A swim spa quote is rarely one number. On paper two quotations for the same model can differ by a wide margin, and the difference usually sits in what was included rather than in the shell itself. If you are specifying the Outdoor Swim Spa WS-PC06ST-L for a villa terrace, a garden or a resort wellness area, this checklist shows which lines to read before you sign, and which questions to send back to the supplier.

Start with the shell dimensions, not the model code

Model codes in this range are close to each other, and a single letter changes the footprint. The catalogue entry for WS-PC06ST-L lists 6390 x 2400 x 1470 mm, while the closely related WS-PC06ST is listed at 5900 x 2400 x 1470 mm. If your quote carries the shorter figure under the longer model name, the delivery will not match the civil drawings you have already issued.

Ask for three separate measurements in writing: external length, width and depth, plus the internal water length available for swimming, and the clearance the supplier needs around the unit for the plant, access lid and steps. A 6.4 m shell on a terrace also needs an honest answer about how it reaches the slab - crane, forklift or a route through a gate changes the cost of delivery more than most people expect.

Read the equipment schedule line by line

The captured specification for this model shows one control system, one swim training system, one filter pump, six jets in total, four LED lights and a total power figure of 6.55 kW. Treat those as the starting point of a conversation, not as a promise. Suppliers in this category build to configuration, so the quote should state each item explicitly:

  • Swim training unit - quantity and throughput, because that is what determines whether the current is strong enough for real lap swimming.
  • Jets - total count and how they are distributed across the hydrotherapy seating area.
  • Filtration - filter pump quantity and the filtration method actually quoted; sand filtration appears as an option in this range, not always as standard.
  • LED lighting - number of fixtures and where they are located.
  • Ozone and water care - ozone is shown for this model; UV sterilisation is listed as an optional accessory, so check which one your price covers.
  • Control system - one set is listed; confirm the interface type and whether a remote or wall panel is included.
The catalogue specification for WS-PC06ST-L does not list a water pump. If your quotation includes one, ask which pump and at what duty point; if it does not, confirm whether the swim training unit covers circulation in your configuration. Do not assume either way.

Power, heating and insulation decide your running cost

Total power is shown as 6.55 kW for this model. That number alone tells you very little about what the owner will pay each month, because heating is usually where the load sits. Ask the supplier to separate the figures: pump and jet load, control and lighting load, and the heating source - heat pump or another option from the accessory list. A quote that bundles everything into one wattage cannot be compared against a competing offer.

Then check what protects the shell between uses. Insulation is listed among the optional accessories in this range, along with steps. For an outdoor unit that runs year-round on a terrace or in a garden, insulation and a cover belong in the same conversation as the price of the shell, since they drive heat retention far more than any single component.

Confirm site preparation and who is responsible for it

Most disputes in this product category are not about the spa but about the boundary between supply and site works. The quotation should say clearly which party provides:

  • The structural slab or supporting base, and who verifies its load rating.
  • Electrical supply to the unit, including the isolator, protection device and the electrical requirements for your selected configuration.
  • Drainage, overflow route and water fill connection.
  • Steps or access platform - steps are listed as an optional accessory, so decide whether they arrive with the spa or are built on site.
  • Delivery access, lifting equipment and any permit needed for the delivery route.

Get these answers in the same document as the price. A low quotation that quietly excludes site interfaces is not a lower cost; it is a cost that moves to another trade.

Compare quotations on the same configuration sheet

Before comparing two suppliers, send both the same written configuration and ask them to price it item by item. A practical layout looks like this:

Shell model and dimensionsModel code plus external and internal measurements as stated in the catalogue for that exact code.
Standard equipmentControl system, swim training unit, jets, filter pump, LED lights - each with quantity.
Water treatmentOzone, UV sterilisation or sand filtration, and which are standard versus optional.
Heating and insulationHeat pump or alternative, plus insulation and cover if required for the climate.
Electrical dataTotal power, supply requirements per configuration, and who supplies the final circuit.
Packaging and freightPacking method, container plan, Incoterms, and door-to-door or port-only delivery.
Installation and supportOn-site guidance, inspection list, spare parts availability and what the warranty actually covers.

This is also where a single supplier handling several scopes becomes useful. A swim spa rarely arrives alone on a villa or hospitality project - outdoor furniture, paving and wall finishes, bathroom ceramics and lighting usually land in the same window. Working with one one-stop furniture and building materials supplier means one configuration sheet, one shipment plan and one coordination contact instead of several vendors checking each other's drawings.

Ask about customisation before you accept a fixed catalogue size

Where a terrace cannot take a straight 6.4 m shell, ask what the supplier can actually change. In this range, customizable shape outdoor spas are offered in square, round, oval and curved designs with an acrylic shell and structural reinforcement, for gardens, terraces and leisure areas. A supplier willing to rework the shape and layout is usually also able to advise on placement, seating orientation and the hydrotherapy zone - worth asking about at quotation stage rather than after order confirmation.

Five questions worth sending with your enquiry

  • Which model code and exact dimensions does this price cover, and can you confirm them against the catalogue entry?
  • Which items in the specification are standard for this configuration, and which are priced as options?
  • What are the electrical requirements for this exact build, including supply, protection and access to the plant?
  • What is on the site-preparation list, and where does your responsibility end?
  • What is included in installation support, spare parts and warranty, and what is excluded?

A supplier who answers all five in writing has usually built this model before. One who answers with a price list alone will most likely add cost later.

Frequently asked questions

Is WS-PC06ST-L the same as WS-PC06ST?

No. The two entries carry different catalogue lengths - 6390 mm for WS-PC06ST-L against 5900 mm for WS-PC06ST - while both are listed with the same width and depth and a similar equipment list. Always confirm the code on your quotation.

Why does total power matter if I only swim a few times a week?

Because the standing heat loss, not the pump run time, usually dominates the bill for an outdoor unit. The 6.55 kW figure covers the equipment shown in this configuration; heating and insulation choices sit on top of it and are what you should compare between offers.

Can I order the spa without the optional accessories?

Optional items such as UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps are listed as configurable in this range, and availability varies by model. Confirm the selected configuration before ordering rather than adding items after production starts.

Send SANTERSON your drawings, the intended location and the configuration you need for Outdoor Swim Spa WS-PC06ST-L, and you will receive an itemised quotation with standard equipment, options, site-preparation requirements and delivery scope set out line by line - the same configuration sheet you can take to any other supplier for a fair comparison. Contact us to start.