Stone and marble are the finishes a project team is most likely to change late, and the two that cost the most to change late. A slab order that arrives after the cabinetry has been packed cannot be corrected on site. Before any custom Santerson stone and marble surface goes into production, the drawings, the sample, the template and the delivery sequence all need a signature. This guide sets out exactly what we ask buyers, contractors and designers to confirm at each stage.

Two Product Families, Two Different Confirmation Lists

SANTERSON supplies stone and marble in two separate ranges, and they are confirmed in different ways. Getting this distinction right at the outset saves a round of drawings.

Santerson Stone & Marble Surfaces sits in the Countertops & Basins collection. These are horizontal working surfaces: vanity tops, counter runs and basin surrounds for residential bathroom projects. The critical confirmations here are cut-outs, edge profiles, splashback returns and how the surface meets the wall.

Santerson Stone & Marble Panels sits in the Paneling Systems collection, and a closely related Stone & Marble Panels item is listed under Custom Partitions & Paneling. These are vertical surfaces: feature walls, headboard panels, wet-area cladding and partition faces. Here the confirmations shift to substrate preparation, fixing method, panel joints and how corners and openings are resolved.

Both ranges are made to measure. Finish, layout and dimensions are specified per project rather than chosen from a fixed size chart, which is precisely why the confirmation steps below matter.

The rule we work to: nothing enters production until the buyer has signed the fabrication drawing, approved the physical sample and confirmed who is taking site measurements. A verbal agreement on a phone call does not start manufacturing.

1. Confirm the Application Before You Confirm the Material

Natural stone behaves differently depending on where it is installed, so we start with the use case rather than the colour. Tell us:

  • The room and exposure. A guest bathroom, a shared family bathroom, an outdoor poolside counter and a hotel lobby feature wall each place different demands on the surface.
  • Contact with water and cosmetics. Vanities meet water, toothpaste, perfume and hair products daily. Wall panels in the same room may stay dry for years.
  • Expected footfall. A private villa bathroom and a serviced-apartment bathroom with daily turnover are not the same specification.
  • Substrate and structure. Wall panels need to know whether they fix to cement board, brick, framing or an existing finished wall.

If you are specifying stone for a villa or hotel package, it is worth reading this alongside our Turnkey Interior Project Solutions, because the bathroom finishes have to be coordinated with cabinetry, ceramics, mirrors and lighting on one schedule rather than four.

2. Confirm the Material and Approve a Physical Sample

Photographs cannot settle a stone decision. Two slabs of the same named marble can differ noticeably in veining density, background tone and warmth. Before production we ask for a physical sample approval covering:

  • The actual slab or batch the panels will be cut from, not a catalogue image.
  • Surface finish: polished, honed or matte, checked under the site's own lighting where possible.
  • Veining direction across a large panel, and whether the pattern is meant to run continuously across joints.
  • Tolerance range. Where veining varies naturally, agree now what falls inside the acceptable band.

For projects where solid slab weight or a curved wall rules out rigid stone, our flexible alternatives are specified on the same basis. MCM Flexible Travertine Stone Veneer is a thin, bendable sheet that reproduces natural travertine hole texture and wraps curved walls, arches and cylinders. Flexible rock stone panel carries a rugged rock-stone surface on a flexible base and can be rolled for shipping. Both are cut on site with simple tools and fixed with tile adhesive to a cement or plasterboard base. They change the confirmation list: you approve colour and texture, and you confirm the substrate instead of slab thickness.

3. Confirm Dimensions From Site, Not From Drawing Stage

This is the single most common cause of rework. Design drawings give you a starting layout; fabrication needs finished dimensions taken after the wall build-up, tile, waterproofing and floor levels are complete.

