A swim spa quote is easy to compare on one number and hard to compare on the things that actually decide the project cost. Two quotations for a long-shell spa can look identical at the headline price while differing in shell length, jet count, heater type, filtration method and what stops at the factory gate. Before you sign anything for an Outdoor Swim Spa WS-130CIII, walk through the line items below and make sure every commercial and technical assumption is written down, not assumed.
Start with the shell, not the price
The WS-130CIII sits at the long end of the configurable outdoor swim and hydrotherapy range. The published catalogue lists this model at 11830 × 3000 × 1430 mm, with a control system, a swim training system, one water pump, one filter pump, 20 jets, seven LED lights and a total power figure of 10.85 kW. Treat those figures as the reference point for your quote: if the number in front of you carries the same model code but a shorter shell, fewer jets or no swim training unit, you are not comparing the same product.
Ask the supplier to restate the dimensions in millimetres, length by width by depth, and to confirm whether depth is measured to the coping or to the seating deck. A 1430 mm shell with a shallow bench seat behaves differently from the same shell with a deep lounge position, and that difference shows up in how many people can actually use the spa at once.
Read the equipment list as a specification, not marketing copy
The catalogue entry for this model lists water jets, LED lighting, ozone and a swim training system among the features shown, and it also states that included equipment and electrical requirements must be confirmed for the selected configuration. That instruction is the most important line in the whole product record. A quote that says "fully equipped" tells you nothing; a quote that lists each item does.
| Line item | What the quote must state |
|---|---|
| Jet package | Total jet count, jet types and zoning, so hydrotherapy sessions can be adjusted rather than being all-or-nothing. |
| Swim training system | Whether the swim unit is included on this configuration, its nozzle arrangement and how flow is adjusted. |
| Pumps | Water pump and filter pump quantities and ratings, plus which pump drives the jets and which drives circulation. |
| Water treatment | Ozone as listed, and whether UV sterilisation is included or offered as an option. |
| Filtration | Whether the standard filter pump arrangement is used or sand filtration is quoted instead, and how often media is replaced. |
| Heating | Whether a heat pump is part of the package or priced separately, and what insulation comes with it. |
| Lighting | Number and position of LED fittings, and whether control is integrated with the spa controller. |
| Control system | One set as listed: confirm the interface type, mounting location and language of the display. |
| Access | Whether steps are supplied, and their orientation relative to the shell on site. |
Options such as control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps appear across the range, but availability and compatibility vary by model. Anything you want must appear in the quotation with a price next to it, or it will not arrive in the crate.
Electrical scope is where budgets quietly grow
A total power figure of 10.85 kW is a machine rating, not an installation plan. Before you accept the quote, get written answers to four questions: what supply voltage and phase the unit expects; what circuit protection and dedicated isolation the site must provide; whether the cable run from the distribution board to the spa is inside the supplier's scope or the local contractor's; and who signs off the connection.
The same question applies to grounding, bonding and local wiring rules at the destination country. Those requirements sit with your local electrical contractor and building authority, and a supplier quotation should not be read as confirmation that a configuration complies with them. Put the boundary in writing early: it is far cheaper to draw a red line on a drawing than to move a distribution board after excavation.
Site preparation and foundation responsibility
A spa of this length carries a full water load, so the base it sits on is a structural question rather than a landscaping preference. Check whether the quotation assumes a level reinforced slab, a plinth or a partially recessed installation, and whether access for craning or lifting the shell to the position is included.
- Confirm the finished level and drainage falls around the shell, so surface water moves away from the equipment compartment.
- Confirm clearance for the control system and filter pump for routine servicing, not just for installation day.
- Confirm whether insulation is quoted for the shell and base; in cooler climates this changes running cost more than most buyers expect.
Commercial terms that change the real landed cost
For a cross-border project, the product price is only part of the number. The services around it are documented on the logistics and door-to-door delivery page, which describes freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Use that scope as your checklist and make the quotation state each piece explicitly.
- Delivery term: which Incoterm applies, where risk transfers, and whether the quoted price ends at the port or at the project address.
- Packaging and loading: how the shell is protected for the voyage and how it will be lifted off the truck on site.
- Documents: commercial invoice, packing list and any certificate of origin needed for import clearance in your country.
- Duties and taxes: who pays import duty, customs handling and local tax, and at which point in the payment schedule.
- Cargo insurance: whether it is included, on what basis, and who files a claim if damage appears on arrival.
- Payment schedule: deposit, milestone before shipment, and any balance held until delivery or commissioning.
Customisation, MOQ and configuration changes
Where a project needs a non-standard arrangement, ask for the change to be quoted as a revision with drawings, not agreed verbally in an email thread. The custom and OEM service page covers bespoke design and prototyping, material and finish selection, OEM manufacturing and flexible minimum order quantities. For a swim spa, the practical version of that is simpler: seat layout, jet zoning, cabinet, step orientation, and controller placement.
Fix the configuration before production starts. Ask what the cut-off point is for changes, and what a change after that point costs in both money and calendar time. Also confirm the minimum order quantity for any customised element, since an MOQ attached to a bespoke panel can turn a single residential spa into a multi-unit order.
Commissioning, warranty and spare parts
The installation and after-sales support page lists on-site installation, inspection and snag resolution, warranty coverage, spare parts and replacement, and ongoing maintenance. Ask how each of those applies to your site specifically: who commissions the unit, what the warranty covers for the shell, jets, pumps, heater and controller respectively, and whether those periods run from shipment or from handover.
Then ask about the parts that wear out. Filters, seals, jet nozzles and lighting fittings are consumables in any hydrotherapy unit. A quotation that names them, prices them and states where they are stocked saves waiting on a replacement fitting mid-season.
A pre-acceptance checklist for the WS-130CIII quotation
- Model code, shell dimensions and depth stated exactly as agreed.
- Jet count, jet zoning and swim training system confirmed as included on this configuration.
- Pumps, control system, LED fittings and water treatment itemised with quantities.
- Heat pump, sand filtration, insulation, UV sterilisation and steps shown as included or excluded with prices.
- Total power figure restated with the supply voltage, phase and protection the site must provide.
- Electrical boundary between supplier scope and local contractor written down.
- Foundation, drainage, access and lifting responsibility assigned to a named party.
- Incoterm, delivery address, customs documents, duties and insurance all explicit.
- Payment milestones tied to design confirmation, production start, shipment and delivery.
- Commissioning, warranty terms per component and spare-parts supply described in the same document.
If you are also specifying poolside furniture, pergolas or cabinetry for the same area, request those on the same drawing set so the spa, the deck and the seating layout resolve together rather than in three separate orders.
Comparing against neighbouring configurations
The WS-130 series is offered in more than one shell length and layout, so it is worth reading the adjacent product pages before locking in. The WS-130CIII-U carries the same 11830 × 3000 × 1430 mm catalogue dimensions but is listed without a swim training system, which changes both the equipment list and how the long shell is used day to day. The shorter WS-130BIII at 9950 × 3000 × 1430 mm is the option to price if site length is the binding constraint. Where a project needs a fully personalised shape and hydrotherapy layout instead, the customizable shape outdoor spa page is the starting point, and the full swimming pool and swim spa range lists every configuration in the catalogue.
Compare quotations on the same basis: identical shell length, identical equipment list, identical delivery term. Once the two documents match line by line, the price difference starts to mean something.