Stone and marble read beautifully on a drawing, yet they are the finish most likely to be value-engineered out at the last minute. Before you release an order for Santerson Stone & Marble Surfaces, use the checklist below to lock down scope, sizing and coordination with the rest of your fit-out.

SANTERSON works as a China furniture and building materials manufacturer supplying project packages for villas, hotels and offices. Stone and marble sit inside that package rather than beside it: they appear in the Countertops & Basins collection as bathroom surfaces, and in the Paneling Systems and Custom Partitions & Paneling collections as wall finishes. Because the same supplier handles cabinetry, vanities, ceramics, lighting and flooring, the questions worth asking are rarely about the slab itself. They are about how the stone is measured, sequenced and installed alongside everything else.

1. Which stone line are you actually specifying?

Three related ranges appear in the catalogue, and they solve different problems:

All three are described as configurable: made-to-measure sizing, material and finish options, and a layout tailored to the project. That flexibility is the point of buying them this way, and it is also why "send us the drawing" is not a sufficient brief.

2. Have you confirmed dimensions against the finished wall, not the structural wall?

The product pages state project-specific dimensions and finish options, and they ask buyers to confirm dimensions and selected specifications for each project. In practice that means your order should reference the completed substrate: plasterboard set-out, waterproofing build-up, tile adhesive thickness, and where the vanity or cabinet carcase will sit.

Three details cause most rework:

  • Whether a countertop is meant to land on a vanity carcase supplied by the same package, such as a double vanity, or onto site-built joinery.
  • Basin choice and how it meets the surface — an integrated basin, a vessel basin (above counter) or an undermount basin each changes the cut-out, edge profile and clearance behind the tapware.
  • Whether a wall panel run stops at a ceiling line, returns into a reveal, or continues around an opening.

3. Which finish and layout have you signed off?

Finish, layout and dimensions are listed as configurable on these pages, so treat the finish schedule as a deliverable of its own. Ask for the specific surface treatment, edge detail and joint arrangement you want, then have them reflected in a shop drawing before production starts. For a multi-bathroom villa or a guest-room floor, that single step is what keeps identical rooms actually identical.

If your design calls for stone on a curved wall, an arched niche or a feature column, ask early whether the standard panel build-up can follow the curve. Where it cannot, SANTERSON also lists flexible alternatives such as MCM flexible travertine stone veneer, described on its product page as thin, lightweight and bendable, for interior and exterior cladding and curved surfaces. Confirm the specification for your configuration rather than assuming one product covers both jobs.

4. Who is coordinating stone with the rest of the package?

Ordering from a one-stop solution provider only pays off if one party owns the interfaces. The site's service pages describe a workflow running from consultation and design through production, logistics, installation and after-sales, with drawings, production coordination and on-site guidance included in project design coordination.

Useful questions to put in writing:

  • Which trades supply the substrate, waterproofing and adhesives on site, and who is responsible for setting out?
  • Do stone dimensions get issued together with cabinetry and vanity dimensions, so both sets of shop drawings agree?
  • Which items ship in which consignment — because a countertop that arrives three weeks after the vanity sits idle in a container.

5. What does custom or OEM cover for this order?

The Custom & OEM service page lists bespoke finishes and textures, prototyping, material choices including engineered stone and laminates, flexible minimum order quantities, and branding options. For a hospitality job that usually means matching a guest-room bathroom to a public-area feature wall, or repeating a signature edge profile across several room types. Ask what is genuinely available for your project, at what quantity, and what it costs in tooling or sampling time.

6. How will the goods reach site, and who inspects them?

Logistics is described as global freight forwarding by sea, air and rail, with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Stone is heavy, brittle and unforgiving of poor packing, so ask specifically how panels and countertops are crated, blocked and braced, which consignment they ride in, and what the receiving inspection covers on arrival.

Take import terms, duties, insurance and transit time case by case for your own destination. Freight arrangements vary by port, incoterm and order size, and marketing copy about coverage is not a delivery commitment.

7. What happens at handover?

The installation and after-sales service page lists on-site installation, inspection and snags, warranty coverage, spare parts or replacement, and ongoing maintenance. Before ordering, ask which of those apply to stone and marble in your market, who performs the installation, and how damage discovered after unpacking is reported. Get the response times and exclusions in writing rather than relying on a general service promise.

A pre-order checklist

Question to askWhat it protects
Which collection is being specified — Surfaces, Paneling Systems or Partitions & Paneling?The right product family for the application
Are dimensions taken off finished substrates with build-ups included?Fitting on site without cutting back
Which basin type meets this surface, and what clearance does it need?Cut-outs, edge profile and tapware height
Is the finish, edge and joint layout shown on an approved shop drawing?Consistency across repeated rooms
Can curved or shaped surfaces be built with this product, or is a flexible veneer required?Curved walls and feature columns
Which consignment carries the stone, and how is it crated?Sequencing and arrival condition
Who installs, who inspects at handover, and what does after-sales cover here?Snag resolution and spares

Bringing it together

Ask these seven questions before the order is released and stone stops being the risky line item. SANTERSON has operated since 2008 as a turnkey furniture and building materials supplier for villa, hospitality and office projects, with published project references in Sydney, Melbourne, Perth, Willoughby and North Turramurra. Send your drawings, room schedule and finish intent early, and let the stone specification follow the same design-to-production coordination as the rest of the package.

Send us your drawings

Share your floor plans, bathroom schedule and finish intent, and our team will return a stone and marble specification with sizing, layout and packaging options for your project.

Product dimensions, finishes, materials and service terms vary by configuration. Confirm the selected specification and installation requirements for each project before ordering.