An island bar unit looks simple on a drawing: a block in the middle of an open-plan kitchen, some storage inside, a worktop on top. In production it is one of the least forgiving items in a joinery package, because every dimension has to agree with the kitchen run, the services behind it and the traffic flow around it. The project details below are the ones we ask buyers and designers to settle before an island bar unit is quoted.
1. Room dimensions and clearances
Island footprint, worktop overhang and the aisle between the island and the surrounding cabinetry decide whether the unit works at all. Send the room drawing with overall lengths, the position of the kitchen run, and the walkway you want to keep on each side. Where the plan is still moving, tell us which walls are fixed and which may shift; we build Santerson Island Bar Units to project-specific dimensions rather than to a fixed catalogue size, so a revised opening is not a problem as long as it reaches us before production starts.
2. Layout role: island, wall or integrated
Not every project needs a free-standing block. A galley kitchen or a narrow lounge often suits a Santerson Compact Bar Cabinet against a wall, while an open-plan villa kitchen usually benefits from an island that both serves drinks and separates the cooking zone from the living area. If the bar should visually disappear into the kitchen run, an integrated bar system matched to the surrounding doors is the better starting point. Deciding this early keeps door profiles, plinth heights and worktop edges consistent across the whole fit-out.
3. Services inside the carcass
Wine storage, an undercounter refrigerator, a sink, a glass washer or task lighting each change the carcass, not just the interior fittings. Tell us which appliances are already selected and share their data sheets, plus where water, waste and power land in the floor slab. Appliances chosen later usually mean re-cutting panels, so we recommend locking them down at the design stage.
4. Materials, finish and worktop
Door material and finish should be specified together with the kitchen cabinetry so the two match under site lighting. Our custom and OEM service covers bespoke finishes, textures and edge details, and material choices across wood, metals, engineered stone and laminates. Where a project needs the bar to repeat a wall or wardrobe finish, send the reference sample or the matching product code from the same project rather than a photograph.
5. Storage programme
- Glass and stemware storage, and whether it needs to be open, glazed or concealed behind doors
- Drawer banks for bottles laid flat, and the number of bottle positions required
- Open display niches versus closed cabinets, and how much of the unit faces a public area
- Tall storage that has to line up with the adjacent tall cabinet run
6. Quantity, site conditions and delivery
A single villa unit and a repeat floor type across an apartment scheme are produced and packed differently. For multi-unit work, confirm the number of identical units, the number of variants, and the floor and lift dimensions at the delivery point. We handle freight by sea, air and rail with customs paperwork and door-to-door delivery, and we support on-site installation, inspection and after-sales support; import terms, duties and transit times are confirmed project by project rather than assumed.
What to send us before quotation
| Project detail | How it affects the selection |
|---|---|
| Room drawing with island footprint and clearances | Sets carcass size, worktop overhang and walkways |
| Kitchen cabinetry specification or product code | Keeps door profile, finish and plinth consistent |
| Appliance schedule with data sheets | Fixes carcass cut-outs, ventilation and power before production |
| Worktop material and edge detail | Affects structural support and splashback junctions |
| Storage programme per unit | Determines drawer banks, shelving and display niches |
| Quantity, variants and access route on site | Drives production batching, packing and delivery method |
Product dimensions, materials, finishes and hardware for Santerson bar cabinets are confirmed per project; the product pages list configurable sizing and finish options rather than fixed specifications.
SANTERSON is a China-based furniture and building materials manufacturer supplying custom built-in furniture for villa, hospitality and office projects. Send your drawings and appliance schedule and we will return a specification and quotation for the bar units in your package.