A laundry cabinet quote that looks cheap often costs more later, because the missing line items turn into site variations. If you are sourcing WasherDryer Cabinets for apartments, villas or a residential bathroom package, use this checklist to read the quotation line by line before you sign it.

Why laundry joinery needs a different quote review

Washer and dryer cabinets sit in a damp environment, carry heavy appliances, and have to align with water supply, waste outlets and door swings. Unlike a wardrobe, the cabinet is not finished until the machine fits inside it and the services line up. That means the quotation has to cover both joinery and appliance integration, and any gap between the two shows up as rework on site.

Our Laundry Integration range, including Stacked Laundry Units, Compact Laundry Solutions and the Laundry & Storage Combo, is made to measure for each project. The checklist below is what we expect a good quote to answer, whichever supplier you are dealing with.

1. Appliance dimensions and clearances

Ask the supplier to state which machine models or appliance envelopes the cabinet was sized for. A quote that only lists a cabinet width tells you nothing about service gaps, hose depth behind the machine, or whether the door can open with the cabinet in place.

  • Nominal machine width, height and depth used for the opening, plus the clearance added around it
  • Depth allowance for hoses, power outlet and plug behind the appliance
  • Whether the quote covers a side-by-side layout, a stacked layout or an under-bench installation
  • What happens to the price if the appliance model changes after production starts

2. Made-to-measure dimensions and how they were verified

Off-the-shelf sizes rarely fit a project riser or alcove exactly. Check that the quoted dimensions come from your drawings or a site survey, not from a standard catalogue size that was then rounded to fit.

  • Overall width, height and depth per unit, referenced to a drawing number or room tag
  • Tolerance handling for out-of-plumb walls and uneven floors
  • Whether skirting, architrave and cornice removal is included in your scope or the supplier's
  • Confirmation that final dimensions are re-checked before cutting, since these units are cut to order

3. Materials and finish schedule

A line that says "melamine cabinet, white" is not a specification. In a laundry or bathroom zone the board type, edge treatment and hardware matter more than the colour name.

Item in the quoteWhat you should see specified
Carcase and door substrateBoard type and thickness, and whether it is suitable for a damp interior
Edge bandingMaterial and thickness, with wet areas called out
FinishColour or decor code from a named range, plus sheen level
Hinges, slides and handlesBrand or grade, load rating for drawers, soft-close or standard
Worktop or bench topWhether it is included, its material, thickness and edge profile
Internal fittingsShelf spans and thickness, hanging rail, Pull Out Laundry Hampers, trays

4. What is excluded, stated plainly

Most disputes start with an exclusion nobody read. Ask for the exclusions to be written out, then decide who carries each one.

  • Plumbing, electrical and tiling around the unit
  • Site preparation: packing walls, levelling floors, moving outlets
  • Delivery to floor, lift booking, storage on site
  • Installation labour, trade protection and waste removal
  • Taxes, duties and freight terms if the units are imported

5. Commercial terms that change the real price

  • Currency, Incoterms and whether freight is sea, air or rail
  • Packaging standard and how consignments are split across shipments
  • Payment stages tied to drawing approval, production start and dispatch
  • Validity period of the quote, especially where material prices move
  • How variations to size or finish are priced after approval

6. Quality checks and after-sales position

Ask what you can inspect before goods leave the factory, and what happens if a panel arrives damaged. For multi-unit jobs this is where a supplier's process shows.

  • Pre-production approval of shop drawings and finish samples
  • Photographs or inspection report before dispatch
  • Pack marking by room tag so units go to the right dwelling
  • Warranty scope, spare panel and hardware supply, and who supports fitting

How a made-to-measure supplier answers these questions

We work as a one-stop furniture and building materials supplier, so the laundry joinery is quoted alongside the rest of the interior package rather than as an isolated item. For each unit we confirm made-to-measure sizing, material and finish options, and a layout tailored to the project before production. Design coordination, custom and OEM manufacturing, door-to-door logistics, installation support and after-sales service sit under the same scope, which keeps one party accountable for the cabinet, the appliance opening and the services around it.

That also means you can group the laundry with related built-ins on a single purchase order. Multi Function Tall Cabinets and Utility Tall Cabinets can carry the ironing, hanging and bulk storage that would otherwise crowd the laundry bench, quoted in matching material and hardware.

Before you sign: ask the supplier to confirm dimensions and selected specifications for each project in writing, with the appliance envelope, finish schedule and exclusions on the same page as the price.

A quick quote comparison sheet

CheckWeak quoteQuote you can act on
Sizing basisStandard size, "to suit"Drawing-referenced dimensions with tolerances
ApplianceNot mentionedMachine envelope plus service clearances stated
MaterialsColour name onlySubstrate, edge banding, hardware grade, decor code
ExclusionsAbsent or vagueListed by trade with a responsible party
Logistics"Freight on application"Incoterms, packaging, consignment split, room tagging
After-salesSilentWarranty scope, spares, installation support

Send us your layout, the appliance models you intend to use and the finish schedule you are working to. We will return a quotation with the dimensions, materials, clearances and exclusions set out on one page, so you can compare it against competing offers item for item.