A swim spa that works in a resort garden, a villa terrace or a wellness deck has to survive more than the design presentation. It has to pass site access checks, plant-room and electrical reviews, and a procurement comparison in which every bidder quotes something slightly different. The catalogue entry for Outdoor Swim Spa WS-130CⅣ is a good starting point, but it is not yet a specification. This article sets out what to put in the brief so that quotations for this long-shell swim and hydrotherapy unit can be compared line by line.

Start with the role the unit plays on the project

Before any equipment list, state in one sentence who uses the spa and when. A hotel guest facility, a residents' amenity in an apartment scheme and a private villa pool deck all place different demands on the same shell: opening hours, simultaneous bather load, cleaning windows, and whether the swim lane is expected to be in use during peak periods. Write that sentence into the brief, because it drives the decisions that follow — pump duty, filtration cycle, heating recovery time and the level of access you require for maintenance.

For a shared or commercial setting, also record the operating model: who holds the water-chemistry duty, who performs filter cleaning, and whether the operator wants a fully integrated control system or separate local control. These are procurement questions, not after-handover surprises.

Record the catalogue data as a baseline, not as the final specification

The published product page gives the physical and equipment envelope for this model. Use it as the common basis on which all bids are prepared, and mark every line that still needs confirmation against the configuration you intend to order.

Item shown in the catalogueCatalogue valueWhat to confirm in the brief
Model referenceWS-130CⅣQuote against this exact reference, and state whether a variant is being considered.
Shell dimensions11830 × 3000 × 1430 mmConfirm against site access, crane or forklift route, structural support and finished surround levels.
Control system1 setAsk what the set controls: water temperature, jets, lighting, filtration cycles.
Swim training system1 setConfirm how the swim current is generated and adjusted, and what the operator can change day to day.
Water pump / filter pump1 pc / 1 pcConfirm duty point, run hours, and spares policy for both pumps.
Jet total20 pcsAsk for a jet layout drawing, not just a count, so seating positions can be checked.
LED lights7 pcsConfirm control grouping and whether colour scenes are fixed or adjustable.
Total power10.85 kWSend this figure to the electrical engineer early; confirm supply arrangement and protection at the plant room.
Features shownWater jets, LED lighting, Ozone, Swim training systemConfirm whether ozone dosing is included in the quoted price or added as an option.

A single line in that table can move a quotation by a wide margin. Total power of 10.85 kW, for example, assumes one particular equipment combination; add a heat pump and the electrical design changes materially. That is precisely why the brief should ask each bidder to price the same defined package rather than a catalogue model number alone.

Price the options list explicitly

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so do not assume an option shown on one product page is fitted to another. In the brief, list each option as a separate priced line with a yes/no instruction, so that two quotations can be compared without guessing what is inside the lump sum.

  • Heat pump and insulation: state the target water temperature and whether the spa sits outdoors year-round. Recovery time and running cost follow from that, not from the shell size.
  • Filtration choice: cartridge or sand filtration changes both the maintenance routine and the plant-room space needed.
  • Steps and access: confirm step position against the finished surround, coping level and any retaining edge.
  • Sterilisation: ozone is shown on this model; if UV sterilisation is also wanted, ask for it as an additional line with its own maintenance note.

Check the sibling variant before you close the specification

The same shell size appears on Outdoor Swim Spa WS-130CⅣ-U, and the two pages do not carry identical equipment: pump count, jet count, lighting count, total power and whether a swim training system appears all differ between them. Exact figures should be taken from each product page and confirmed in writing for the configuration being quoted.

That difference is useful in two ways. It shows that within one length of shell you can prioritise hydrotherapy jet count or a dedicated swim current, and it is a reminder that a procurement comparison must be made on the equipment schedule rather than on the model family name. If the project's priority is a lap-swimming facility, the swim training system belongs in the brief as a required item; if the priority is massage seating for several bathers, the higher jet count variant deserves a side-by-side quotation.

Specification values on product pages describe catalogue configurations. Treat them as the starting point and require written confirmation of the exact equipment set, electrical connection details and included accessories before award.

Where a bespoke shape belongs in the conversation

Sometimes the plot, not the product, decides the outcome: an irregular terrace, a curved internal wall, or a spa that must sit against a seating bench. In those cases ask for a proposal against Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool, which covers square, round, oval and curved layouts with an acrylic shell and structural reinforcement. Keep the bespoke option in a separate section of the brief so it does not blur the comparison between standard models.

For the wider wet-area package — spas, swim lanes and associated pool products — see Swimming Pools and Swim Spas, which is helpful when one supplier is being asked to coordinate several water features on a single site.

A short checklist for the procurement brief

  • One sentence on user group, opening pattern and bather load.
  • Site access route, handling method and structural support note for an 11830 mm shell.
  • Required items separated from optional items, each with a priced line.
  • Electrical load figure passed to the engineer, plus the supply arrangement required.
  • Water-treatment regime stated: ozone, UV, filtration type and cleaning frequency.
  • Delivery terms, offloading responsibility and site delivery window agreed in writing.
  • Commissioning, handover documentation and after-handover support defined before award.

SANTERSON works as a furniture and building materials manufacturer and one-stop supplier, with the swim spa range sitting alongside outdoor furniture, bathroom ceramics, lighting, cabinetry and finishes. For a project that is already consolidating several trades with one source, sending the same brief across the wet-area and outdoor-furniture packages keeps schedules, delivery windows and site coordination aligned instead of running as separate contracts.

Send us the model reference, your site access notes and the option list you want priced, and we will return a configuration for Outdoor Swim Spa WS-130CⅣ with the equipment schedule set out line by line so it can be compared directly against competing bids.