A design brief for a villa terrace, a resort pool deck or a private wellness garden usually arrives at the supplier as a mood board, a plan drawing and one sentence: "we want an outdoor swim spa here." The gap between that sentence and a priced, buildable quotation is where most project delays start. Below is the practical sequence we use to move a brief for the Outdoor Swim Spa WS-S04 into a firm enquiry, written so that architects, contractors and procurement officers can prepare their information before first contact.

1. Start with the site condition, not the model number

Model selection is the last step, not the first. Before anyone asks "which spa fits," the brief needs four site facts: the clear opening where the vessel will sit, whether the spa is to be recessed, semi-recessed or raised on a deck, who supplies and pours the structural support, and how many people are expected to use it at one time.

For reference, the published catalogue envelope for WS-S04 is 4090 × 2200 × 1110 mm. Treat that as a starting dimension for setting-out drawings, and confirm the final shell size against the configuration you select before any concrete is poured or any decking is cut. Allow working clearance around the vessel for access panels, filtration service and the steps.

2. Send us what you already have

The fastest enquiries are the ones that arrive with material attached. A short email carrying the following is usually enough for our team to return a first proposal rather than a list of questions:

  • The landscape or architectural drawing showing the intended location, with dimensions marked.
  • A note on installation type: recessed into a deck, semi-recessed, or above ground with steps.
  • The project context — private villa, hotel or resort guest room, clubhouse, gym, apartment amenity level.
  • Target completion date and the stage your project is currently at.
  • Any finish preferences for the surrounding area, since swim spas are frequently specified alongside outdoor furniture, pergolas and poolside loungers.

If you do not have drawings yet, tell us the available footprint in millimetres and the intended use. We can work from that through design consultation and space planning as part of our turnkey project service.

3. What the WS-S04 specification sheet covers

Once the site condition is clear, we work through the published specification with you line by line. The catalogue entry for this model lists the following:

ItemCatalogue figure
ModelWS-S04
Catalogue dimensions4090 × 2200 × 1110 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jet total26 pcs, including 4 water columns
LED lighting3 pcs plus 18 small LED lights
Total power8.25 kW
Features shownWater jets, LED lighting, Ozone, Waterfall

Two entries on that sheet deserve attention before you sign off a drawing. A swim training system is not listed for this configuration, so if lap swimming or resistance current is part of the programme, raise it at the enquiry stage and we will advise which model in the range carries that equipment. And total power of 8.25 kW is a catalogue figure for the standard build — the electrical supply your site provides must be confirmed against the final configuration by your electrician, together with local wiring rules and protection requirements.

4. Decide options before you ask for a price

Quotations come back inconsistent when option lists are left open. The catalogue options associated with this range include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each one changes both the price and the plant space you need to plan for.

A useful way to decide is by duty cycle. A spa used year-round in a cooler climate usually needs a heat pump and insulation specified from the start rather than added later. A spa in a shared hospitality setting usually needs water treatment and filtration sized for higher bather load. A spa on an upper level or terrace needs the insulation and access arrangement considered together with the structural engineer. Tell us how the spa will actually be used and we will recommend which options belong in the quotation.

Availability and compatibility of optional accessories vary by model. Every item on the specification sheet should be re-confirmed for your selected configuration at order stage — including included equipment, electrical requirements and any option you have added.

5. What we return, and in what order

After receiving your brief, the sequence follows our standard project workflow: consultation, design and planning, production, logistics, installation and after-sales. In practice for a swim spa enquiry this means:

  • A configuration proposal with the specification sheet completed against your stated use.
  • A quotation covering the selected unit and options, with anything still open clearly marked.
  • Detail confirmation before production begins, so setting-out dimensions reach your site team in time.
  • Packaging, container loading and freight arranged through our logistics and door-to-door delivery service, with the customs paperwork handled on our side.
  • Site guidance at handover, with inspection and snag lists raised before you sign off.

Because we work as a single furniture and building materials supplier, the same enquiry can also carry the surrounding scope — poolside loungers and dining sets, pergolas and shade structures, changing-room cabinetry, wall finishes and lighting. Coordinating that in one specification round removes the interface problems that appear when several suppliers each hold part of the pool deck.

6. Common reasons an enquiry stalls

  • Dimensions taken as fixed. Catalogue dimensions are a starting point for setting out; the confirmed configuration governs.
  • Electrical provision left to the end. Supply capacity and protection need confirming against the final build, not the brochure figure.
  • Options quoted twice. Where a heat pump or filtration item is already in one package, adding it again at a later round creates price discrepancies nobody can reconcile.
  • No access route identified. Delivery to a rooftop terrace or an enclosed courtyard changes rigging and phasing; mention it early.

Ready to send the brief?

Send the drawing, the footprint in millimetres, the installation type and the intended duty cycle. If you would like to compare WS-S04 against other sizes and configurations in the swim and hydrotherapy range first, browse the product catalogue or contact our project team directly.

Talk to a project specialist

SANTERSON has supplied furniture and building materials for villa, hospitality and office projects since 2008, with manufacturing, custom/OEM work, freight and site coordination handled under one contract. Send your swim spa brief through our contact page and we will come back with a configuration proposal and quotation.