A mixed open and closed wall unit looks simple on a mood board and is one of the easiest items to get wrong in production. The shelf that was meant to display a vase ends up hiding it behind a support panel; the closed cabinet that was meant to swallow clutter arrives with doors that clash with the joinery around it. If you are specifying Santerson Mixed Open & Closed Systems for a villa, apartment or hospitality fit-out, the quality of your brief decides most of the outcome. Here is what a manufacturer actually needs from you before drawing a single panel.
Start With What the Unit Has to Do, Not What It Looks Like
Send a written function statement before any reference image. Two rooms can carry the same elevation and need completely different internals: a living room wall that houses a soundbar, consoles and a tangle of cables is a very different build from a corridor wall carrying linen and spare hardware. In our work on villa projects in Sydney, Melbourne and Perth, the revisions that arrive after production starts almost always trace back to a brief that described appearance only.
Write down four things for each room:
- The users. A family with children needs soft-close hardware and closed volume at low levels; a guest room or serviced apartment can lean more on open display.
- The inventory. List the tallest, deepest and heaviest items the unit must swallow. Shelf heights follow from that list, not from a standard grid.
- The equipment. Television size, mounting type, speaker positions, set-top boxes, and where every power point and HDMI run has to land.
- The keep-in-view decision. Which items stay on display permanently, and which must be out of sight within one second.
Give the Proportion of Open to Closed as a Number
"Mostly closed with some styling niches" means different things to different people. State the split by front elevation area, and give the reason for it. A useful way to write it: 60 per cent closed, 40 per cent open, with all open bays above 900 mm so small children cannot pull items down.
Then say which of your two collections the unit sits in. Santerson lists mixed configurations in more than one family, and they are not interchangeable:
| Collection | Where it fits | What you specify |
|---|---|---|
| Mixed Open & Closed Systems (Modular Living Systems) | Living and family rooms, media and lounge walls built from modular bays | Bay widths, open shelving bays, closed cabinet bays, overall layout for the space |
| Mixed Open & Closed Storage (Integrated Storage Walls) | Full-wall builds where storage, display niches and media sit in one continuous plane | Niche positions, closed runs, integration with Full Height Storage Walls |
| Floor to Ceiling Modular Systems | Rooms where the unit must resolve a ceiling height, an awkward bulkhead or a raking soffit | Floor and ceiling levels, set-down dimensions, scribe detail |
| Floating Modular Systems | Lighter compositions off the floor, common in bedrooms and media walls with a clear plinth line | Fixed height above floor, wall construction and fixing substrate, load expectation |
Naming the family in your brief stops the workshop from pricing one build while you are picturing another. If you have not decided, say so explicitly and ask for both options quoted.
Send Dimensions That a Workshop Can Build From
These systems are made to measure, so the drawing set matters more than the style reference. A brief that will not need a second round of questions includes:
- Overall run length and height at high level, low level and each end, taken on site rather than from a scaled plan
- Floor and ceiling finish build-ups, so the unit is drawn to finished levels and not structural ones
- Positions of skirting, architraves, bulkheads, downlights and air diffusers that the carcass must clear or cut into
- Adjacent door and drawer swings, including the appliance or wardrobe door that will collide with a cabinet at 90 degrees
- Wall construction behind the unit: stud type, bracing, tile or stone build-up, and whether anything above 25 kg can be fixed to it
- A photo set of the wall from both ends and straight on, with a tape visible in one frame
Specify Materials and Finish Against the Room's Real Conditions
Material and finish options are part of the configuration, and the brief should say which surface is being asked to survive what. For each material decision, name the exposure:
- Sun: which faces of the unit receive direct afternoon light, and for how many hours. Ask for the finish sample to be assessed for that elevation before sign-off.
- Moisture: any wall shared with a wet area, laundry or an external wall in a coastal climate needs a different board and edge treatment than an internal partition.
- Handling: high-traffic hospitality and rental units need handleless or recessed-pull doors in a finish that hides fingerprints; a private bedroom can carry a higher-sheen surface.
- Matching: if the unit must read as one with other built-in furniture on the same floor, send the existing sample and the reference of the cabinetry it has to match, not a photograph.
Send physical finish samples or request them for the specific elevation in question. Colour and sheen read differently on a 20 mm edge than on a 600 mm field, and that is where disputes start.
Decide Internals and Lighting Before Quotation
Internals are the most commonly value-engineered item, so lock them in writing. State shelf spans and expected load, drawer versus door for each closed bay, soft-close requirement, and any dedicated compartments such as vacuum storage, ironing nooks or charging drawers.
Lighting has to be in the brief at the same time, because it changes carcass depth, back panel material and cable routing. Where shelving is lit, specify Modular System with Lighting in the same configuration sheet, and give the electrician's switching intention: sensor, door-activated, or wall switch. For lit cabinets elsewhere in the project, Integrated Cabinet Lighting should be coordinated with the cabinetry rather than added after handover.
Ask for the electrical specification of any lit configuration in writing — driver location, access panel, wattage and switching — and confirm it against your local electrician's requirements before approval. Do not assume a lighting detail carries a rating for a wet or outdoor location unless the product page states it.
Set Out the Process You Expect
Santerson works these systems through design and planning, production, logistics and installation, so the brief should say where you need support and where your own team has it covered. If you have an interior designer on site, ask for shop drawings and a production coordination stage rather than a catalogue selection; if you do not, use the interior design service for space planning, layout and 3D renderings before anything is cut. Where you are buying several categories from one factory — joinery alongside flooring, wall panelling or lighting — say so at the start, because a single production and delivery programme is easier to coordinate than five separate ones. Confirm freight terms, packaging, container loading and who receives the goods on site before the order is placed.
A Five-Minute Check Before You Send
- Function statement written in words, not only images
- Open-to-closed split stated as a percentage with the reason
- Collection family named, or both options requested for quotation
- On-site dimensions to finished levels, with obstacles marked
- Finish decisions tied to sun, moisture and handling exposure
- Internals, loads and lighting switching specified
- Delivery, installation and after-sales responsibilities assigned by name
Send that and the workshop can price and draw with confidence. If you are still shaping the layout, start from the Mixed Open & Closed Systems product page, note the configuration options listed there, and bring the gaps in your brief to the conversation as questions rather than assumptions.