A swim spa quotation looks complete until the first site question arrives: what exactly is included in this configuration, what does the site supply, and who signs off on the electrical work? Outdoor Swim Spa WS-S04 sits inside a configurable product range, which means two quotations carrying the same model code can describe materially different scopes. The documentation below is what we ask procurement teams to capture before an order for Outdoor Swim Spa WS-S04 is placed, so the specification in the contract matches the unit that reaches site.

Start with the catalogue record, then convert it into a confirmed configuration

The published record for WS-S04 gives an envelope of 4090 x 2200 x 1110 mm. The equipment listed on the page is one control system, three water pumps, one filter pump, 26 jets including four water columns, and LED lighting made up of three fixtures plus 18 small LED lights, with a total power figure of 8.25 kW. Features shown are water jets, LED lighting, ozone and a waterfall.

Treat those numbers as the starting point of a conversation rather than an order document. The range is configurable: control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps appear as catalog-listed options, and availability and compatibility vary by model. So the first line item in your file should be a configuration sheet that states, for every option, whether it is included, excluded or quoted as an add-on -- with the supplier's written confirmation attached.

Where a specification cell reads "not listed", do not infer presence or absence. The swim training system is one such cell on the WS-S04 record: note what the page shows, then request the confirmed equipment list for your configuration in writing.

Six items to document before you issue a purchase order

Item to documentWhat "complete" looks like in the file
Model and configuration codeExact model designation as it will appear on the shipping documents, plus the option list that defines this build.
Shell envelope and access routeThe 4090 x 2200 x 1110 mm footprint checked against gate width, turning radius, crane or forklift access, and the final position on setting-out drawings.
Hydraulic scopePump quantities, jet count and jet types as confirmed for this build, including which jets are water columns and where they sit relative to seating.
Water treatment and sanitationFiltration route (filter pump versus sand filtration option), ozone function, and whether UV sterilisation is part of the supply or a site-provided item.
Heating and insulationHeat pump included or excluded, insulation package, and the intended year-round use pattern for the location. Operating temperatures are a design input, not an assumption.
Electrical dutyThe total power figure for the confirmed configuration, supply arrangement and circuit requirements, plus who designs and installs the connection at site.
Lighting and water featuresFixture counts for the LED package and confirmation of whether the waterfall forms part of this build.
Interface and civil worksFoundation or plinth design, drainage, steps, surround decking, and responsibility split between the spa supplier, builder and MEP contractor.

Site conditions decide whether the specification is buildable

A spa installed outdoors on a villa terrace or a resort pool deck behaves differently from the same unit in a covered courtyard. Record the installation location, exposure, wind and snow loading assumptions where relevant, and the finish detail around the perimeter. Then confirm what the supplier's scope covers at handover: delivery to the address, offloading, positioning, connection, commissioning, and any snag inspection afterwards.

Import terms belong in the same file as the technical sheet. Incoterms, who acts as importer of record, customs documentation such as commercial invoices, packing lists and certificates of origin, duties, insurance and delivery lead time all affect landed cost. Freight by sea, air or rail with door-to-door delivery is available on project shipments, but terms are agreed case by case for each destination -- a procurement file that records "delivered" without stating the Incoterm is not yet usable.

Where the swim spa sits in a wider package

The same documentation discipline applies across the rest of an outdoor and interior package. Poolside seating, loungers and shade structures need their own material and configuration records, while interior fixtures such as vanities, ceramics and lighting carry separate interface details for plumbing and power. Coordinating those items with a single one-stop solution means one set of drawings, one production schedule and one consolidated shipment plan, instead of separate suppliers each assuming someone else handled the interface detail.

If the standard build needs adjusting -- dimensions, finishes, jet layout or branding -- that falls under custom and OEM service, which covers bespoke material finishes and prototyping. Confirm the option set, minimum order quantities and current capacity for your project before the change is drawn into the contract.

Approval trail: what to have signed and by whom

  • Configuration sheet signed by the client's technical representative, listing included and excluded items.
  • Setting-out drawing showing the spa position, clearances and access route, signed by the architect or landscape designer.
  • Electrical load schedule entry for the confirmed power figure, reviewed by the MEP engineer.
  • Interface matrix naming the party responsible for foundation, drainage, connection, commissioning and after-handover maintenance.
  • Commercial terms page: Incoterm, delivery address, payment milestones, warranty scope and spare-parts route.
Send us the model code, target installation location and your draft interface matrix, and we will return a configuration sheet with included and excluded equipment stated line by line, together with a delivery proposal for your address. Enquiries through our contact page receive a response within 24 hours during business days.