A flush sliding door looks simple from the outside: one clean panel, no visible frame, a door that disappears into the wall. That simplicity is exactly why an early supplier conversation goes wrong. If you enquire with only a room name and a photo, you will get a rough number that changes once the opening, hardware and finish are confirmed. A short enquiry is faster than a precise one, but it is rarely cheaper in the end.
This guide lists what you should prepare before contacting a supplier about Santerson Flush Sliding Doors, so the first reply you receive is already close to the final one.
1. The opening, measured the way a door maker reads it
Flush sliding doors are made to the opening, not to a standard size, so the measurement sheet is the single most useful document you can send. For each opening, give us:
- Clear opening width and height, plus the wall thickness (the depth the leaf has to sit inside).
- Finished floor level marked on the drawing, so we know whether the floor is already laid or still to be poured or tiled.
- Wall build-up: stud framing, masonry, or a steel frame; and whether the cavity is already closed.
- Position of the opening relative to corners, switches, skirting and services such as pipes or trunking.
- Whether the pocket needs to stop at a corner, turn, or continue into another wall.
If you have architectural joinery or door schedules, send them even when they are incomplete. A schedule that shows one opening as sliding and the next as hinged tells us more than three separate messages.
2. How the door will actually be used
The same panel specification behaves differently in a guest room, a bathroom, a study or a hotel corridor. Tell us the room type and roughly how often the door is opened each day, who uses it (residents, staff, children), and whether it needs to close quietly or latch securely. Sliding leaves that separate a bedroom from an ensuite have different sealing and hardware needs from a study door that stays open most of the day.
Also confirm what is behind the wall. A pocket needs a clear cavity for the leaf to travel into; where that is not possible, a surface-mounted sliding solution or a hinged alternative may suit the wall better. If you are weighing both options in the same room, our team also supplies Santerson Flush Hinged Doors and Santerson Flush Interior Doors, so we can compare the two on your drawings instead of guessing.
3. Finish, and what the panel has to match
A flush door is judged against the wall it sits in. Send the finish you intend for the surrounding surface, not just the door:
- Painted, lacquered, veneered, laminated or wall-panelled — and the colour code or physical sample reference.
- Whether the door should read as a seamless extension of the wall, or show a deliberate shadow gap and line.
- Handle decision: handleless and push-open, integrated recessed pull, or a visible handle that matches ironmongery elsewhere in the project.
- Skirting and architrave treatment at the opening, since these decide how the reveal is detailed.
Where doors must match other joinery on site — wardrobes, panelling, media walls — say which supplier made that joinery. Matching a finish across two manufacturers is a coordination job, and it is much easier to plan at quotation stage than at handover.
4. Hardware and access expectations
Sliding hardware is where hidden cost appears. Before you ask for a price, decide what the door must do:
- Single leaf or twin leaves on one track; pocket depth follows from that choice.
- Soft-close, push-to-open, or plain manual running.
- Lock, privacy set, or no lock.
- Glass rather than a solid panel — for that family we supply Santerson Glass Sliding Doors, with the same made-to-measure sizing and finish selection.
- Access needs: can the track and running gear be reached for adjustment after installation?
If a maintenance access panel is required, mention it at the start. Retrofitting one into a finished wall is disruptive and usually more expensive than designing it in.
5. Programme, quantities and delivery point
Made-to-measure doors are ordered against a schedule, so dates matter as much as sizes. Before you contact a supplier about this collection, have ready:
| Item to confirm | Why we need it |
|---|---|
| Quantity per opening type, with a drawing reference for each | Doors are produced and packed by opening; mixed quantities change the production batch. |
| Required site date and whether delivery is staged by floor or building | Staged drops keep doors out of the trade sequence until walls are ready. |
| Delivery address, port or store, and who receives the goods | Fixes the freight plan and packaging, including protective packing for long panels. |
| Who installs — our team on site, your joiner, or your builder | Determines what setting-out information and fixing details you need from us. |
| Site access for long panels: lift size, corridor width, stair or crane | Full-height leaves cannot always reach the floor they belong to. |
6. The drawings that make a quotation comparable
You do not need finished shop drawings to start. A marked-up set of plans and elevations, with each opening numbered, is enough for us to give you a specification and an indicative price. What we cannot compare properly are verbal descriptions — if two suppliers quote from different assumptions about the pocket, wall build-up and ironmongery, the lower number is usually just the thinner scope.
Our interior design and project service covers space planning, product specification, production coordination and on-site guidance, so where drawings are still developing we can work through the door details with your designer rather than waiting for a complete package. See Interior Design Services and Custom Furniture Manufacturer.
A short checklist before you contact a supplier
Here is what to prepare and send with your first enquiry about Santerson Flush Sliding Doors:
- Numbered opening schedule: width, height, wall thickness, finished floor level.
- Wall build-up and whether the cavity is open or closed.
- Room type, daily use level, and privacy or acoustic expectation.
- Finish reference and how the door should read against the wall.
- Hardware: leaves, soft-close, lock, handleless or pull.
- Quantities, required site date, delivery address, installer.
- Plans and elevations with openings marked, even if draft.
Send those seven items and the first reply will be a specification you can compare against other quotes line for line. If any of them are still open, send what you have and mark it as such — an early conversation about unresolved details is normal, and it is how the right system gets chosen.
Send us your opening schedule
Share drawings, quantities and target dates, and we will return a specification for Santerson Flush Sliding Doors with sizing, finish and hardware options confirmed for each opening.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
As a China-based one-stop furniture and building materials supplier, SANTERSON also coordinates cabinetry, joinery, wall panelling, flooring and lighting for the same project, so doors can be matched to the rest of the fit-out under one programme. Enquiries receive a response within 24 hours during business hours (Monday–Saturday, 8:00 AM–6:00 PM GMT+8).