A floating vanity looks simple on a drawing. It is one of the most coordination-heavy items in a bathroom fit-out, because the carcass, the wall support, the basin, the countertop, the waste and the lighting all have to agree before anything is cut. The difference between a clean site result and a rework order is usually the quality of the brief the buyer sends to the factory.
SANTERSON builds its Santerson Floating Vanity as a configurable product rather than a fixed catalogue size. The published configuration options are made-to-measure sizing, material and finish choices, and a layout tailored to each project. That flexibility is exactly why the brief matters: every option you leave open becomes a decision someone else makes for you.
Why floating vanities punish thin specifications
A floor-standing unit carries its own weight, so tolerances can hide. A wall-hung unit cannot. The load path runs through the wall, the fixing method and the substrate behind the finish. The clear gap under the cabinet that gives the floating look is also where the waste pipe, the bottle trap and the access point for future maintenance sit.
When a buyer sends only a front elevation and a finish name, the factory produces to what it was shown, and the site discovers the mismatch. Typical consequences are a basin rim that clashes with the mirror or wall light, a drawer front that fouls the tapware spout, an exposed trap where a closed carcass was assumed, or a countertop overhang that blocks a door swing.
The eight items to put in writing
Send these as one document. If a value is not fixed yet, state it as pending rather than leaving it out; a blank field and an undecided field read the same way at the factory.
| 1. Opening and substrate | Finished wall line, clear opening width, and what is behind the wall lining — stud, brick, or a reinforced timber frame. A floating carcass needs a fixing method that matches the substrate, so this determines whether additional reinforcement or a concealed frame is required. |
| 2. Carcass dimensions | Width, height and depth in millimetres, plus finished floor level. State whether dimensions are to the finished wall face or the structural face. |
| 3. Hanging height and clearance | Distance from finished floor to the underside of the carcass, and whether the base is open, panelled or recessed. This single number decides what trap and waste arrangement will fit. |
| 4. Basin type and set-down | Undermount, integrated or vessel. The basin type changes the countertop thickness, the cut-out, the tap hole position and the back-splash detail. Our undermount basin and integrated countertop vanity options are specified differently. |
| 5. Waste and overflow | Waste outlet centre from the finished wall, trap type, and whether the basin has an overflow. Concealed waste inside a closed carcass needs clearance for the trap body. |
| 6. Tapware rough-in | Centre height of hot and cold outlets above finished floor, outlet projection from the finished wall face, and whether the mixer is wall-set or deck-mounted. |
| 7. Storage layout | Drawer stack or open shelf, number of drawers, internal dividers, and any provision for a bin or laundry pull-out. Our drawer units follow the same project-based layout logic. |
| 8. Finish and hardware | Body colour, door front specification, edge treatment, handle or handleless groove, hinge brand if specified, and the finish of basinware and mixers that must be matched across the room. |
Coordinate the mirror and lighting before the carcass is cut
Vanity width is usually set by the mirror or the mirror cabinet, not the other way around. A wall light centred on a mirror that was drawn to a different vanity width will sit off-centre once installed, and electrical outlets cannot be moved cheaply after tiling.
Specify the vanity lighting or wall sconce you intend to use at the same time as the vanity, and give the factory its centre line. Where a mirror cabinet is used, note whether it opens left or right, since a door swing that hits a side wall changes the usable layout of the whole room.
Decide how many bathrooms you are briefing
One master bathroom and a row of identical guest bathrooms need different briefs. A single feature room can carry a bespoke width and an unusual finish. Repeated rooms should be standardised to one or two sizes so that production, spares and site installation stay simple.
For a full bathroom set we also supply matching wall-hung toilets and wall-hung basins, so the wall-hung theme can run through the whole room without mixing unrelated ranges. If your project needs a different configuration for each floor, say so at brief stage rather than after sampling.
Use our custom service to close the gaps
If you do not yet have drawings, our Interior Design Services cover space layout planning, furniture layouts and 3D visual renderings, plus drawing and production coordination with on-site guidance. That route works well when the buyer holds the project but not the detailed joinery documentation.
Where you are specifying to your own drawings, our Custom & OEM Service covers bespoke material finishes and textures, prototyping, flexible minimum order quantities and private labelling. Both routes end at the same place: a confirmed specification sheet that production builds against.
Approve a sample before releasing the room set
For multi-unit work, ask for one vanity built to the confirmed sheet and check it against three things: the drawer fronts sit flush with consistent gaps, the countertop and basin joint reads cleanly at the wall, and the carcass fixing method suits your wall construction. A sample review at this stage catches finish and clearance issues while they are still cheap to change.
Once approved, we produce, pack and ship to site, with freight arranged by sea, air or rail and door-to-door delivery handled through our logistics coordination. Installation support and after-sales service are part of the same scope, so the party that built the unit remains responsible for it on site.
Send us your bathroom elevations. Include dimensions, rough-in positions and the finishes you are matching, and we will return a specification sheet for the floating vanities in your project.