A floating TV unit looks simple on a drawing: a cabinet fixed to the wall, clear of the floor, with the screen above it. That simplicity is why quotes for these units vary so widely. One supplier prices a shallow box on a rail; another prices a full wall system with concealed cable routes, a reinforced backing panel and integrated lighting. Before you compare numbers, make sure both sides are quoting the same thing. The checklist below follows the way a floating TV unit is actually made and installed, so you can read a quotation line by line and know what is included, what is missing and what will cost extra later.

Start With the Wall, Not the Cabinet

Floating units carry their own weight plus the television, soundbar and equipment on a wall that was designed to carry nothing. A serious quotation states how the unit is supported, because that answer changes both the price and the preparation your site team has to do.

  • Support method. Does the quote describe a French cleat, a metal rail, concealed brackets or a steel frame built into the wall? Ask for the fixing type and the load it is rated for, not just "wall mounted".
  • Wall construction. State the substrate on your drawings — stud partition, brick, block, lightweight panel or tiled surface. A supplier who knows the substrate can specify fixings; a supplier who does not will default to generic anchors.
  • Reinforcement responsibility. If blocking or a backing panel is needed behind the finish, whose scope is it — the supplier, the carpentry contractor or the builder? Put it in writing in the quotation notes.
  • Television mounting. Confirm whether the wall bracket and its plate are included with the unit or supplied by the AV contractor, and who sets the screen height.

Dimensions That Must Appear in the Quote

"1800 mm wide" is not a specification. A made-to-measure quotation should break the unit into the dimensions that drive cost and installation, and each figure should be traceable to a drawing you can check.

ItemWhat the quote should stateWhy it matters
Overall envelopeWidth, height and depth, with tolerance for skirting and wall unevennessDetermines whether the unit clears radiators, switches and door openings on site
Floating gapDistance from finished floor to underside of the cabinetAffects cleaning access, cable drops and how "wall-hugging" the look appears
Carcass depthInternal depth behind the wall face, plus equipment clearanceConsoles, receivers and game consoles need real internal space, not nominal depth
Niche and shelf sizesOpen niche height and width; fixed versus adjustable shelvesEquipment heights vary; adjustable shelving avoids rework after delivery
Door and drawer layoutNumber, size and opening direction of doors; drawer count and runner typeHardware quantity is a frequent source of variation between two quotes
Wall panel extentWhether decorative panelling continues beyond the cabinet, and to what dimensionsPanelling that runs floor to ceiling or full wall width is priced separately in most quotes

Materials and Finish: Read the Description, Not the Name

Two quotations can both say "oak veneer" and describe different products. Ask for the substrate and the finish system behind every descriptive name, especially where the unit sits in a living room with sun exposure or in a hospitality scheme where the same design repeats across many rooms.

  • Substrate. Particleboard, MDF or plywood core — this affects edge treatment, screw holding and how the carcass behaves in humid climates.
  • Surface. Veneer, lacquer, laminate, acrylic or melamine. Confirm whether edges are matched, ABS-edged or mitred, since visible edges give a cabinet away quickly.
  • Colour reference. A named colour is not enough for a repeat order; ask for the supplier's own code and, for volume work, a physical sample before production.
  • Interior finish. Are carcass interiors finished to the same standard as the fronts, or left raw? Open niches make interiors visible.

For projects where the media wall is part of a wider joinery package — wardrobes, sideboards and built-in furniture in other rooms — ask whether the same board batch and finish batch covers everything. Ordering one collection from a single manufacturer keeps colour and grain consistent across rooms.

Hardware, Cables and Lighting

The items that decide whether a floating unit works well day to day are the ones most often left out of a low quotation.

Hardware

  • Hinge and runner brand, plus whether soft-close is standard or an upgrade.
  • Push-to-open or handleless profiles, if the design has no visible handles.
  • Load rating for drawers and any drop-down or lift-up door.
  • Whether wall fixings, brackets and level-adjustment hardware are itemised or assumed.

Cable management

  • Position and size of cable cut-outs — behind the screen, behind the equipment niche, or both.
  • Whether a trunking channel or a recessed raceway is included in the carcass.
  • Ventilation for equipment that sits in a closed compartment; enclosed electronics need airflow.

Integrated lighting

If the design includes lit niches or shelf lighting, as with media units with integrated LED lighting, the quotation should separate the strip or profile, the driver or transformer, the switch or control, and where each of those sits. Then confirm who supplies power to the position and who connects the fitting on site: a cabinet can arrive with wiring pre-run and still have no live feed waiting for it.

Commercial Terms Worth Reading Carefully

Once the technical content matches, the commercial lines decide whether two quotes are really comparable. For units shipped internationally, these terms matter more than they do for locally supplied joinery.

  • Packaging and packing list. Confirm flat-pack versus assembled delivery, protective edge treatment and a packing list that matches the drawing numbers, so crates can be routed to the right rooms on site.
  • Delivery term. State the Incoterm explicitly — factory, port or door-to-door — along with who arranges freight, customs clearance and inland transport. A door-to-door delivery service changes what your team has to manage at the destination.
  • Duties and taxes. Ask the supplier to confirm which charges sit inside their price and which fall to you as importer.
  • Lead time. Get a production lead time stated from confirmed drawings and deposit, not from enquiry date.
  • Revisions. Check the cost of design changes after approval; made-to-measure work reprices quickly once cutting has started.
  • Spares and after-sales. Ask how replacement doors, shelves or hardware are ordered for a unit already installed, and what warranty period applies to carcass, hardware and lighting separately.

Questions to Send Back With the Enquiry

A short set of questions early saves a long reconciliation later. Copy these into your enquiry so answers arrive comparable across suppliers:

  • Please itemise support method, load rating and fixing type for our wall construction.
  • Please confirm which party supplies reinforcement or backing panels behind the finish.
  • Please state substrate, surface system, edge treatment and your own colour code for every visible panel.
  • Please list hardware brand, soft-close scope and drawer load ratings.
  • Please mark cable cut-outs, ventilation provisions and lighting components on the shop drawing.
  • Please confirm the Incoterm, what is included in freight, and which charges are the importer's responsibility.
  • Please state production lead time from approved drawings and paid deposit.

Before You Sign

The cheapest quotation for a floating TV unit is usually the one that describes the least. Match the scope line by line — support, dimensions, materials, hardware, cables, lighting, packaging and delivery term — and price differences usually explain themselves. If your project also needs matching joinery, wall panelling or other custom furniture for the same building, ask for a combined package: one set of drawings, one production run and one delivery schedule is easier to coordinate on site than several separate orders.

Send your elevation drawing, wall construction notes and equipment list with the enquiry, and you will receive a quotation you can compare directly rather than interpret.