ItemConfirm at concept stageRe-confirm before production
Vanity top / counterLayout, basin type, overall run lengthFinished wall-to-wall length, finished floor level, cabinet carcass height
Cut-outsBasin and tap positions in principleExact undermount or vessel rim dimensions, tap hole diameter, waste position
Edge profileProfile styleActual material thickness, bullnose or mitred return, polished arris
SplashbackHeight and whether it wraps a cornerFinished corner dimension and junction with tile or glass
Wall panelsPanel layout and joint patternPlumb and level of the prepared substrate, positions of sockets, switches and showers
OpeningsWindows, doors, nichesReveal depths and head heights after lining

Send us the signed dimensional sheet with the drawing. If a site measurement differs from the issued drawing by more than a few millimetres, we will query it rather than adjust silently.

4. Confirm How the Stone Meets Everything Else

Custom stone fails at the junctions far more often than in the field of the panel. Before cutting, agree every interface in writing:

  • Cabinetry. Our Santerson Integrated Countertop Vanity and made-to-measure bathroom cabinetry are produced to the same opening dimensions as the top that sits on them. If both come from us, one dimensional set governs both.
  • Basins and ceramics. Confirm the exact basin model before the cut-out is machined. Undermount, integrated and vessel basins each need a different cut geometry.
  • Mirrors, lighting and tapware. Wall panel layouts must clear back boxes, sconces and mirror fixings.
  • Waterproofing. In wet areas the membrane detail at the base of a stone panel is agreed with the tiling contractor before panels are fixed.
Ask us to issue a junction schedule for each bathroom: one line per interface, one responsible trade against each. It takes an hour and prevents most site arguments.

5. Confirm Layout, Grain Direction and Joint Pattern

For wall panels and long counter runs, the drawing must show which way the veining runs and where joints fall. A joint that lands on a natural feature line reads as a defect; the same joint placed in a plain field disappears. We ask for confirmation of:

  • Panel numbering against the layout drawing, so each piece is fixed where it was planned.
  • Book-matched, slip-matched or consecutive cutting where veining continuity matters.
  • Joint width and joint colour where a visible shadow gap or silicone line is intended.
  • Which wall the feature panel faces from the room's main sightline.

6. Confirm Lead Time, Packaging and Delivery Sequence

Stone is heavy, brittle and usually last in the build sequence. Before production we confirm:

  • The delivery address for each site and whether goods go to a warehouse or direct to the property.
  • Which container the stone travels in. Stone panels are crated separately and loaded so they are not crushed by furniture.
  • The arrival window relative to cabinetry, tiling and ceramics, so the top is not the first thing on site and the last thing needed.
  • Who receives and inspects the crates, and within what period damage is reported.

Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to site. Import terms, duties and transit arrangements are confirmed project by project, and we will put them in writing in the quotation rather than leave them implied.

7. Confirm Inspection and Installation Responsibility

Decide before shipping who installs. Made-to-measure stone panels and countertops are commonly fixed by your tiler or stonemason, while our Installation & After-sales Support service covers on-site installation, inspection with snag lists, warranty handling, spare parts and ongoing maintenance. Whichever route you choose, we confirm the scope in writing before dispatch so that site preparation, adhesives, sealing and making-good are not assumed by both sides or by neither.

A Pre-Production Sign-Off Checklist

  • Signed fabrication drawing with dimensions taken from the finished site condition
  • Approved physical sample, with slab or batch reference recorded
  • Agreed tolerance band for natural veining and tone variation
  • Basin, tapware and accessory models locked before cut-outs are machined
  • Junction schedule covering cabinetry, tile, glass, waterproofing and electrical
  • Panel layout with numbering, grain direction and joint positions
  • Delivery address, crate sequence and arrival window per site
  • Named receiving party and installation responsibility

Where to Send Your Enquiry

Send the room layout, a fixture schedule and any current stone selection, and we will come back with a fabrication drawing and a specification that lists every item above. For villa and hospitality packages, Custom & OEM Service is coordinated through the same project team as the stone, so cabinetry openings and counter dimensions come off one drawing set.