensions, your appliance schedule and the two finishes you have in mind, and we will return a dimensioned layout for two tone aluminum frame cabinets with the colour break, glass options and internal storage set out on paper before production begins.

SANTERSON manufactures aluminium frame kitchen cabinetry along with the rest of the fit-out package — wardrobes, bathroom ceramics, lighting, flooring and wall finishes — so a single set of drawings can carry the whole project from production through to installation and after-sales support. Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com, to discuss a kitchen or apartment project.