A swim spa is rarely the hardest item in a villa or resort package, but it is one of the easiest to get wrong. The shell arrives on a crane day, the plant room has already been tiled, and the electrical run stops three metres short of the coping. On projects where furniture, joinery, finishes and wet-area equipment all come from different suppliers, an Outdoor Swim Spa WS-PC07ST can be specified early enough to sit inside one coordinated procurement package instead of becoming a late variation. Below is how the model works with that kind of package, and what to confirm before it goes into a bill of quantities.

Why the swim spa belongs in the fit-out scope, not after it

Wet-area equipment carries dependencies that furniture does not. Setting, drainage, power distribution, structural loading, access for delivery and the finishes that meet the waterline all have to be resolved before adjacent trades close off. When the spa is bought separately from the rest of the package, those dependencies usually surface as site queries, and each one delays a trade that was scheduled around it.

SANTERSON works as a single supplier across interior fixtures, building materials, furniture and pool equipment, so the spa can be specified alongside the cabinetry, wall cladding, lighting and sanitaryware that surround it. Under the company's turnkey workflow — consultation, design and planning, production, logistics, installation and after-sales — one specification set covers both the spa and the terrace or pool house around it. That means a single drawing review rather than four, and one shipment plan instead of unrelated consignments arriving in different weeks.

What WS-PC07ST brings to a coordinated package

WS-PC07ST is part of the configurable outdoor swim and hydrotherapy range. The catalog lists it at 7000 × 2400 × 1470 mm, which places it in the long-shell group where the swim training station and the hydrotherapy seats share one basin rather than competing for length. On a narrow villa terrace or a resort pool deck, that footprint is usually the deciding factor: the width stays within a standard planting or seating zone, while the length gives the counter-current station room to be usable.

Specification shown in catalogValue for WS-PC07ST
Catalog dimensions7000 × 2400 × 1470 mm
Swim training system1 set
Control system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4
Total power6.55 kW

The listed features are water jets, LED lighting, ozone and a swim training system. For a package that also includes lighting products, the four fitted LED lights mean the spa's own illumination can be matched to the deck and garden lighting schedule at drawing stage, rather than being added later as an afterthought.

Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Those are configuration choices with real coordination consequences: a heat pump and insulation package changes the electrical load and where plant can be located; sand filtration changes the pipework route; steps change the approach and the coping detail. Decide them at specification, not at delivery.

The catalog does not list a water pump for this model in the captured specifications, and total power is shown as 6.55 kW for the base configuration. Confirm the included equipment, the finished electrical load and the supply requirements for the exact configuration you order before any electrical design is signed off.

Choosing between the three catalog variants

The same shell appears in three published forms, and the difference matters when the setting is tight:

  • Outdoor Swim Spa WS-PC07ST — 7000 × 2400 × 1470 mm, with water jets, LED lighting, ozone and swim training system.
  • Outdoor Swim Spa WS-PC07ST-L — 7490 × 2400 × 1470 mm, the longer shell of the group, for sites where the extra length can be absorbed.
  • Outdoor Swim Spa WS-PC07ST-S — 7000 × 2400 × 1470 mm, the same footprint as the base model with an automatic cover option shown among its features.

Where a project needs shorter water length but the same width and depth, the range also lists Outdoor Swim Spa WS-PC05ST at 5000 × 2400 × 1470 mm. Specifying two models across one development — a longer shell at the main villa or central pool deck, shorter shells at secondary villas — keeps one supplier, one shipment plan and one maintenance reference, which is where package pricing usually improves.

Site conditions to confirm before ordering

  • Setting and access. A shell of this length needs a clear delivery route and lifting path to the final position. Confirm whether the site can take it in one piece, and where the crane or forklift will work from.
  • Structural support. Whether the spa sits on a ground slab, a deck structure or a podium, the bearing detail has to be designed with the shell's dimensions, not assumed afterwards.
  • Power. Base total power is shown as 6.55 kW, and options such as heat pumps change that figure. Electrical design should follow the confirmed configuration.
  • Drainage and plant location. Filter pump, and any sand filtration option, need an accessible location that does not sit behind a finished wall.
  • Water treatment scope. Ozone is listed as a feature; whether UV sterilization or sand filtration is added changes both the equipment schedule and the maintenance routine handed to the operator.

How one supplier simplifies the package

For buyers, the practical benefit of putting the spa into a single Turnkey Interior Project Solutions package is administrative as much as commercial. One specification set means one round of shop drawings covering the spa, surrounding cladding, cabinetry and sanitaryware. One production window means fewer partial consignments. The logistics service covers freight by sea, air and rail with customs paperwork and door-to-door delivery, so the spa and the finishes that surround it can be sequenced to arrive when the site can actually receive them; import terms, duties and transit times are confirmed case by case for each project.

The same coordination logic applies to the rest of the outdoor zone. The outdoor furniture range — aluminium frames, rope weave, wicker and teak-look tops — can be specified in matching material palettes for the lounging and dining areas around the spa, so the pool deck reads as one design rather than several purchases.

A short specification checklist

  • Fix the model variant against the measured site envelope: 7000 mm or 7490 mm length, both at 2400 × 1470 mm.
  • List the options you intend to order — heat pump, insulation, UV sterilization, sand filtration, steps — and have the electrical and pipework design follow that list.
  • Confirm which equipment is included in the quoted configuration, including whether a water pump forms part of it.
  • Set out the lifting route, bearing detail and drainage connection before adjacent finishes are fixed.
  • Place the spa on the same drawing register and shipment schedule as the surrounding fit-out items.

If you are assembling a villa or hospitality package that includes a swim spa, send us the setting dimensions, the surrounding finishes schedule and your target delivery window. We will return a configuration for WS-PC07ST or the variant that fits, together with the coordination details your site team needs.